Search Documents

Sort by

  • SME
    Part 3: Preparation Plant Safety

    By Leo Misagi

    THE ROLE OF MANAGEMENT IN PLANT SAFETY Safe Production In plant management, safe production is an ideal. It becomes reality when: 1. Plant employees work in healthful and safe conditions. 2. P

    Jan 1, 1991

  • SME
    Part 4 - Difficult Ground - RETC2021

    By Everett Litton, Ehsan Alavi

    N/A

    Jun 13, 2021

  • NIOSH
    Part 46 - New Training Requirements for Surface Nonmetal Mines

    By J. Davitt McAteer

    Dear Mine Operator, Training for new employees, refresher training for new employees, refresher training, and new task training can mean the difference between life and death for workers. Part

    Jan 1, 1999

  • SME
    Part 4: Oil Agglomeration Process Principles and Commercial Application for Fine Coal Cleaning

    By C. E. Capes

    INTRODUCTION In the coal industry, ever greater amounts of fine coal must be processed due to the need to crush to finer sizes for impurity liberation in low cost physical cleaning processes. Fine co

    Jan 1, 1991

  • SME
    Part 5 - Future Projects - RETC2021

    By TONY CICINELLI

    INTRO PAGE

    Jun 13, 2021

  • SME
    Part 5: Preparation Plant Flowsheets

    By Richard B. Muter

    In determining the layout or combination of unit operations to be utilized in a modem preparation plant, several factors must be taken into account. Among these are the washability data, size consist

    Jan 1, 1991

  • SME
    Part 6 - Geotechnical Considerations - RETC2021

    By Chris Lynagh, Lisa Smiley

    INTRO PAGE

    Jun 13, 2021

  • SME
    Part 6: Flow Diagram Unit Water Balances

    By Joseph W. III Leonard

    Most material balances on coal preparation plant flow diagrams are stated in tons per hour of solids and gallons or liters per minute of water. Balances expressed in these terms can be simplified when

    Jan 1, 1991

  • SME
    Part 7 - Ground Control Approaches And Methods - RETC2021

    By Stephen Njoloma, Amitabha Mukherjee

    INTRO PAGE

    Jun 13, 2021

  • SME
    Part 7: Noise Investigation and Reduction

    By David G. Chedgy

    Noise control is an important consideration in the design and operation of coal preparation plants. It is essential to understand and control noise sources to provide a safe environment for operating

    Jan 1, 1991

  • SME
    Part 8 - Ground Support And Final Lining

    By Will Hodder, Martin Mancini

    INTRO PAGE

    Jun 13, 2021

  • SME
    Part 8: Iso-Definition

    By Richard B. Muter

    1. Coal Preparation Terms (General) 1.1 Coal preparation-collectively, physical and mechanical processes applied to coal to make it suitable for a particular use. 1.2 Run of mine (ROM coal)-coal p

    Jan 1, 1991

  • SME
    PART 9 - HARD ROCK TBM's AND TUNNELS

    By Jesse Salai, Colin Sessions

    INTRO PAGE

    Jun 13, 2021

  • ISEE
    Part A: Structural Response from Surface Coal Mine Blasting on a Residential Structure; Part B: House Response from Blast-Induced Low Frequency Ground Vibrations and Inspections for Related Interior Cracking

    By John H. Weigand, Stephen V. Crum

    "VIBRONICS, INC. instrumented and monitored a residential structure for response to,blasting at aMidwestern surface coal operation. The residence was owned by the mining company and was extremely clos

    Jan 1, 1998

  • NIOSH
    Part Eight - Earth Model - I. Introduction

    The question of earth models has repeatedly arisen in our work. An accurate representation of the seismic properties is required for three reasons: 1.To be able to determine from a set of received

    Jan 1, 1974

  • NIOSH
    Part Eight - Technology Transfer Seminars On Mine Communications And Through-The-Earth Electromagnetics Workshop - A. Introduction

    During the first quarter of 1973 ADL worked closely with PMSRC staff, under an extremely compressed time schedule, on all aspects of the detailed planning, organization and overall coordination and pr

    Jan 1, 1974

  • NIOSH
    Part Eleven - Seismic Detection/Location Instrumentation – I. Introduction

    The instrumentation specification in the National Academy of Engineering (NAE) report of March, 1970, set forth some rather general guidelines that the seismic surface system should follow. The fact t

    Jan 1, 1974

  • NIOSH
    Part Five - Hoist Shaft Mine Communications - Introduction

    During the summer of 1973 we were asked to perform a theoretical investigation of the propagation of low frequency (LF) radio waves down deep (10,000 feet) hoistshafts* for the case where the hoist ca

    Jan 1, 1974

  • NIOSH
    Part Five - The Reference Event Method Of Seismic Location For Mine Rescue Systems – I. Summary

    By Wm. C. Dean

    The location of trapped miners from their seismic signals will be in- accurate if we assume the P-wave propagation velocity is a constant. P- wave velocities are anything but constant in regions about

    Jan 1, 1974

  • NIOSH
    Part Four - Estimates Of Miner Location Accuracy: Westinghouse Location Program “Miner” - I. Introduction

    Crosson and Peters treat the errors that result in miner location due to errors in the overburden earth model used for computing location. A parallel effort by J. Powell of PMSRC is discussed here, wh

    Jan 1, 1974