    Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?

    By John L. White

    The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi

    Jan 1, 1990

  • DFI
    Comparative Analysis Between Traditional and EC7 Criteria Applied to the Design of Diaphragm Walls Concerning the Ultimate Limit States

    By J. Matos e Silva

    "Abstract The paper refers five examples of executed diaphragm walls with one to five levels of anchorages. For each example a comparison is made between the results of the design using the traditiona

    Jan 1, 2014

  • DFI
    State-of-the-Art Rock Socket Analysis and Design for Laterally Loaded Drilled Shafts

    By Aly Mohammad, Dongyi Yue

    "The design of rock sockets for drilled shafts and piles proves to be a challenge for the Design Engineer. The magnitude of loads on the shaft and the behavior of the rock are critical in determining

    Jan 1, 2005

  • DFI
    Ground Improvement By Controlled Modulus Columns - A San Pedro Case Study

    By Sunil S. Basarkar, Vinothkumar S

    Ground Improvement Techniques serves to improve various engineering properties for supporting various foundations. These may be undertaken either by conventional or advanced methods. The Controlled Mo

    Sep 1, 2022

  • DFI
    EFFC/DFI Best Practice Guide to Tremie Concrete for Deep Foundations, Edition 1

    By EFFC/DFI Concrete Task Group

    Concrete technology continues to advance rapidly and modern mixes with five components – cement, additions, aggregates, (chemical) admixtures and water – often have characteristics which differ signif

    Jan 1, 2016

  • DFI
    Session 29 "Grouting for Tunnels 1"

    By Lynn Crayne

    We used Glyoxal as the hardener, at a final concentration of 10% by volume and therefore 20% by volume in the A-Component. They worked pretty well what we did was we shaved the joints on each of the

    Feb 10, 2003

  • DFI
    Recycled Polymer Application During Pile Boring Operations: A Review

    By Hitendrabhai S. Dewangan, Dr. Aashish A. Mehta

    Pile foundation is widely used in construction of marine structures. In offshore & marine piling work, drilling/boring supporting fluid is used to stabilize the borehole (excavation) prior to tremie c

    Sep 1, 2022

  • DFI
    Seepage Cut-Off Wall Installation Using Cutter Soil Mixing for Herbert Hoover Dike Rehabilitation

    By Michael Arnold

    "BAUER Foundation Corp. was one of three contractors awarded with the installation of a cut-off wall at the Herbert Hoover Dike Rehabilitation project. The cut-off wall was constructed up to 84 feet d

    Jan 1, 2015

  • DFI
    Field Measurements Of In-Situ Equipment Track Pressure And Working Platform Deformation Using Earth Pressure Cells And Fiber Optics

    By Peter Faust, Peter Hubbard, Kenichi Soga

    The European Federation of Foundation Contractors (EFFC) and The Deep Foundations Institute (DFI) have set up a task group to compile a Guide for Working Platforms. The first edition of this Guide has

    May 1, 2022

  • DFI
    Performance of Open-Ended Pipe Piles in Cretaceous Soils of Baltimore

    By Sanjeev Malhotra

    "This paper presents the results of a pile installation monitoring and performance assessment program for pile foundations supporting 14 piers and 2 abutments of the 1700-ft long bridge crossing over

    Jan 1, 2005

  • DFI
    Implant Foundations – Press-in Piling Method for Urban Construction

    By Tsunenobu Nozaki

    "Basically, the “Press-in Piling Method” was invented to eliminate construction nuisances, such as noise and vibration which have been serious unsolved problems for advancing societies over a long tim

    Jan 1, 2015

  • DFI
    Technical Note - Load Testing And Interpretation Of Instrumented Augered Cast-In-Place Piles

    By Timothy C. Siegel

    Given that piles are composed of different materials and installed using a variety of methods, ASTM D 1143/D 1143M-07 Standard Test Methods for Deep Foundations Under Static Axial Compression is justi

    Jan 1, 2010

  • DFI
    Construction of 10’ Diameter Shafts for the Olmsted Approach Walls Project

    By Thomas G. Tavernaro, Jeffrey A. Schaefer

    "The $106 million Olmsted Approach Walls Project, completed in the spring of 2004 by Massman Construction Co., Kansas City, MO, is one phase of a new $1.4 billion Corps of Engineers locks and dam faci

    Jan 1, 2006

  • DFI
    Inelastic Response Of Extended Pile Shafts In Laterally Spreading Ground During Earthquakes (Student Paper Competition 2010)

    By Arash Khosravifar

    The seismic design of extended pile shafts for the combined effects of dynamic shaking and liquefaction-induced lateral spreading is investigated using nonlinear dynamic finite element analyses (NDA).

    Jan 1, 2010

  • DFI
    Behavior Of Pile Groups Arrangement Adjacent To A Sand Slope Under Lateral Load

    By Mohamed A. Sakr

    An experimental study on the behavior of pile group's arrangement under lateral load was carried out in the level ground and at crest of sand slope 3H: 2V. Tests were conducted on single pile and

    Jan 1, 2010

  • DFI
    Geophysical Applications For Highway Infrastructure, A Retrospective

    By William M. Dalrymple, William P. Owen, Benjamin S. Rivers

    For the California Department of Transportation (Caltrans), geophysical applications have played an important role as part of a successful multidisciplinary approach to subsurface characterization for

  • DFI
    Is Excess Pore Water Pressure Build Up An Engineering Demand Parameter For Excavation Analyses?

    By A. Felipe Uribe-Henao, Camilo Ballesteros, Luis G. Arboleda-Monsalve, David G. Zapata-Medina

    Conventional excavation analysis based on total or effective stress methods can result in inaccurate estimation of ground movements when impervious soil conditions or rapid excavation sequences are no

  • DFI
    Rapid Load Testing In Germany

    By Marcel Bielefeld, Joost Bakker, Rob van Dorp

    Pile load testing can be performed by a static, rapid or high strain dynamic (generally designated as dynamic) testing method. The static load test is often considered the “gold standard” of testing w

    May 1, 2022

  • DFI
    Unique Anchor Pile SOE System

    By Andrew Stauble

    This project included the replacement of the Long Island Railroad (LIRR) Atlantic 6 Bridge in New York City, which services rail traffic and spans the Van Wyck Expressway and frontage roads. The bridg

    Aug 1, 2023

  • DFI
    Cast Insitu Piling For The King's Wharf Project, Sydney, Australia

    By Slav Tchepak

    The King's Wharf development is located in Sydney's Darling Harbour area. The site was originally used for industrial maritime purposes, which over the years has been reduced to accommodatin

    Jan 1, 2000