Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Marine Recovery of Tunnel Boring Machine from Botany BayBy S Norman
The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (
Mar 8, 2011
-
Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in BrisbaneBy A Purwodihardjo
Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t
Mar 8, 2011
-
Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra DeltaBy P Clark
This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project
Mar 8, 2011
-
Elastomeric Segment Gaskets – State-of-the-Art and Future DevelopmentsBy H Höft
Today tunnel segment liners are sealed with corner-vulcanised gaskets made of extruded elastomeric compression profiles. The profile geometries and the elastomeric materials have been further develope
Mar 8, 2011
-
Innovative Victoria Park Tunnel design is Communicated Effectively to Stakeholders with the Aid of Three-Dimensional Visualisation MediBy M Sparrow
The Victoria Park Tunnel project is an inner-city alliance project in central Auckland, New Zealand. The existing two-directional viaduct will be modified to single-direction flow, and a new northboun
Mar 8, 2011
-
New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build PhaseBy D FitzGerald
A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the
Mar 8, 2011
-
Investigation of Shield Face Stability by Transparent Soil ModelsBy M Ahmed
Reliable face support pressure is necessary for shield driven tunnels in cohesionless soils to prevent excessive ground movements. This paper presents experimental work on stability of a tunnel face u
Mar 8, 2011
-
Performance and Durability Improvements of Precast Concrete Lining Segments with Fibre ReinforcementBy R Winterberg
Concrete is a well established and reliable construction material for the permanent lining of tunnels, but shows some weak performance characteristics, which can be overcome by the addition of special
Mar 8, 2011
-
Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their EffectsBy J P. Burr
The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co
Mar 8, 2011
-
Rock Bolts for Permanent Tunnel LiningBy J de Witte
When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i
Mar 8, 2011
-
Segmental Tunnel Lining Breakouts and Cross Connection Tunnels – Adelaide Desalination Plant, AustraliaBy L Drowley
The Adelaide Desalination Plant (ADP) draws raw sea water into the facility and returns saline concentrate to the Gulf St Vincent via subsea conduits. This paper describes the detailed design and cons
Mar 8, 2011
-
The Need for Specification Development in Australian Road TunnelsBy T Brown
Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty
Mar 8, 2011
-
Waterproof Detailing in Drained and Undrained TunnelsBy J Palise
As cities become more populated and the need for tunnelling increases, we continue to dig deeper urban tunnels in more challenging ground conditions. At the same time our expectations for durability a
Mar 8, 2011
-
Strength and Stiffness Parameters for Tunnels in Weak Sedimentary Rocks – A Case Study of the East Coast Bays Formation in Auckland, New ZealandBy W Newns
This paper describes laboratory and in situ tests and determines a set of parameters for stiffness and strength properties for a weak sedimentary rock mass, the East Coast Bays Formation of Auckland.
Mar 8, 2011
-
Tunnelling in the Andes in Chile – By Drill and Blast and Tunnel Boring MachineBy R Fletcher
Pacific Hydro, a leading renewable energy company from Australia, is developing a series of cascading run-of-river hydro electricity projects in the Cachapoal Valley at the base of the Andes Mountains
Mar 8, 2011
-
The Application of AS 61508 to Road Tunnel Fire and Life Safety SystemsBy M Taylor
The Project Specification and Technical Requirements documents associated with several recent large road tunnel projects within Australia have specified the application of AS/IEC 61508 – FunctionalSaf
Mar 8, 2011
-
Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons LearntBy M Weeks
Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen
Mar 8, 2011
-
The Development of a Fan Range to Meet Increasingly Demanding Safety Criteria Inside TunnelsBy A G. Sheard
Fire safety requirements inside tunnels have become more demanding as tunnel designers consider the impact of potentially larger fires. Tunnel ventilation equipment is required to clear hot gases in t
Mar 8, 2011
-
Project Hobson – New Technology in AucklandBy T Ireland
The Project Hobson tunnel excavation was the first use in New Zealand of an earth pressure balance (EPB) tunnel boring machine (TBM). The tunnelling on the project was very successful and break-throug
Mar 8, 2011
-
Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement ProjectBy M Behrens
The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th
Mar 8, 2011