Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Production Capacity Optimisation in the Presence of Grade UncertaintyGrade uncertainty can have a number of important implications for a mining operation. One of the most significant risks in not considering grade uncertainty in planning is the over or under allocation
Dec 6, 2010
-
Computer Simulation of Roadway Development to Support Longwall MiningPrefeasibility planning and cost estimation of conveyor systems has historically been undertaken by comparing fixed plant transport requirements to that of similar systems in service. This paper descr
Dec 6, 2010
-
Simulation and Animation Model for the Millerton Coal Mine (New Zealand)A simulation and animation model was constructed for the Stockton Coal Mine. This mine is located in the north western area of the South Island of New Zealand. This model was used to study the optimum
Dec 6, 2010
-
Improvement of Mechanical Tool Performance by Waterjet AssistanceThe problems arising in the excavation of hard rocks with the use of mechanical tools consist chiefly in a slow advance rate accompanied by an intensive wear due to the toughness and abrasiveness of t
Dec 6, 2010
-
Optimisation Improvements in Whittle using Stope Optimisation SoftwareMining One (M1) is often challenged with the task of evaluating deposits considering open cut and/or underground (UG) mining methods. In many near surface deposits a combination of both methods result
Dec 6, 2010
-
Simulation for Dependable Mining AutomationA discussion on simulation tools to aid the development of robotics platforms is presented. The focus of the work is towards mining robotics platforms where operations are typically in unstructured, u
Dec 6, 2010
-
Numerical Modelling of Monorail Support Requirements in Decline DevelopmentThis paper discusses support requirements for the proposed monorail system to be used in decline development. The monorail drilling and loading systems are systems that move on the rail (monorail) ins
Dec 6, 2010
-
BATMIN - Business Analysis Tools for MiningBATMINÖ, BATMINEÖ, BATMINDÖ are an abbreviation for Business Analysis Tools for Mining, Mine Evaluation and Mine Design respectively. BATMINP are proprietary tools customised to suit individual clien
Dec 6, 2010
-
Prediction of Near-Field Rock Damage Due to Production Blasting in Limestone Quarries, JapanThis paper presents the near-field rock damage owing to production blasting in limestone quarry in the western region of Japan. The study's purpose is to learn the mechanism of crack development
Dec 6, 2010
-
Never Touch a Running System - Longwall Cutting Sequences and their PotentialThe optimisation and validation of shearer cutting methods is a time consuming engineering task. Many different parameters, of which not all can be controlled, can vary. The easiest solution, to incre
Dec 6, 2010
-
Enterprise OptimisationEnterprise Optimisation is a methodology for increasing the value of mining and mineral processing operations through better long-term planning decisions. It involves a combination of ten mechanisms w
Dec 6, 2010
-
Optimum Equipment Management Through Life Cycle CostingLarge mining operations need equipment that consistently performs as expected. The most effective way of ensuring this is to have a defined life cycle with an optimised maintenance strategy. The deter
Dec 6, 2010
-
The Next Challenge in Optimising Mining OperationsThis paper describes the past, normal and advanced practice of optimisation in mining. It then discusses what needs to happen for the mining industry to make full use of what is now available.
Dec 6, 2010
-
A Simulation Approach for the Comparison of In-Pit Crushing and Conveying and Truck-Shovel Mining MethodsIn-pit crushing and conveying (IPCC) is being increasingly considered as an alternative to traditional truck-shovel mining methods. The move towards IPCC is driven by a number of factors including the
Dec 6, 2010
-
Assessment of Occupational Exposure to Whole-Body Vibration for Drivers of Mining EquipmentAccording to the data provided by the most recent European Survey on Working Conditions, roughly 25 per cent of the European working population is exposed to mechanical vibrations for no less than one
Dec 6, 2010
-
Robust versus Flexible Open Pit Mine DesignStrategic planning in mining is an important value accretive process. One of the most important aspects during the planning phase is determining the correct mine and plant design. The traditional mine
Dec 6, 2010
-
Coal Bed Boundary Detection using Infrared Technology for Longwall Shearer AutomationAutomation in underground mining enhances safety and leads to economic efficiency. In the past many efforts have been made on the automation of longwall shearer operation. With respect to the ultimate
Dec 6, 2010
-
Ultimate Pit Limit of Iron Ore Mines using Maximum Flow AlgorithmsA major problem in open pit mine planning is to determine the optimum pit limit of the mine. The optimum pit limit is the one with maximum discounted net profit and satisfies technical conditions. A n
Dec 6, 2010
-
Operative Expert Estimation of Innovative Policy of Mining Enterprise Technological Development using Sustainable Development PrinciplesIn this paper the system of an operative expert estimation of innovative policy of mining enterprise technological development on sustainable development principles, created in the laboratory of econo
Dec 6, 2010
-
Using Haulage Accidents and Incident Reports to Identify the Impact of Substandard Haul Road Design on Operational SafetyWell designed and maintained haul roads are the key to minimising truck haulage on-road hazards and costs, as well as increasing productivity. However, practically designing and managing a haul road f
Dec 6, 2010