Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Formulation and Plant Trial of a Mixed Collector Suite For Eland PlatinumBy Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula
"The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.
Jan 1, 2011
-
A Study of Investigating the Relationship between Geological Strength Index and Ground Vibration Frequency Induced by BlastingBy Ali Kahriman, D. Adiguzel, R. Ulger, U. Akkaya
The environmental problems arising from ground vibration has been faced and discussed frequently in various industries such as quarry, mining, civil works, shaft, tunneling, pipe line and dam construc
Jan 1, 2011
-
Design Of Sheet Piling For The Prague Metro Line CBy Jan Pru?ka
This paper describes the sheet pile design for the Line C extension from Ládví station to the North of Prague. The first part of the paper describes the geological conditions and structural configurat
Jan 1, 2011
-
The CESL Gold ProcessBy K. Mayhew, K. Murray
The CESL Copper Process was developed as a hydrometallurgical alternative to smelting and refining for copper sulphide concentrates. As the majority of such concentrates contain appreciable gold and s
Jan 1, 2011
-
The Mineralogy and Predictive Metallurgy of Major Types of Gold OresBy J Zhou
Based on the mineralogical characteristics and mineral processing techniques required, gold ores can be classified into 12 types, including gold placers, quartz vein-lode ores, oxidized ores, silver-r
Jan 1, 2011
-
Pump and Cyclone Design/Optimization to Maximize Grinding Circuit Efficiency: A Systematic MethodBy Robert E. McIvor
"The design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit pe
Jan 1, 2011
-
On the Homogenization of Cobalt Modified 17-4 PH Stainless SteelBy David Van Aken, Arpana S. Murthy, Simon Lekakh, Von L. Richards
"Three heats of 17-4PH stainless steel: with zero, three percent, and seven percent cobalt addition were melted in a 45kg (1 00lb) induction furnace under argon; and cast into no-bake molds and prehea
Jan 1, 2011
-
Frame Optimization of a Hybrid Spyder RoadsterBy Maxime Tacher
BRP (Bombardier Recreational Products) designs and commercializes recreational vehicles such as watercrafts, sport boats, snowmobiles, ATVs... The Spyder roadster is the last product in the Can-Am pro
Jan 1, 2011
-
Contribution to sustainable development through alternative dumping concepts for coal mine waste dumps in Vietnam"Quang Ninh province is located in the north east of Vietnam and the coal mining in the province generates two thirds of the province’s GDP. The coal is extracted from both open pit and underground mi
Jan 1, 2011
-
Millerite and Its Impact on Cu/Ni SeparationBy F. D. Ford, Z. Dai
"Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6
Jan 1, 2011
-
Improved Hydrogen Cyanide Detection with Laser-Based Line-of-Sight Gas DetectorsBy Klaus Tietz, Hamish Adam, John Selby, Ian Glazier, Brian Sinfield
"Room-temperature tunable diode laser (TDL) analyzers are gaining in acceptance for highly critical safety monitoring applications in a variety of industries. This paper describes the testing, evaluat
Jan 1, 2011
-
The Use Of Geosynthetic Clay Liners In Heap Leach Pads - IntroductionBy C. Athanassopoulos
Geomembranes have been used in the mining industry since the early 1970s in solution and evaporation ponds, tailings impoundments, and heap leach pads. Traditionally, heap leach pad lining systems ha
Jan 1, 2011
-
Electrospark Deposition as a Technique to Repair Damaged McrA1Y CoatingsBy R. Farhat
Coating systems that yield a thermally grown oxide (TGO) protective layer have been proposed as a potential method for extending the lifecycle of components exposed to high temperature corrosion. This
Jan 1, 2011
-
Hydrocyclone Classification Modeling for Gold Ore Grinding Circuit SimulationBy M. R. Khalesi, S. Bellec, C. Bazin, D. Hodouin
This paper proposes a classification model to predict the split coefficient of gold ore particles as a function of the particle size and gold content. The model is calibrated and validated using data
Jan 1, 2011
-
Offsetting Effluent Treatment Costs by Metal Recovery from Effluent StreamsBy Derrin A. Auerswald, Jacolien P. Wyethe, Nanne M. \/egter
Base and precious metal refineries often produce effluent solution and slurry streams containing between 50 mg/L and several grams per liter of base metals. Metals have historically been precipitated
Jan 1, 2011
-
A Computer Simulation of an Agitation Mill Abrasion Process for Waste Printed Circuit BoardsBy K. Torigoe, S. Owad, C. Tokoro, Y Tsunazawa
The mechanism of an abrasion process to recover metal values by removing components from printed circuit boards (PCBs) is modeled using a discrete element method (DEM) simulation. To simulate the abra
Jan 1, 2011
-
Stability and Thermoelectric Properties of Transition Metal Silicides from First Principles CalculationsBy J. -C. Tedenac, C. Colinet, X. Tao, P. Jund, R. Viennois
"We report an ab-initio study of the stability and electronic properties of transition metal silicides in order to study their potential for high temperature thermoelectric applications. We focus on t
Jan 1, 2011
-
Changing Minds??A White Flag? ? SynopsisBy J. L. Viljoen
t has long been the drive of the industry and all operations to create an environment that is free of injury and illness. We have come a long way; the leaders, executives, managers, supervisors and wo
Jan 1, 2011
-
No. 5 Seam Mining At Kriel Colliery Opencast - SynopsisBy M. D. Raganya
The Kriel Colliery is an Anglo Coal mine which is contracted with Eskom to produce No. 4 seam for Kriel power station. The mine previously found it uneconomical to mine No. 5 seam due to the low quali
Jan 1, 2011
-
Higher Classification Efficiency by Hydrocyclone ControlBy M. A. Hararah, T. Neesse, M. G. Farghaly, G. Proellss, P. Kaniut, W. Rubarth
ABSTRACT: This paper presents two new options for hydrocyclone control. Volume split control using a control valve in the overflow is applied for the stabilization of separation results at changing fe
Jan 1, 2011