Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Primary-Response Framework for Geometallurgical Variables

    By M Stewart, J Vann, S Dunham

    Geometallurgy is an emerging, cross-disciplinary field that integrates spatial models of rock properties with time-based outcomes of mining and treatment processes. Geometallurgical variables include

    Jan 1, 2009

  • AUSIMM
    The Role of Blasting Instrumentation in Promoting Mining Profitability

    Blasting is known to be both an important and an easily quantified cost factor in rock breaking operations. However, the indirect costs and benefits of the blasting operation are not easily determin

    Jan 1, 1990

  • AUSIMM
    Murray Basin Ilmenite ù Realising the Value

    By T J. Scanlon

    Heavy minerals recovered from recently discovered deposits in the Murray Basin are proving to be somewhat more difficult to process into saleable ilmenite products than ilmenites from existing operati

    Jan 1, 2001

  • AUSIMM
    The Development of a New High-Energy Absorption Mesh

    By G Giles

    One of the main tools used by mining operations to mitigate the risk of rock burst is the installation of a so-called ædynamic resistantÆ support system. Such systems are designed to absorb the impact

    Jan 1, 2008

  • AUSIMM
    Application of Unique SONAR Array Based Process Monitoring Measurement Equipment for Process Throughput/Efficiency Improvements and Measurement Point Cost Reduction

    By C OÆKeefe, A Thomas

    Boom time in the mining industry has presented mill operators with several unique challenges including the need for increased throughput while being constrained by a shortage of skilled labour and agi

    Jan 1, 2009

  • AUSIMM
    Stability of Raise Bored Shafts in Australian Mines

    By M F. Lee

    In order to make good decisions, as to whether large diameter raise bored shafts can be constructed in blocky rock at a particular location, mine planners, management, geotechnical engineers and contr

    Jan 1, 2008

  • AUSIMM
    Water Supply Options for the Pilbara

    By K Zic, P Pickering, P Fraser

    Water is a defining feature of the Pilbara. Its management was and remains vital for the pastoral industry which European settlers established when they first came to the Pilbara, and for the mining i

    Jan 1, 2009

  • AUSIMM
    Investigations of Calcium Aluminate Compounds by Different Synthesis Methods

    By H P÷llmann

    Calcium aluminates, calcium aluminate ferrate and calcium aluminate sulfate were synthesised by solid-state reaction, sol-gel method, a self-combustion method and by a polymeric precursor process. For

    Jan 1, 2008

  • AUSIMM
    Don Hausen, Pioneering Newmont Mineralogist and Mentor - His Influence Continues on at Newmont Today

    Don Hausen was a pioneer in the field of quantitative mineralogy. Methodology that he developed at Newmont almost 40 years ago is still employed today, only the technology has advanced. Petrographic m

    Jan 1, 2008

  • AUSIMM
    Resin Encapsulated Rock Bolt Practices at Mount Isa Mines

    By I Thin, I Sheppard

    Resin encapsulated rock bolting practices have been adopted by Mount Isa Mines since the early-1980s. Fully encapsulated rock bolt systems meet designated requirements for long-term ground support in

    Jan 1, 2002

  • AUSIMM
    Using Millimetre Wave Radar to Monitor In-Stope Backfilling at Olympic Dam Mine, South Australia

    By S Youds

    The backfilling operation at Olympic Dam mine supports a 9.8 Mtpa underground Long Hole Open Stoping (LHOS) operation. It involves a combination of Cemented Aggregate Fill (CAF), surface rockfill and

    Jan 1, 2002

  • AUSIMM
    Geodynamics of Giant Porphyry Ore Deposits

    By D Giles

    We present plate tectonic reconstructions, showing that porphyry-type ore deposits are spatially and temporally linked to ridge subduction. A reconstruction of the Peruvian subduction system reveals a

    Jan 1, 2008

  • AUSIMM
    Regeneration of 2-Naphthol from Cobalt Precipitate

    By Haigh C. J

    A process has been developed to recover at least 75% of the 2-naphthol contained in cobalt precipitate produced during the removal of cobalt from electrolytic zinc plant solution. The recovered mat

    Jan 1, 1977

  • AUSIMM
    Olympic DamÆs Underground Rail Haulage System ù Six Years On

    By C Fearon

    This paper discusses the implementation of an underground rail haulage system during a major expansion of the Olympic Dam mine in 1998. The factors affecting the selection of rail haulage are discusse

    Jan 1, 2005

  • AUSIMM
    Slope Stability Radar for Managing Rock Fall Risks in Open Cut Mines

    By N Harries

    The management of risks associated with slope instability is an essential process in the safe and economic operation of open cut mines. The æslope stability radarÆ (SSR) has been developed to better m

    Jan 1, 2007

  • AUSIMM
    Mineral Exploration-Risk Increasing

    Exploration risk increases with time, due to a general decrease in prospectivity as the more accessible deposits are found, and be- cause of rising costs and demands due to an improving standard of

    Jan 1, 1987

  • AUSIMM
    The Development of a Heal Stress Monitoring Instrument

    How many of you have felt tired and light-headed after standing or working in the sun or by the oppressive, hot, muggy conditions of an Australian summer? For those of you who have, you've exp

    Jan 1, 1994

  • AUSIMM
    Geology and Tectonic History of the Palaeozoic Hodgkinson and Broken River Provinces, North Queensland

    By Donchak PJ, Lang SC, Hammond RL, Bultitude RJ

    The Hodgkinson and Broken River Provinces form the northern part of the Tasman Orogen. They are separated by a broad belt of Late Palaeozoic igneous rocks, but were probably originally continuous.

    Jan 1, 1987

  • AUSIMM
    Laboratory Evaluation of a "Difficult-to-Treat" Ore at Renison

    Gravity concentration of tin at Renison Limited uses tables and spirals to treat the various coarser fractions produced from sulphide flotation tailing. An acceptable final tailing cannot be made f

    Jan 1, 1978

  • AUSIMM
    Acid Progress for Alumina Extraction

    The CSIRO acid alumina employs the essential steps of digestion, hydrolysis and calcination to produce pure alumina from ores too high in silica or too low in grade for the Bayer process. The two latt

    Jan 1, 1963