Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Simulation Exercises For Training And Educating Miners And Mining Engineers (532ca404-0c9a-4bf0-ba55-3ea258809161)
By H. P. Cole
A team of researchers at the University of Kentucky, working under a USBM contract, developed over 65 simulation exercises for teaching and testing problem-solving and decision-making skills to miners
Jan 1, 1991
-
Use of Simulation to Validate Load And Haul Requirements at Cortez Gold Mines
By W. L. Jacobsen, T. L. Dyer
Cortez Gold Mines is completing a Feasibility Study for a new open pit gold mine in north central NV. The production schedule calls for a peak in material movement. This schedule is based on current o
Jan 1, 2006
-
Grooved Mechanical Couplings In High-Pressure Piping Applications
By Marc Carriere
Bright-orange couplings adorning piping systems are a common sight in just about every underground mine in North America. Grooved mechanical piping, the pipe-joining system that utilizes these couplin
Jan 1, 2011
-
Role Of The Mill In A Competitive Minerals Company - Is Low Cost Enough?
By Bruce Cavender
Historically, the processing function has been regarded as efficiently managed as long as production costs were kept low, recovery was adequate and sufficient plant capacity was avail-able. In this pa
Jan 1, 2008
-
Building An Industrial Mineral Plant Outside The United States Or Canada - A Case Study In Mexico
By Joseph P. Nugent
The new combination gypsum plaster and gypsum wallboard plant of Compania Industrial Kaiser S.A., the first of its kind in Mexico went into production in April of 1969. This was approximately fourteen
Jan 1, 1969
-
Analysis Of Real-Time Shield Pressures For The Evaluation Of Longwall Ground Control Problems
By K. Saikiran, A. R. Nalla
Longwall management, regular shield maintenance, and evaluation of ground control problems can be performed using real-time shield monitoring program. Based on real-time shield pressure data, evaluat
Jan 1, 2000
-
Ground Freezing Deep Shaft Excavation Shaft 17B-1 New York City Water Tunnel No. 3 New York, New York - RETC2023
By Andrew Chegwidden, Tara Wilk
Construction of Shaft 17B-1, a part of The New York City water supply system, required an excavation of approximately 38 m (123 ft) through water-bearing overburden soil and more than 152 m (500 ft) o
Jun 13, 2023
-
Ground Freezing for Deep Shaft Excavation Shaft 18B-1 New York City Water Tunnel No. 3 New York, New York - NAT2024
By Andrew Chegwidden, Tara Wilk
Shaft 18B-1 is the second shaft to be constructed as a part of contract C547A along the New York City water supply system Tunnel No. 3. More complex than Shaft 17B-1, this site has an additional 30 m
Jun 23, 2024
-
Effect of Mercury on The Merrill-Crowe Process at FMC Gold's Paradise Peak Mine
By M. G. Eiselein, R. A. Smith, C. H. Sheerin
FMC Gold's Paradise Peak Mine was one of the top two producers of mercury metal in North America in 1988 and 1989. As a by-product, elemental mercury is produced from cyanide soluble mercury mine
Jan 1, 1990
-
Drill & Blast Implementation Case Study at Multiple Freeport-Mcmoran Sites
By L. Gutierrez, S. Gering, C. Calderon-Arteaga
"Drill and blast represent the most important, and sometimes the costliest processes in the mine. The cost of drilling and blasting operations greatly contributes to the “high cost trends of the overa
Jan 5, 2017
-
Microcomputers and Mining : Administrative and Geotechnical Software
By Thomas C. Shapiro
This is the final article in a three-part series on microcomputers and application software in the mineral industry. The first article covered microcomputer terms and concepts. The second discussed ex
Jan 4, 1984
-
Technology News – Atlas Copco Introduces Hydraulic Breaker
The HB 2500 hydraulic breaker attachment from Atlas Copco Construction Tools features Krupp percussion technology and a service weight of 2,500 kg (5,512 lbs). This makes it ideal for demolition, tunn
Jan 1, 2006
-
The Construction Materials Dilemma
By Roy A. Grancher
Construction materials indeed face a dilemma...as does the building industry as a whole. A stop & go economy; a severe drop; in housing starts; lingering indecision over just what corrective steps are
Jan 1, 1975
-
Laboratory Baffled-Column Flotation Of Mixed Campbell/Eagle Seam Bituminous Coal – Preprint 97-121
By S. K. Kawatra, K. J. Shoop, T. C. Rao, T. C. Eisele
This study investigates the use of a horizontally- baffled column (7.6 cm inside diameter by 344.2 cm high) to reduce the ash content of a high ash bituminous coal. Tests were carried out to determine
Feb 24, 1997
-
Design Of Pebble Crushing Circuit
By Derek J. Barratt
The existence of a critical size buildup in an autogenous or SAG mill can be predicted from proper examination of drill core and ore samples. Methods of dealing with such critical size in a primary mi
Jan 1, 1992
-
Mine Stope Coverage Cuts Acid Mine Drainage
By Joseph J. Feiler
Historical mining operations in Colorado and other western states have resulted in thousands of remnant mine openings. Many are sources of metals loading and acid water generation in surface and grou
Jan 1, 2006
-
Sulfur Reduction From Coal Through Physical Beneficiation - Background
By Albert W. Deurbrouck
The coal reserves in the United States are estimated to be in excess of 300 billion recoverable tons, and current projections of energy requirements indicate our increased dependence upon these reserv
Jan 1, 1986
-
Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022
By Justin Kolster, Donald Benjamin, Kyle White
Expansion of the Plum Island Wastewater Treatment Plant requires interconnection of three operating pump stations using only two existing 10-ft diameter shafts for access. These two existing shafts re
Dec 1, 2022
-
Time-Cost Trade-Off Analyses Of Longwall Face Transfers (9fed35d2-a29b-498b-8fbf-dd4e54acd8ad)
By C. Patrick
Longwall face-to-face equipment transfers or moves are, for many companies, the largest single source of non-productive time in a longwall mining system. Detailed planning and resourceful thinking are
Jan 1, 1994
-
The On-Stream Determination Of Large Scale Ball Mill Residence Time Distributions With Short-Lived Radioactive Tracers
By Robin P. Gardner
The development and use of short-lived radioactive tracer methods for the on-stream determination of residence time distributions in large-scale ball mills is described. Tests are reported on a pilot-
Jan 1, 1978