    A Method for Sizing Longwall Pillars Based on Field Measurements

    By Christopher Mark

    A new method for the design of longwall pillars, called "Analysis of Longwall Pillar Stability" (ALPS), is described. The method is the final result of a research program that included two major field

    Jan 1, 1987

  • SME-ICGCM
    Numerical Analysis of Some Geotechnical Factors Influencing the Application of Longwall Top Coal Caving

    By Dao Hong Quang

    This paper describes the numerical analysis of some geotechnical factors influencing the application of Longwall Top Coal Caving (LTCC) method. The study was aimed at comparing the differences in stre

    Jan 1, 2008

  • SME-ICGCM
    A Study On Stress Distribution And Reasonable Size Of Coal Pillar In A Coal Face

    By H. C. Li

    Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the wid

    Jan 1, 1992

  • SME-ICGCM
    Caving, Seismicity, and Mine Design in Four Utah Mines

    By Hamid Maleki

    Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in

    Jan 1, 2006

  • SME-ICGCM
    Mine Pillar Stability Analysis Using Fem Methods - Two Case Studies

    By David H. Tang

    Massive pillar failures were observed at two underground coal mines. The results of stability analysis using traditional pillar design formulae did not agree with the underground observations. Finite

    Jan 1, 1990

  • SME-ICGCM
    Gateroads Layout and Entry Support in a Western Longwall Coal Mine in China

    By WenFeng Li

    Comparing to the coal seams in Eastern China, the coal seams in Western China usually have better geological conditions. Therefore, changes in the conventional gateroads layout are required for the We

    Jan 1, 2013

  • SME-ICGCM
    Dynamic rock anchors

    By James J. Scott

    Dynamic rock anchors are interior fixtures developed by the author which promise to be a revolutionary development in the field of ground control. The fixtures are designed to be placed in the ground

    Jan 1, 1989

  • SME-ICGCM
    Application of Neuro?Fuzzy Technique in Mine Support System for Ground Control

    By Sudhir Kumar Kashyap

    In underground activities ground control is a challenging problem. It affects safety, production, and efficiency. As per statistics of accident data, ?fall of roof/sides? is one of the major causes of

    Jan 1, 2012

  • SME-ICGCM
    New Approach in Rock Bolting that Adds to Bearing Capacity and Yield of the Bolts without Increase to the Cost of the Technology

    By Victor Nazimko

    A new technique for reaming the holes has been tested. This technique is available for reaming a hole at its deep end creating an enlarged cavity that has helicoidal grooves oriented at less than 40 d

    Jan 1, 2008

  • SME-ICGCM
    Bi-Directional Shield Recovery in a Wide Face Longwall Move with a Pre-Driven Recovery Room under Weak Roof Conditions

    By Peter Zhang

    Shield recovery in a longwall move is normally conducted from tailgate to headgate. However, if the face is wide and the immediate roof is weak, difficult conditions with considerable roof sag, excess

    Jan 1, 2007

  • SME-ICGCM
    Failure mechanisms in ultra-close seam mining

    By Yingxin Zhou

    Virtually every coal seam in Appalachia will at some time be subject to multi-seam interaction (Wu et al, 1987). Many such problems result from seams which lie in close proximity or have split and lie

    Jan 1, 1989

  • SME-ICGCM
    Track Entry Deformation Subjected to Longwall Mining in the Overlying Seam: a Case Study

    By Wenbing Xie

    At Renlou Coal Mine, Huaibei Mine Area, the track entry deformed significantly after longwall mining in an overlying multiple seams. The supporting characteristics of primary roof bolts and shotcrete

    Jan 1, 2012

  • SME-ICGCM
    Techniques To Investigate Subsidence Events Over Inactive Room-And-Pillar Mines (f8b483c2-2524-4334-950b-cd6315d7aeaa)

    By Yi Luo

    Subsidence events occurred over inactive room and pillar (R&P) mines, including abandoned mines or sealed portions of active mines, are classified as unplanned subsidence because of their timing and d

    Jan 1, 2009

  • SME-ICGCM
    Optimization of the Stress Control Method to Improve Productivity and Safety in Underground Coal Mining

    By Shosei Serata

    The Stress Control Method improves productivity and safety in underground coal mining. The method stabilizes the roofs and floors of mine openings in both shallow and deep coal beds, regardless of whe

    Jan 1, 1986

  • SME-ICGCM
    Pillar Optimization For Initial Design And Retreat Recovery

    By Charles Steed

    The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t

    Jan 1, 2003

  • SME-ICGCM
    Stress Variation on Longwall Powered Supports in Upper Seam due to the Presence of Old Mined Out Workings in Lower Seam

    By Vedala Sastry

    Longwall mining for coal extraction in deeper deposits is gaining momentum in India, due to the increasing stripping ratios and depletion of shallow deposits amenable for surface mining. In longwall

    Jan 1, 2007

  • SME-ICGCM
    Load Transfer Distance Calibration of a Coal Panel Scale Model: a Case Study

    By Mark K. Larson

    Calibration of LaModel for deep coal mines begins with adjustment of overburden stiffness for load transfer distance. This calibration determines whether mining induced stresses are concentrated in th

    Jan 1, 2012

  • SME-ICGCM
    Three-Seam Interaction: A Case Study

    By N. P. Kripakov

    Results of a complex three-seam interaction analysis in a western U.S. coal mine are presented. The physical situation simulated by the models represents the development of a set of entries underneath

    Jan 1, 1996

  • SME-ICGCM
    Comparative Studies In The Mechanics Of Grouted Roof Bolts

    By Stephen P. Signer

    To improve the understanding of the support interaction mechanics between grouted bolts and coal mine roofs and to help lay the foundations for improved design and evaluation techniques, the 0.8. Bure

    Jan 1, 1988

  • SME-ICGCM
    Pillar Strength and Design Methodology for Stone Mines

    By Gabriel Esterhuizen

    Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd

    Jan 1, 2008