Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Achieving Sustainable Community Development - Helping Build Appropriate and Resilient Community Governance Structures

    This paper talks about the experiences of groups we have worked with over the last few years in the Asia-Pacific region (Australia, Canada, New Zealand and Papua New Guinea) and the ways that they hav

    Jan 1, 2009

  • AUSIMM
    Blasting for Reduced Process Plant Costs at Argyle Diamond Mine

    By Smallnone P, Walker B

    Mining of the AKI lamproite pipe at the Argyle Diamond Mine (ADM) commenced in 1985. Originally designed to mine ore at a rate of 3.6 Mt per annum, the project has gone through two major plant expan

    Jan 1, 1998

  • AUSIMM
    Increased productivity using theory of constraints at the Argyle Diamond Mine

    By B Murphy, N Strong, J Albrecht

    Rio Tinto’s Argyle Diamond Mine has a history of underperformance with delivery of ore from the underground operation to the surface for processing with no real clarity in sources of loss and value. I

    Mar 15, 2021

  • AUSIMM
    Advanced Technology for Setting Out of Blastholes and Measurement while Drilling

    By D Xiong, G Xu, L Yao, F Wang, Y Duan

    The goal of this project has been to digitise and use drill parameter data from rotary drilling (measurement while drilling; MWD) for a more effective planning of the blasting process in surface mines

    Aug 24, 2015

  • AUSIMM
    The Mabilo Copper-gold-iron Deposit – A New Skarn Discovery in the Philippines

    By G Maude, R Ayres, R N McLean, N A. Reynolds

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Mabilo copper-gold-magnetite skarn deposit is located in southern Luzon in the Paracale

    Mar 18, 2015

  • AUSIMM
    The use of Geometallurgical Relationships in Process Route Selection and Mine Plan Optimisation for the Dutwa Nickel Project

    By C Czerny, T Elkington, L Lorenzen

    The Dutwa Nickel Project is a nickel laterite atmospheric leach project located in Tanzania that has been under development by African Eagle Resources plc (2012). A bankable feasibility study (BFS) ha

    Sep 29, 2013

  • AUSIMM
    Australia's First and Second Nickel Booms: The Similarities and Contrasts

    Between 1966 and 1976, Australia moved from being a non-producer to a position of meeting more than ten per cent of world nickel demand. New mine developments beginning the early-1990s have the prom

    Jan 1, 1996

  • AUSIMM
    Slime waste to boost agricultural productivity

    By A K. Bhatnagar, S Saha, P Dixit, A K. Mukherjee, P Patra

    TATA Steel’s R&D Division at Jamshedpur has developed a slime beneficiation process to recover iron values from iron ore slime. This process recovers iron ore concentrate containing 2.2 per cent alumi

    Sep 18, 2023

  • AUSIMM
    Fluid Bed Roasting at Mount ISA

    By Casley G. E, Pritchard J

    A single slurry fed fluosolids roaster was chosen to replace six multiple hearth roasters in the Copper Smelter at Mount Isa as part of the overall program to increase production from 100 000 to 15

    Jan 1, 1974

  • AUSIMM
    Draw Control Optimisation along the Production Drift in Sublevel Caving Mines

    By A Gustafson, G Shekhar, P Boeg-Jensen

    The amount of material extracted from each blasted ring in sublevel caving mines is vital when deciding the overall mine production target. The orientation of the production drifts is normally perpend

    May 9, 2016

  • AUSIMM
    Simulation as a Tool for Mine Planning

    By J Greberg

    This paper discusses the use of simulation in the mine planning process. A case study on the Newcrest Cadia East project is presented, and the challenges and possibilities for using simulation as a to

    Nov 22, 2011

  • AUSIMM
    Getting the Burden Right

    By J Poniewierski, Varcos D

    Efficient blasting requires constant vigilance with respect to the actual layout being used in the field. Objective measurement techniques are required in laying out a pattern as the 'by eye&ap

    Jan 1, 1994

  • AUSIMM
    LIBS mineralogy – quantitative mineralogy on the belt

    By D Gagnon, P Bouchard, F Vanier, E Soares de Lima Filho, J El-Haddad, M Sabsabi, G J. Wilkie, A Beauchesne, A Hamel, A Blouin, T Vaillancourt, F Boismenu, A Harhira, A Plugatyr, C Padioleau

    Quantitative mineralogy is an established discipline in the geosciences and is aimed at providing mineral grade and texture information for geological and mineral processing applications. The two core

    Nov 10, 2020

  • AUSIMM
    Geophysical Studies of Rift Structures and Dynamics

    Teleseismic travel time residuals measured on 600-1000 km seismic arrays across the Rio Grande and East African rifts provide evidence for upper mantle low velocity zones beneath each rift of velo

    Jan 1, 1987

  • AUSIMM
    The Artificial Ventilation of the Broken Hill Proprietary Mine, N.S.W.

    UNLIKE coal mines, in which some form of artificial ventilation is rendered necessary by gases given off by the material mined and is also enforced by the mining laws of all countries, metalliferous m

    Jan 1, 1921

  • AUSIMM
    Fire Behaviour in Buffel Grass Dominated Mine Site Rehabilitation in Central Queensland, Australia

    By A Sturgess, P McKenna, P D. Erskine, D Doley, V C. Glenn

    For more than four decades, rehabilitated lands in the Bowen Basin have been planted with buffel grass (Cenchrus Ciliaris), which is often used to provide rapid, stabilising and erosion reducing cover

    Jun 28, 2016

  • AUSIMM
    Column Bioleaching of a Low-Grade Nickel-Bearing Sulfide Ore

    Column Bioleaching of a Low-Grade Nickel-Bearing Sulfide Ore Yellow Mountain Deposit belonging to GobiMin Inc is located in the Chinese Tianshan and Altay orogenic belts, Hami, Xinjiang Province, NW

    Sep 13, 2010

  • AUSIMM
    Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations

    By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans

    A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success

    Mar 15, 2021

  • AUSIMM
    Investigation of silica removal by reverse flotation to improve quality of mixture concentrates produced through spiral gravity separation and Slon-VPHGMS process

    By M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi

    This research was done to reduce silica from mixed hematite concentrate of Barfkar Iron Ore Sample and increase Fe grade using reverse flotation method (Depressing Hematite and floating Silica). The u

    Aug 24, 2022

  • AUSIMM
    Use of drone and LiDAR technology for mapping underground voids

    By D Woolmer

    Since January 2019, BHP Olympic Dam have been trialling the use of a drone based LiDAR mapping system for the purpose for surveying stope voids. This new technology utilises Simultaneous Location and

    Mar 15, 2021