New Load Testing Device
By Jorj O. Osterberg
This paper is for presentation at the 14th Annual Members Conference of the Deep Foundations Institute held at the Hyatt Regency Hotel, Baltimore Maryland on October 10, 1989. This is an introduct
Jan 1, 1989
-
Exploring the Historical Development of Geotechnical Engineering
By Thomas Kennedy, Michael Bennett
"History never repeats itself, but it often rhymes." The old aphorism reflects how the study of the past may, perhaps, be most widely valued when it can be used to improve current and future decision
Jan 1, 2023
-
Piled Raft System - Approximate Design Methods. - Synopsis
By S. L. Karunakaran
There are cases where it is found that a raft foundation would have adequate factor of safety against ultimate bearing capacity failure but the settlements would be excessive. Piles may be introduced
Jan 1, 1996
-
Ground Improvement For The Deep Foundation Of A 650 M Long Quay Wall In The Port Of Hamburg
By Peter Arz
In the port of Hamburg a 650 m long quay wall was completed in mid-1985. The watertight wall consists of loadbearing steel buttress piles PSP 1012 which are up to 28 m long and infill interlocking she
Jan 1, 1987
-
Pile Foundations In Liquefiable Soils - A Case Study - Synopsis
By R. K. M. Bhandari
Geotechnical investigation for a LPG plant located in Assam state - an area of high seisimicty - revealed a layer of loose to medium silty sand susceptible to liquefaction at some depth below the fini
Jan 1, 1996
-
Safe Load Of A Single Pile In Earthquake Loading - Synopsis
By Shamsher Prakash
Estimation of vertical load carrying capacity of a single vertical pile under earthquake loading is an important task of a design engineer. Lateral vibration of vertical pile is highly influenced by t
Jan 1, 1996
-
The Realities Of Resolving Conflicts During Construction ? Synopsis
By J. S. Ward
In a well-written set of contract documents, the probability of conflicts arising during the course of construction is minimized. However, no matter how complete may be the technical language in the c
Jan 1, 2010
-
Drilled Piers Support Massive Gantry Crane
By John R. Davie
This paper describes the design and construction of two 5.6 MN capacity drilled piers installed to support the main loading elements of a large cantilevered gantry crane. The critical crane columns we
Jan 1, 2006
-
A General Formula To Determine The Allowable Pile Bearing Capacity In Case Of Negative Skin Friction ? Summary
By Cornelis Van Der Veen
Foundation piles, partly passing through unconsolidated compressible layers, suffer a downward drag that is called negative skin friction. The negative skin friction depends on the movement of the sur
Jan 1, 2010
-
Foundation Contracts And Law - Part -1: Relevan[i] Law
By Kirty Dave
Foundations in any contract are the most uncertain parts of the contract and most of the "Construction-Contract-Disputes" are either directly related to foundations or arise as 'Side-effects of c
Jan 1, 1996
-
Multiple Foundation Types For Bridges Over The Same Coal Mine
By Kenneth M. Berrry
A unique situation has developed at an abandoned coal mine in St. Clair County, Illinois. Subsidence features have been observed at the ground surface over the mine including settlement of a pair of b
Jan 1, 2001
-
Analysis Of Vibratory Driven Pile ? Introduction
By Sherrill Gardner
Vibratory drivers have been used since the 1930s to drive and extract piles. Vibratory pile drivers have the capability of significantly decreasing pile installation time, especially in granular type
Jan 1, 1987
-
A Sound Concept that Deserves to Be Expanded
By Deep Foundation
Whenever an organization launches an initiative, the question arises whether that initiative has staying power. Or is the initiative, as is quite often the case, merely a fad; that is, just an activit
May 1, 2023
-
Construction Of Foundations For Zuari, Mandovi Railway Bridges In Goa ? Synopsis
By N. V. Nayak
Konkan Railway Project is one of the most ambitious railway construction projects in India, involving construction of a 760.km long, Broad Gauge (1676 mm), single track railway line, connecting Roha i
Jan 1, 1996
-
Presentation #7 - Bi-Directional Static Load Testing - Load Testing High Capacity Piles What Have We Learned?
By Jorj Osterberg
550 load tests of up to 150 MN have been completed on driven and bored piles using the Osterberg Load Cell. Because the test measures side shear and end bearing separately, much can be learned about t
Jan 1, 2001
-
Uncertainties Arising During Drilling And Performance Of Flight Auger - Cast Piles
By F. M. Abdrabbo
Flight auger bored piles are formed by screwing a continuous flight auger into the ground, and pumping cement/sand grout or concrete down the hollow stem of the auger as its withdrawn. The auger is dr
Jan 1, 1993
-
Evolution Of Deep Foundation Systems Used At The Port Ivory Intermodal Facility Site; 1906 ? 2004
By Aly M. Mohammad
The Howland Hook Terminal Facility located in Staten Island, New York is one of the most active container terminals in the Northeast United States. Due to the high capacity of the facility, the Port A
Jan 1, 2004
-
Session 15 "Jet Grouting IV"
By Mitsuhiro Shibazki
I can't answer that question but I am looking at Andy, my co-author, and he says we didn't measure it. No movement. If I understand it correctly, how do we handle lateral forces in shear? T
Feb 10, 2003
-
Construction of Jacking Pits in Boston’s Central Artery/Tunnel Project
By Arturo Ressi di Cervia
"The Construction of the Thrust Pits for Jacking of the I-90 Tunnel for the Central Artery/Tunnel Project (Part of Contract No. C09A4) in Boston MA was nominated for DFI’s 2002 Outstanding Project Awa
Jan 3, 2003
-
Construction Of A Bicycle And Pedestrian Path West Of The Henry Hudson PWY
By David Coleman
This paper presents a case history involving the installation of drilled in piles with rock sockets for the Bicycle and Pedestrian Path project located west of the Henry Hudson Parkway within the Rive