Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Exploration and Mining Process in Relation to Aboriginal Lands in the Northern Territory

    By Niemann G

    The paper addresses certain mining provisions of the Aboriginal Land Rights (Northern Territory) Act 1976 and the development of Mining agreements negotiated pursuant to Section 43 of the Act. Di

    Jan 1, 1984

  • AUSIMM
    The Bunyip Lateritic Nickel-Cobalt Deposit, Cawse Nickel-Cobalt Operations, Kalgoorlie, Western Australia

    By S M. Denn

    The Cawse nickel-cobalt operation is situated 50 km NW of Kalgoorlie in Western Australia, at latitude30o22'30'' south and longitude 121o08'30'' east on the Kalgoorlie 1:

    Jan 1, 2000

  • AUSIMM
    Optimising Land for Beneficial Use During and After Mining

    By J Purandare, D Murdoch

    The goal of the life-of-mine plan is to ensure that while the site is left safe, stable and non-polluting, the landscape is such that optimal use can be made of the site post-mining and closure. Howev

    Jun 28, 2016

  • AUSIMM
    Education and Research for the Mineral Industry

    The success of any industry depends on the planned integration of the policies and resources of the key components of the Australian economic and political structure - government, industry managemen

    Jan 1, 1986

  • AUSIMM
    The Cementation of Metals from Dilute Aqueous Solution

    By Lawson F

    A rotating disc geometry has been used to provide a uniformly accessible surface for a kinetic study of the cementation of the metals cadmium, lead and silver from dilute aqueous solutions. This work

    Jan 1, 1970

  • AUSIMM
    Geophysical Techniques Applied to Blasting Design

    By J C. Koppe, L Vieira

    One common problem for blasting in iron ore mines with significant weathering is the occurrence of large blocks of hard rock mixed with softer material. This situation causes a problem for blasting de

    Aug 24, 2015

  • AUSIMM
    Theory of Sampling – from missing link to key enabler for process analytical technology

    By R J. Romañach

    The theory of sampling (TOS) is now followed in the development of near infrared (NIR) spectroscopic methods for the pharmaceutical industry. TOS has been the guiding light for a two-step approach for

    May 9, 2017

  • AUSIMM
    Mine closure bonds (financial assurances) – the ‘how much?’ conundrum

    By G Byrne, A Bowden

    There is often a difference in opinion about the allocation of risk in the establishment of mine closure bonds or financial assurances. From the State’s perspective, protection is needed to ensure tha

    Jul 25, 2018

  • AUSIMM
    University Perspectives on Geological Education

    Universities have had a long history in the education of geology graduates, Analysis of this history reveals a record of success, as judged on a world basis. However there have been significant chan

    Jan 1, 1986

  • AUSIMM
    Don't be Afraid to Evolve

    The AusIMM came into being to foster the spread of professional knowledge within its client industry. It has evolved along with the Australian mining industry for more than a century. If the AusIMM

    Jan 1, 1994

  • AUSIMM
    Exploration History of Savage River Iron Deposits

    By Weatherstone N

    Ironstone outcrops on the Savage River were discovered by State Government Surveyor C. P. Sprent in 1877. The limonitic outcrops were initially regarded as the surface expressions of pos- sible tin-

    Jan 1, 1988

  • AUSIMM
    In-pit backfilling as part of integrated life-of-mine waste scheduling, closure planning and AMD risk management – Martabe Mine as a case study

    By K Grohs, A Satriawan, S R. Pearce

    Martabe gold and silver mine is operated by PT Agincourt Resources (PTAR) and is situated in northern Sumatra and comprises several deposits in steep terrain, and in a tropical climate, that are requi

    Aug 2, 2023

  • AUSIMM
    A Simulation Approach for Improving the Assessment of Closure Risks

    By D Trembath

    "One of the key risks to the success of a mining operation is the accuracy of the estimates of both the economic mineral and any accompanying contaminants contained within the ore reserve. Misrepresen

    Jun 28, 2016

  • AUSIMM
    Leaching of Sulfidic Backfill at the Thalanga Copper-Lead-Zinc Mine, Queensland, Australia

    By B G. Lottermoser

    The placement of sulfidic waste below the groundwater table ensures limited interaction with the hydrosphere and suppression of sulfide oxidation. However, if sulfidic waste is placed above the ground

    Jan 1, 2003

  • AUSIMM
    Use of drone and LiDAR technology for mapping underground voids

    By D Woolmer

    Since January 2019, BHP Olympic Dam have been trialling the use of a drone based LiDAR mapping system for the purpose for surveying stope voids. This new technology utilises Simultaneous Location and

    Mar 15, 2021

  • AUSIMM
    Historical Challenges, Modern Solutions at Ballarat East

    By M Sykes

    Gold was initially discovered at Ballarat in 1851. After initial alluvial mining, underground quartz mining commenced in 1853, continuing until 1918. The historic miners were considered to be capable

    Jan 1, 2008

  • AUSIMM
    Assessment of approaches, data requirements and methodologies for estimating long-term pit lake water levels

    By H J. J Boshoff

    Pit lakes, as a final void after completing open cut mining, are in most cases unavoidable. Initial mine designs and approvals require consideration and assessment of closure objectives, legislation a

    Jul 25, 2018

  • AUSIMM
    A Comparative Study of Rock, Soil and Plant Chemistry in Relation to Nickel Mineralization in the Pioneer Area, Wester Australia

    By Smith F. A, Both R. A

    The application of biogeochemical methods in mineral exploration in the semi-arid to and environment of Western Australia was investiga- ted in an area near Norseman. The reliability of these method

    Jan 1, 1973

  • AUSIMM
    Contour banks in spoil rehabilitation – a matter of timing

    By J L. Merritt

    Contour banks and waterways are standard soil conservation measures to assist farmers reduce the impact of gully erosion on sloping cropping land by reducing the slope length to the interval between t

    Jul 25, 2018

  • AUSIMM
    Mining through Sandfill Using Spiling Bars

    By D Carroll

    Mining of the zinc, lead and silver deposit at the Broken Hill Southern Operations site has been occurring for over 100 years. As a result of this, a significant amount of high-grade ore is now taken

    Nov 5, 2014