    Microstructural evolution in AA6111 aluminum during cold work and aging

    By G. K. Quainoo

    In the automotive industry, the awareness to meet Corporate Average Fuel Efficiency (CAFE) standards has evolved the need to reduce vehicular weight in new automobile designs, with the overall goal of

    Jan 1, 2005

  • CIM
    Microcel Column Flotation Scale-Up and Plant Practice

    By Roe-Hoan Yoon

    "Industrial flotation columns often suffer from low recoveries and high maintenance requirements because of poorly-designed air spargers. The MicrocelTM bubble generators were developed at Virginia Te

    Jan 1, 1994

  • CIM
    Treatment of Hydromet Processing Crude Using Decanter Centrifuge

    By J. Kramer, T. Hartmann

    In the Hydrometallurgical processes, the presence of the so-called “crud” is a constant challenge in solvent extraction. Crud is a stable emulsion which forms along the interface between the aqueous a

    Jan 1, 2012

  • CIM
    Analysis on Sag Mill Liner Failure

    By E. Vesely, A. Saxena

    "SAG mill liners are designed for protecting the mill shell and providing lifting power for ore charge and grinding media. Due to the impacts from the charge and the grinding media, the liner experien

    Jan 1, 2019

  • CIM
    Laboratory Study of 3D Velocity Distribution of P and S Waves in Rocks: Comparison of High Pressure Study and Texture Based Calculated Data

    By T. Ivankina, T. Lokajícek, H. Kern, T. Svitek

    The knowledge of 3D velocity distribution of P- and S-waves in rocks is very important parameter for interpretation and understanding the nature of seismic anisotropy observed in the earth’s crust and

    Jan 1, 2015

  • CIM
    A Pilot-Scale Examination of a High Pressure Grinding Roll / Stirred Mill Comminution Circuit

    By J. A. Drozdiak

    In this paper we examine, through pilot-scale testing, the possibility of operating a circuit comprised of two stages of HPGR comminution, followed by grinding through a horizontal stirred mill. In or

    Jan 1, 2012

  • CIM
    Recent advances in Canadian coal preparation

    By Brian Raymond

    This paper will outline the problems and solutions of the new generation washeries, as well as the recent technological advances which are being considered for future coal preparation plants. The subj

    Jan 1, 1979

  • CIM
    Using Operational Readiness and Plant Trials to Successfully Implement a Process Flowsheet Change

    By C. H. Buck, A. J. Taylor

    "In 2015 Vale’s Clarabelle Mill began the process change to enable a higher degree of Cu separation. The flowsheet modification was part of a complete divisional flowsheet change being implemented in

    Jan 1, 2018

  • CIM
    Recovery of Europium and Yttrium from Spent Fluorescent Lamps

    By M. A. Rabah

    This study aims to recover europium, yttrium metals, some valuable salts or oxides from the white powder (apatite) coating the inner surface of spent florescent lamps (SFLs). Pressure leaching using s

    Jan 1, 2004

  • CIM
    Permafrost Problems in Oil Development in Northern Canada

    By R. A. Hemstock

    "OIL EXPLORATION in Western Canada has produced outstanding results in the past few years. From such successes as Leduc and Redwater on the western plains, oilmen are now moving north in the ever-wide

    Jan 1, 1952

  • CIM
    Dynamic wetting spread factors and interfacial heat transfer coefficients in the solidification of aluminum droplets on copper substrates

    By D. -A Tremblay

    Dynamic wetting spread factors and interfacial heat transfer coefficients were determined for aluminum droplets solidifying on copper substrates, The spread factors were determined from the droplet ge

    Jan 1, 2005

  • CIM
    Better Flowsheeting with Modern Process Mineralogy

    By Norman O. Lotter

    The problem of quantifying the full performance potential of an ore body in a concentrator, and how to configure a flowsheet to achieve that potential, either for a new operation or an existing one, i

    Jan 1, 2011

  • CIM
    Large Wheel Loaders as Primary Loaders in Mining

    By W. A. Haley

    This paper discusses how a large wheel loader should be equipped, with particular attention paid to tires and tread life, and describes the several steps that can be taken to provide favorable working

    Jan 1, 1969

  • CIM
    Indicator mineral and till geochemical methods for kimberlite exploration in glaciated terrain (526cabe2-e08e-448c-950e-0f39e1fcecab)

    By M. B. McClenaghan

    "This paper summarizes diamond exploration techniques used in glaciated terrain, focussing on indicator mineral and geochemical methods applied to glacial sediments. Understanding the ice flow history

    Jan 1, 2002

  • CIM
    The Rôle of Water Power in the Mining Industry of Canada

    By Norman Marr

    Introduction In Canada, the mining industry and water-power development are intimately associated in that mining, which ranks second among the country's primary industries, depends principally

    Jan 1, 1949

  • CIM
    The Tungsten-Bismuth-Molybdenum Deposit of Brunswick Tin Mines Limited: Its Mode of Occurrence, Mineralogy and Amenability to Mineral Beneficiation

    By Wm Petruk

    "The tungsten-bismuth-molybdenum deposit in southwestern New Brunswick occurs in greisenized and silicified tuffite * and feldspar porphyry in and adjacent to volcanic necks. The ore minerals occur as

    Jan 1, 1973

  • CIM
    Resource and reserve evaluation in the presence of imprecise data

    By J. M. Ortiz, J. P. Bertini

    "In mineral resource and ore reserve estimation, several sources of information are generally available, such as diamond drillholes, reversed-circulation drillholes, and blastholes, and originate from

    Jan 1, 2005

  • CIM
    Progress in Coal Mining Technology (96be6499-4406-45a3-aa5f-2bc856cde4c1)

    By A. Ignatieff

    This is the second review of developments in coal mining engineering (see C.I.M .M. Transactions, Vol. LI, 1948, pp. 262- 264) and covers the period from October, 1948, to January, 1950. Mechanizat

    Jan 1, 1950

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    Geometallurgical Modeling - The New Approach to Plant Design and Production Forecasting/Planning, and Mine/Mill Optimization

    By Dave Bulled, Chris Bennett, Glenn Kosick, Glenn Dobby

    "Mining companies around the world are embracing geometallurgical modeling at a rapid rate, as senior executives realize that inputs must be properly measured if the output is to be managed effectivel