    Analysis of Monitored Ground Support and Rock Mass Response in a Longwall Tailgate Entry

    By B. Tulu, D. Gearhart

    A comprehensive monitoring program was conducted to measure the rock mass displacements, support response, and stress changes at a longwall tailgate entry in West Virginia. Monitoring was initiated a

    Jan 1, 2017

  • SME-ICGCM
    Strata Management with Ground Behavior Assessment for Mass Exploitation of Coal Deposits: A Case Study of Continuous Miner

    By Sanjay Kumar Singh

    The mechanics of load transfer in bord-and-pillar mining is not well understood despite the evolution of the art of pillar extraction over the last 20 years via trial and error (empirical) or Rock Mas

    Jan 1, 2012

  • SME-ICGCM
    Field and Laboratory Studies for Mechanised Depillaring Under Easily Caveable Roof Strata

    By Ashok Kumar, Rajendra Singh, Arun Kr. Singh

    "A simple analysis of site conditions and capability of the mechanised depillaring (MD) operation found that this approach is suitable to address the strata control issues in coal pillar extraction un

    Jan 1, 2018

  • SME-ICGCM
    Comparison Of Empirical, Analytical, And Numerical Methods Of Pillar Design And The Development Of A Site Specific Pillar Formula

    By Vincent A. Scovazzo

    Many accepted and useful methods have been developed and used for pillar design. Each method has its own particular strengths and weaknesses. Three methods addressed in this paper are; empirical, anal

    Jan 1, 1995

  • SME-ICGCM
    In-Situ Performance Analysis Of Immediate Forward Support (IFS) Systems In Thin-Medium Seam Sections In The United Kingdom

    By Paul N. Freeman

    This paper describes the in-situ performance of two IFS powered support installations at Betws and Penallta Collieries in the South Wales Coalfield, United Kingdom. Intensive monitoring of all powe

    Jan 1, 1992

  • SME-ICGCM
    Optimizing Drilling Parameters for Improved Bolting Safety and Performance

    By Darin Cotton, Tim Burgess, Tim Martin

    "As the leading US supplier of roof control drills, J. H. Fletcher and Company® has encountered an extensive set of roof strata challenges and has overcome various drilling issues by varying machine p

    Jan 1, 2015

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    Trial of Small Gateroad Pillar in Top Coal Caving Longwall Mining of Large Mining Height

    By Kun Li, Shuaishua Yue, Huigui Li, Yuan Ruifu, Yongxiang Xu, Huamin Li

    "Coal seams in Tashan Mine of Datong Coal Group in China average 49.2 ft (15m) thick and have been mined by the top coal caving longwall mining method of large mining height. Mining height was 12.5 ft

    Jan 1, 2015

  • SME-ICGCM
    Update: Analysis and Case Study of Impact?Resistant Steel Sets for Underground Roof Fall Rehabilitation

    By Dakota Faulkner

    Unexpected roof falls often occur in the entries or intersections of active mining sections in underground mines. For large roof falls (greater than 20 ft in height), it becomes dangerous and impract

    Jan 1, 2014

  • SME-ICGCM
    Development of CAN Manipulator

    By Brian E. Perrine

    Underground mining requires a variety of specialized equipment. With ever-changing mining conditions and methods, some mines have had to resort to purchasing existing industrial equipment and adapting

    Jan 1, 2013

  • SME-ICGCM
    Recent UK Experience of Working above Previously Extracted Longwalls

    By David Bigby

    In the UK, it is becoming increasingly necessary to open new longwall mining areas above old, abandoned workings. In such cases, strategic and gate roadways must often be driven and maintained acros

    Jan 1, 2007

  • SME-ICGCM
    Fully-Grouted, High-Strength, Mechanical Shell Tensioned Bolt Improves Pittsburgh Seam Primary Roof Support

    By Daniel Su

    Approximately 90% of the primary roof bolts used in CONSOL?s Pittsburgh seam coal mines is 2-piece, 8-foot long, 7/8? (or ¾?), high-strength, resin assisted, mechanical shell tensioned bolt. The remai

    Jan 1, 2007

  • SME-ICGCM
    Slope Stability at Open Cut Mining Due to Subsidence on Old Underground Mining Area

    By Andre Zingano

    An underground mine using room and pillar and retreat mining methods was developed during the 1950?s. In 2009 an open cast mine was opened in the same reserve with the objective of mining five coal se

    Jan 1, 2013

  • SME-ICGCM
    The Fault At The End Of The Tunnel

    By S. S. Rowland

    Good afternoon, ladies and gentlemen. It is a pleasure, for several reasons, to be here at this 13th International Conference on Ground Control in Mining. Of course it's always a pleasure to be a

    Jan 1, 1994

  • SME-ICGCM
    Prevention Of Time-Dependent Subsidence By Elimination Of Ground Movement Over An Abandoned Mine

    By V. V. Nazimko

    Abandoned coal mines cause subsidence and structural damages. Shallow abandoned mines induce the most severe and harmful damages. In addition, they produce time-dependent subsidence which is difficult

    Jan 1, 1999

  • SME-ICGCM
    Knowledge Is Power: Introducing the Midas, a New Permissible Datalogging System for Use in Mines

    By Tristan H. Jones

    Beginning in 1987, miniature dataloggers approved by the Mine Safety and Health Administration (MSHA) were publicly available for sale. The principal among these was the model CR21XQM, manufactured by

    Jan 1, 2012

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME-ICGCM
    Strata Control Investigations During Fully Mechanized Coal Pillar Extraction in Indian Coalfield

    By Rajendra Singh

    Considering the importance of a fully mechanized depillaring operation, the Indian coal mining industry has introduced a number of such depillaring operations at depths of cover ranging from 60 m to 3

    Jan 1, 2014

  • SME-ICGCM
    Mine-Wide Monitoring Applications In Ground Control Research

    By David Conover

    Technological advancements in electronic sensors and mine-wide monitoring systems have improved remote monitoring and analysis of underground mining information. The effective use of . these systems f

    Jan 1, 1990

  • SME-ICGCM
    Void Fill and Support Techniques to Stabilize Drift Excavated Through a Transition Zone Mined By a TBM at the Stillwater Mine

    By Josh Johnson, Stephen Tadolini, Mark Ferster, Curt Jacobs

    "Stillwater Mining Company is the only U.S. producer of platinum group metals (PGMs) and the largest producer outside of South Africa and Russia. The Company controls a considerable portion of the J-M

    Jan 1, 2016