Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design of Shallow Caverns in an Urban Environment

    By S Pollak, A Amon

    This paper describes the current and finished design work which has been performed for shallow rock station caverns for New York CityÆs first new subway construction in 60 years. A new robust, sophist

    Jan 1, 2008

  • AUSIMM
    The Baal Bone Coal Preparation Plant - A Case History

    As an indication of the overall quality for the three periods the expected run of mine ashes are given. Operating Period R.O.M. Quality Years 1 - 4 22.0% Ash (db) Years 5 - 14 18.8% Ash (db) Year

    Jan 1, 1986

  • AUSIMM
    Friction and Sliding of Joints

    Methods of measuring the frictional properties of rock surfaces, both by direct sliding and in triaxial apparatus, are described. It was found that for some rocks the coefficient of friction remains r

    Jan 1, 1969

  • AUSIMM
    Mechanism of Anionic Collector Adsorption in Chromite Flotation

    By Onal G, Celik MS, Dogan MZ

    Chromite tailings assaying 21.2 per cent Cr2O3 was upgraded to 48.7 per cent Cr2O3 at a recovery of 72.0 per cent using column flotation with a mixture of anionic collectors at pH 11. Electrokinetic

    Jan 1, 1993

  • AUSIMM
    Fragmentation Control and Underground Automation

    Compared with modern longwall coal mining systems, automation has not been developed very far in the underground metal minin industry. One of the main reasons for this is that present har rock mining

    Jan 1, 1985

  • AUSIMM
    Groundwater Search Management In Desert and Arid Terrain - A Case History Telfer, Great Sandy Desert, Western Australia

    During the intial two years (1972 - 1974) of exploration at Telfer, water require- ments were limited to supporting a 50 man camp and diamond drilling to verify thickness and grade of the strataboun

    Jan 1, 1988

  • AUSIMM
    Operating Variables Affecting the Bubble Size in Forced-Air Mechanical Flotation Machines

    By C O. Gomez

    The bubble size, together with the gas rate, determines the bubble surface area flux in flotation machines and, therefore, impacts directly on the kinetics of flotation. Understanding the variables th

    Jan 1, 2007

  • AUSIMM
    Advances in Hydraulic Mine Design in New Zealand

    By W Farnworth, D Fergusson

    Estimation of productivity is a key factor in the design of hydraulic mines and in assessing their economic feasibility. A published Russian formula for hydraulic mining monitor cutting rates overstat

    Jan 1, 2004

  • AUSIMM
    The Separation of Natroalunite from Kaolin by Selective Flocculation

    By Liu H, Chen S

    Natroalunite is one of colouring minerals in kaolin. In this investigation, natroalunite, on which Ca(II) was adsorbed, was flocculated by HPAM and kaolin was depressed in suspension. The adsorption

    Jan 1, 1993

  • AUSIMM
    Resource-Reserve History of the Estero Hondo Alluvial Gold Mine, Ecuador

    From December 1994 to November 1997 Odin MiningÆs Estero Hondo alluvial gold mine in western Ecuador washed almost 3.2 million bank cubic metres of gravel to produce just over 2600 kilograms of pure g

    Jan 1, 2003

  • AUSIMM
    Cover Design of a Backfilled Open Pit Based on a Systems Approach for a Uranium Mining Site

    By R Kahnt, S Jahn, D Baacke, M Eckart

    Relocation into the Lichtenberg open pit mine of about 110 million m3 of sulfide-bearing and ARD-generating waste rock piled up on the surface is the most important and cost-intensive single surface r

    Jan 1, 2003

  • AUSIMM
    Moving beyond Net Present Value project evaluation to achieve Environmental, Social and Governance goals for mine operations and closure

    By H Simpson, C Gimber

    The financial evaluation of mining projects drives a whole range of decision-making regarding project viability, project design, operating models and closure philosophy. Net Present Value is a financi

    Aug 2, 2023

  • AUSIMM
    Dewatering Marra Mamba – Lessons Learned

    By K Sommerville

    BHP Billiton’s Area C iron ore operation has been in production since 2003. During 2010, below water table mining in the Marra Mamba formation commenced and dewatered ore has been successfully process

    Jul 11, 2011

  • AUSIMM
    On the sources of complexity in contemporary and future mining projects

    By J Sykes, W Treasure, A Saleem, A Trench, S Ulrich, R S. Davies

    Below-ground technical complexity remains a traditional source of project challenge. Above-ground challenges then augment this complexity, including in the domain of commodity marketing. All challenge

    Nov 21, 2018

  • AUSIMM
    Development Options for the Eyre Peninsula Magnetite – An Owner’s Perspective

    By J White

    The Eyre Peninsula (EP) has been known for its iron ore for more than a century. Edward John Eyre noted the ironstone outcrop at what is now Iron Knob in the 19th century. Sir Douglas Mawson visited a

    Jul 11, 2011

  • AUSIMM
    Dynamic concepts for mine to mill operation and optimisation

    By R Pax

    Feed ore variability, the major disturbance into a mineral processing plant receives considerable attention operationally, and at research and strategic levels to ensure that the throughput of the ore

    Nov 21, 2018

  • AUSIMM
    Visualising risk – proactive is better than reactive

    By S Withell, K Sheehan

    Whitehaven Coal (WHC) is undergoing a transformative journey, deeply committed to the principles of a High Reliability Organisation (HRO) and the establishment of a mature, interdependent culture foun

    Apr 16, 2024

  • AUSIMM
    Designing a versatile, multimodal mine IoT system for accident prevention and emergency management in mines

    By D Zielinski-Nicolson

    The emergence of affordable, portable and versatile wireless devices has enabled a new frontier in mine safety equipment. Existing solutions provide methods for tracking personnel and assets in underg

    May 5, 2022

  • AUSIMM
    Operational risk management and critical controls for interacting pit stages at Ok Tedi

    By J Isarua, R Mabiria

    The Ok Tedi copper and gold project, located in the Western Province of Papua New Guinea, commenced operations in 1983. The open cut mine has undergone several significant transformations throughout i

    May 5, 2022

  • AUSIMM
    A decision framework for comparison of coal void rehabilitation options

    By A Hocking, S Henderson

    Commonwealth of Australia (2016) defines rehabilitation as comprising “the design and construction of landforms as well as the establishment of sustainable ecosystems or alternative vegetation, depend

    Jul 25, 2018