Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Progressive Failure Of The V-Day Mine And A Comparison With Other Similar Failures In Illinois
By G. C. Marino
The performance of the V-Day Mine near Danville, Illinois has been evaluated from data extending over about a 20 year period. The area included in this study involves over 16 acres. Essentially this e
Jan 1, 1990
-
Development and Implementation of the “Spin to Stall” Resin Bolting System at Anglo Americans Australian Underground Coal Operations
By Ismet Canbulat, John Naylor, Jason Emery, Peter Craig, Andy Sykes
"Longwall mining is by far the most common method of underground coal extraction in Australia. The industry trends and expectations are placing increasing emphasis on the reliability and productivity
Jan 1, 2015
-
Coupon Testing for Field Assessment of Stress Corrosion Cracking of Rock Bolts
By Damon P. Vandermaat
Coupon testing allows for the rapid understanding of a material?s likely behavior in service conditions, allowing engineers and operators to make informed decisions about the likely service-life of pa
Jan 1, 2012
-
Characteristics of Seismic Field Generated by Bed Separation and Application Seismic Technique for Exploration of Bed Separation and Grouting Research
By Jiulong Cheng
Underground coal mining causes overburden deformation and failure, one major form of which is bed separation in the overburden. Surface subsidence can be controlled by injecting grout into the bed sep
Jan 1, 2006
-
Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)
By Larry DeGraff
With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr
Jan 1, 2009
-
The research on the mechanical properties of hard roof in underground coal mining
By Xu Lin Sheng
During the mining course, when the roof above coal seams is constituted by thick and hard sandstone (conglomerate), sudden roof movements often take place with great force and de¬struction which is th
Jan 1, 1989
-
Pillar Strength and Design Methodology for Stone Mines
By Gabriel Esterhuizen
Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd
Jan 1, 2008
-
Development of Low Profile Remote Roof Bolting Module
By Bill Kyslinger
In underground mining, machine design is predominantly dictated by mine conditions and individual customer desires. In partnership with Boart Longyear Poland and KGHM, J. H. Fletcher & Company was ta
Jan 1, 2006
-
The Development and Application of Polyurethane Injectable Cable Bolts
By Dakota D. Faulkner
Cable bolts have been very effective in mine ground control. Non-tensioned and tensioned cable bolts are now used for both primary and supplemental bolting (Suder, 2001; Mirabile, 2010). In the United
Jan 1, 2012
-
New Monitoring Technologies for Measuring the in-situ Performance of Rock Bolts
By Hani Mitri
Understanding the interaction between rock bolts and underground rock movement is critical for safe and cost effective underground excavation design. Although early research on this subject involved a
Jan 1, 2012
-
Successful Application of Rock Bolt Support and Mechanised Depillaring in Difficult Roof Conditions at Tandsi Mine, Western Coalfields, India
By D. C. Oldroyd
Western Coalfield?s Tandsi Mine, has difficult support conditions and a history of roof falls, resulting in mining roadway widths and depths being restricted for safety reasons. Rock Mechanics Technol
Jan 1, 2006
-
Pre-mining stresses at some hard rock mines in the Canadian Shield (2c76bca0-8dd2-4a44-bc9b-85524b3514cf)
By B. Arjang
ABSTRACT: Ground stresses are one of the significant factors in the context of rockbursts and underground instability at some hard rock mines in Canada. Overcoring strain relief measurements using tri
Jan 1, 1989
-
Requirements and Performance of Pumpable Cribs in Longwall Tailgate Entries and Bleeders
By Peter Zhang
Pumpable cribs are being increasingly used in longwall tailgate entries and bleeders for roof support under abutment pressure. Their high peak capacity and confinement-controlled yield characteristics
Jan 1, 2012
-
Quality Assurance in the Processing of Mining-Induced Subsidences and Research Work Into Mining Subsidence Engineering in the German Hard Coal Industry
By Peter Fischer
Between 45,000 and 50,000 claims for subsidence are submitted each year to the German hard coal industry. In order to improve the service to claimants a quality management was established in 2005. Thi
Jan 1, 2006
-
Stability of Slopes in Discontinuously Jointed Rock (4d3fd7d1-f3a8-44f5-b86c-03d96a9b1123)
By T. M. Tharp
Attempts to analyze the stability of slopes, foundations and underground openings in discontinuously jointed rock have generally assumed full joint continuity or ignored the role of stress concentrati
Jan 1, 1984
-
On Research Needs in Coal Mine Ground Control
By Syd Peng
"As the International Conference on Ground Control in Mining (ICGCM) enters its 35th year in 2015, it is time to look back and identify the areas that need to be emphasized and to look forward to see
Jan 1, 2015
-
Classification of Chock Shields Behaviour in an Indian Longwall Mine in Real Time
By Srinivasulu Tadisetty
The productivity and safety of Indian longwall operations are insignificant because of complex geomechanical conditions. Therefore, the continuous monitoring and forecasting of abnormalities is impera
Jan 1, 2006
-
The Back Pressures Associated With Resin Rock Bolt Installations And Methods To Control And Predict It (1a0250a7-1c1e-4686-8a66-dbfc2dd6e095)
By Anthony S. Spearing
The vast majority of the estimated 100 million rock anchors installed in mines in the USA per year use resin cartridges (Tadolini and Mazzoni, 2006). About 4.5 million per annum of these are bolts wi
Jan 1, 2009
-
Roof Control Analysis In North River Mine
By Mike Watts
Since the first longwall panel development started in the new mining, (Southern) area, a number of roof falls have occurred in L1 and L2 gate-entries. The longwall was delayed for a total of two month
Jan 1, 2000
-
Risk Assessment of Surface Fracture Endangered Ranges Over Shallow Mine Workings
By Peter Fischer, Heinz-Jiirgen Kateloe, Anton Sroka, Axel Preusse
"Since mining in Germany has a long history, there are still many locations where the surface fracture problem has to be solved. Shallow mine workings from an earlier era can affect the surface in a d
Jan 1, 2010