Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mine Pillar Design Using the Ground Reaction Curve Concept
By Ravi Ray, Kostas Kaklis, Zach Agioutantis
"Modern underground mining is becoming more complex and geotechnically challenging. The engineer uses numerical, analytical, and data-driven methods (empirical and/or experimental) or their combinatio
Jan 1, 2019
-
Personal Skills: Economic Analysis of Mineral and Energy Investments
By Franklin J. Stermole
L. Alan Weakly, member SME, is a senior staff engineer, Exxon Co. Weakly chaired a Mining Engineering committee formed to solicit materials for six planned "personal skills" articles, to be used in ME
Jan 2, 1984
-
The Role Of The MMAJ And The Activities Of The Japanese Mining Industry In Global Resources Development
By H. Ikeda
INTRODUCTION [Slide 1] The Role of the MMAJ Ladies & Gentlemen, it is a pleasure for me to be able to make a speech at this SME annual meeting, representing the Metal Mining Agency of Japan.
Jan 1, 2001
-
Zinc Alloys Replace Bronze in Mining Equipment Bushings and Bearings
By Tony S. Calayag
Throughout the mining industry today, new bearing materials - ZA* high-performance zinc-aluminum alloys - are reducing costs of maintaining and rebuilding a wide range of equipment. As replacements fo
Jan 7, 1983
-
Super Cycle: The Future
By Douglas B. Silver
Super Cycle future The final topic is mining?s future. The most important questions are ?How much longer is the Super Cycle going to last? What should we expect to see going forward? How will the Sup
Jan 1, 2008
-
Extruded Concrete Lining—The Future Lining Technology for Industrialized Tunnelling
By Siegmund Babendererde, Jan O. Babendererde
Extruded Concrete Lining combines technological and financial advantages. The tunnel lining is reliably embedded in the surrounding ground as the fluid concrete is extruded at constant pressure direct
Jan 1, 2001
-
Enhanced Fire Escape Training For Mine Workers Using Virtual Reality Simulation - Preprint 09-126
Recent U.S. mine disasters identified a need for improved training of miners in escape from mine fires and explosions. Researchers at the National Institute for Occupational Safety and Health?s (NIOS
Jan 1, 2009
-
The Treatment Of Copper Ores And Concentrates With Nitrogen Species Catalyzed Pressure Leaching
By C. G. Anderson
Today, with a stringent economic and environmental climate prevailing in the copper business, there is increased interest in evaluating new processing alternatives for production. Hydrometallurgical p
Jan 1, 2001
-
The Effect Of Bit Geometry And Size On Cutting Parameters In Linear Cutting
By A. W. Khair
This paper deals with the design characteristics of cutting tools and the operating parameters these tools are usually subjected to. Eight types of cutting tools/bits with different geometrical shapes
Jan 1, 2001
-
Image Issues Could Hurt Canadian Oil Sands Plans
While the United States and the rest of the world struggles with record-setting oil prices Canadian oil sands producers are ramping up production to meet demand for oil while also fighting against a h
Jan 1, 2008
-
Using Ultrasonic Anemometers To Evaluate Factors Affecting Face Ventilation Effectiveness (14afe39b-0e42-4a8b-a40b-25465eede38e)
By Robert J. Timko, Charles D. Taylor, Edward D. Thimons, Tom Mal
A test system was developed for measuring airflow in the National Institute for Occupational Safety and Health (NIOSH) ventilation gallery using a three-axis ultrasonic anemometer. The gallery was us
Jan 1, 2005
-
Detail Survey of Polymetallic Nodule- Results of AUV Survey
By Akira Tsune, Shingo Sugimoto, Tadayuki Ishiyama, Nadao Saito, Masatsugu Okazaki
"The Deep Ocean Resources Development Co. Ltd. (DORD) of Japan signed a 15-years contract with the International Seabed Authority for exploration of polymetallic nodule in a 75,000 km2 area, consistin
Sep 1, 2014
-
Drainage Services Department West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme, Design and Build Contract
By David Hake, David Salisbury
The Drainage Services Department (DSD) of the Hong Kong SAR Government commissioned the design and construction of the West Kowloon Drainage Improvement, Stage 2, Phase 2, Kai Tak Transfer Scheme (KTT
Jan 1, 2005
-
Metallurgical Development And Design For The Pascua Lama Project
By R. A. Williams
The Pascua Lama Project is situated on the border of Chile and Argentina at an elevation of 4,800 m. The ore contains gold, silver and copper, and an initial milling production rate of 33,000 t/d is
Jan 1, 2001
-
Educational Programs And Partnerships In Mineral Engineering
By Wijnand Dalmijn, Hans de Ruiter
Experience over the past eight years has proven that partnership and cooperation in mineral engineering education is essential to maintain programs in this field. At this moment the joint European Min
Jan 1, 2005
-
High Speed Communications In Harsh Environments
Extending an organization?s knowledge base throughout the entire enterprise can improve operations. Until recently, though, field operations were often left out of the information loop, as extending
Jan 1, 2009
-
A Slope Stability Analysis For The Trojan Pit Expansion At The Wharf Resources Mine, Black Hills, SD
By V. L. Franzen, Z. J. Hladysz, C. A. Kliche
The Wharf Resources mine, located in the Bald Mountain Mining District approximately 6.4 km (4miles) west of Lead, South Dakota, has operated a surface gold and silver mine and heap leaching processin
Jan 1, 2000
-
Dewatering, Treatment, And Beneficial Reuse Of Water From The Resolution Copper Mine - Introduction
Resolution Copper Mining LLC (RCML) is currently in a Pre-feasibility study evaluating a large and deep copper and molybdenum deposit in the historic mining district east of Superior, Arizona. Work sc
Jan 1, 2011
-
Towards a More Cost Effective Mining Truck – Preprint 97-55
By A. W. Dickerson, G. Hollier, F. A. Bartley
Following on from many years of research aimed at improving the effectiveness of truck haulage operations in mines operated by BHP Minerals, BHP Research developed a concept for an Innovative Large Mi
Feb 24, 1997
-
Risk Management in Action—Controlling Difficult Ground by Innovation (dbc5f12b-b47f-4e14-bceb-0a19e2c07d89)
By A. Moergeli
The Swiss are currently building the world’s longest tunnel, the 35-mile long Gotthard Base Tunnel. At Sedrun, for the first time in tunneling, four Roadway Support Machines will drive through most di
Jan 1, 2005