Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mine Water - Optimising for Site and Environment

    By P Thompson, B W. Atkinson

    Water treatment is not æcore businessÆ for mining companies.Just as mineral ores and coals are unique, each requiring detailed characterisation and pilot-testing to determine their optimum beneficiati

    Nov 26, 2013

  • AUSIMM
    Tailing Thickener Operability and Control Improvements at ProminentáHill

    By J Lombardi, M Weidenbach

    "OZ MineralsÆ Prominent Hill copper-gold concentrator is located 650 km north-east of Adelaide, 130 km north-east of BHP BillitonÆs Olympic Dam operation and 130 km south-east of the regional township

    Oct 29, 2012

  • AUSIMM
    Use of Anchored Gaskets in Segmented Bored Tunnels

    By A Roseman, T Gruber

    Traditional methods for installing gaskets for segmented bored tunnels have relied upon different bonding procedures with adhesives that carry a series of disadvantages to segment producers. Fixation

    Sep 17, 2014

  • AUSIMM
    A Process for the Recovery of Cobalt from Speiss

    By Fennell B

    A process for the recovery of cobalt from a speiss produced at Sulphide Corporation is presented. The speiss is leached in oxygenated sulphuric acid to dissolve the metallic iron at a pH of around 4.

    Jan 1, 1983

  • AUSIMM
    Paper No. 179. Concentration of Fine Sands on a Belt Vanner.

    THE machine from which the following results were obtained makes one of a row of seven at work in the Junction North, Concentration Mill at Broken Hill, New South Wales. It consists essentially of a b

    Jan 1, 1909

  • AUSIMM
    The Plabutsch Road Tunnel in Austria

    By Pinter R

    Several major routes connecting Northern and Southern Europe or Asia run through Austria. These highways have to surmount the alpine range which traverses Austria from west to east. In order to en

    Jan 1, 1987

  • AUSIMM
    Closure Cost Estimation - All Things to All Men?

    By H Jones

    Closure cost estimates may be generated at any stage of a mining operationÆs life; commencing with the initial prefeasibility studies and continuing through to the final decommissioning cost estimates

    Nov 20, 2012

  • AUSIMM
    Evolution of rock fill consolidation at Pajingo Gold Mine

    By J Carswell, K McTyer

    The Pajingo gold operation in Queensland is approximately 50 kilometres south of Charters Towers and 134km south-west of Townsville. The resource was discovered in 1983 and first open pit gold product

    Nov 30, 2018

  • AUSIMM
  • AUSIMM
    An Interpretation of the Mt. Lyell Copper Ore Paragenesis

    Observed mineral assemblages in the Mt. Lyell copper deposit can be correlated with phase equilibrium investigations in the systems Cu-Fe-S and Fe-Zn-S. The trend of crystallization (or paragenetic se

    Jan 1, 1963

  • AUSIMM
    Solutions to Acid Mine Drainage at Blackball and Sullivan Mines

    By K Gordon

    A methodology for assessment and remediation of acid mine drainage (AMD) developed at the Sullivan Mine in the West Coast Region has been applied to the closed Blackball Mine, Blackball, West Coast Re

    Jan 1, 2004

  • AUSIMM
    Reducing the Effect of Wind on Airblast Measurement During Blasting

    By K Henley

    One of the greatest practical difficulties of measuring airblast occurs when a significant wind is blowing onto the microphone. Small windscreens are usually used to mitigate the wind noise on the mic

    Aug 24, 2015

  • AUSIMM
    The Effect of Residence Time and Aeration on Coal Recovery Within the High Intensity Zone of a Flotation Machine

    By J A. Cowburn

    The high intensity zone within the Jameson Cell is the downcomer. It is largely external and separated from the flotation tank. This, together with operation of the downcomer under vacuum, rather than

    Jan 1, 2005

  • AUSIMM
    Addressing the challenges associated with the modelling of iron ore in vibrating screens

    By S Reid, W Chen, T J. Donohue, A Katterfeld

    The use of discrete element modelling (DEM) is widespread in the materials handling field, and is used for many applications. One of the important limitations in using DEM is the number of particles t

    Jul 24, 2017

  • AUSIMM
    Mining and the Resource Management Act 1991: Is the Playing Field Level? (27291526-e767-492f-a1b1-38f146759224)

    By Brown AP

    Comparison of legal permits required for mining (as opposed to prospecting or exploration) in New Zealand, under the Mining Act 1971 and the Resource Management Act/Crown Minerals Act 1991. Mining ge

    Jan 1, 1995

  • AUSIMM
    Continuous Measurement of Liquid Retention and Drainage in Porous Media

    The amount of liquid retained in a porous bed is determined by weighing a column containing the bed.The column is attached to the free end of a cantilevered beam, and changes in weight are determined

    Jan 1, 1968

  • AUSIMM
    The Intec Copper Process: A Detailed Environmental Analysis

    By N J. Welham

    The Intec Copper Process is an environmentally advantageous hydrometallurgical process for the production of high purity copper and associated precious metals from copper sulphide concentrates. The pr

    Jan 1, 2002

  • AUSIMM
    Reactions in the Cryolite-Silica System

    Silica reacts with cryolite at 1010°C in two stages. The first stage is the formation of a sodium aluminosilicate of composition consistent with the mineral jadeite (Na20.AI20s.4Si02). The format

    Jan 1, 1972

  • AUSIMM
    Exploration for Platinum Group Element Deposits in Mafic and Ultramafic Rocks

    Platiniferous horizons such as the Merensky Reef that are mined chiefly for their PGE contents constitute one end member of a continuum of Ni-Cu-PGE sulfide deposits; Ni-(Cu) sulfide deposits in which

    Jan 1, 2002

  • AUSIMM
    Assessing Erosion and Run-Off Performance of a Trial Rehabilitated Mining Landform

    By G Hancock, J Lowry, W D. Erskine, D Jones, T Coulthard, M J. Saynor, P Lu

    An 8 ha trial landform was constructed in late 2009 at the Ranger Uranium Mine, located 250 km east of Darwin in the wet-dry monsoonal tropics of northern Australia. The objective of the trial, which

    Jul 10, 2012