Search Documents

Sort by

  • AUSIMM
    No. 3 Changehouse

    With the sinking of the No. 3 Shaft at North Broken Hill Limited, it was necessary to construct adjacent to the shaft a new changehouse for mining and surface personnel.It was also probable that as th

    Jan 1, 1957

  • AUSIMM
    No. 3 Headframe

    To finalise the arrangement and details of the headframe to be erected over the new No. 3 Shaft, the haulage and winding equipment requirements were first determined, then tentative designs were prepa

    Jan 1, 1957

  • AUSIMM
    No. 3 Shaft Sub-Brace Area

    With the sinking of the No. 3 Shaft and the erection of a changehouse nearby, a sub-brace level structure was provided incorporating a time office, underground foremenÆs office and lamp room, in conju

    Jan 1, 1957

  • AUSIMM
    No. 3 Shaft Winders and Winder House

    The sinking of the new No. 3 Shaft being mainly concerned with providing for the continuation of mining operations north of the existing workings, requirements for the shaft and haulage equipment were

    Jan 1, 1957

  • TMS
    No. 3 Tankhouse at Onahama Smelter and Refinery

    By H. Ikeda

    The new Onahama N0.3 tankhouse was put into operation early in 1973. This new tankhouse, which has a capacity of 90,000 metric ton cathode per year, is distinct in many important respects from convent

    Jan 1, 1976

  • AUSIMM
    No. 3 Ventilation Shaft: Shaft-Sinking Equipment

    With the sinking of the new No. 3 Shaft and the increasing depth and northward movement of the mining operations, improved ventilation of the mine workings became necessary and it was decided to sink

    Jan 1, 1957

  • AIME
    No. 4 I.S.F. Smelter Complex Of Imperial Smelting Corp., Ltd., Avonmouth, England

    By R. M. Sellwood

    The No. 4 I.S.F. Smelter Complex at the Avonmouth Works of Imperial Smelting Corporation (N.S.C.) Limited commenced operation at the beginning of 1968. The furnace rating is 120,000 tons zinc and 40,0

    Jan 1, 1970

  • SAIMM
    No. 5 Seam Mining At Kriel Colliery Opencast - Synopsis

    By M. D. Raganya

    The Kriel Colliery is an Anglo Coal mine which is contracted with Eskom to produce No. 4 seam for Kriel power station. The mine previously found it uneconomical to mine No. 5 seam due to the low quali

    Jan 1, 2011

  • CIM
    No. 6 Concentrator Operations at. Brunswick Mining and Smelting Corporation Limited

    By R. T. Erskine

    "The No. 6 orebody is located 6 miles from the main op.eration of Brunswick Mining and Smelting Corporation Limited and includes open-pit and primary gyratory crushing facilities. Ore is transferred b

    Jan 1, 1971

  • SME
    No. 7 Subway Extension Crossing Under An Existing Subway Station: Challenges And Integration Of Underpinning Into The Design Of New Tunnels

    By Aram Grigoryan

    This paper addresses the challenges of designing the underpinning of major sub-way station with 4 operating tracks. No. 7 subway extension crosses under the existing 42nd street subway station on the

  • SME
    No. 7 subway line project advances with Atlas Copco rigs and tools

    By Scott Ellenbecker

    Soon New York City will have a new train station. A tunnel project is under construction to extend Line 7 to a new station that is located near the Jacob K. Javits Con-vention Center. This is also par

    Jan 3, 2010

  • CIM
    No. 8 Shaft, Britannia Mines

    By Paul W. Billwiller

    Introduction In 1937, the Britannia Mining and Smelting Company, Limited, was carrying on an extensive exploratory diamond-drilling programme. Most of this drilling was done on the 4100 level, the

    Jan 1, 1946

  • SME
    No.3 Mine Fire -A Case Study

    By C. C. Stewart

    Jim Walter Resources, Inc. operates four underground coal mines in Alabama. In 1986, during longwall recovery operations, sparks from a torch ignited methane that migrated onto the face after a roof f

    Jan 1, 1993

  • AUSIMM
    NO2:NOx Ratios in Australian Road Tunnels

    By P Gehrke, S O’Gorman

    The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire

    Sep 17, 2014

  • AIME
    Noamundi: India's New Iron Ore Complex.

    By A. T. Yu

    As the first loads of Noamundi iron ore rumbled into the new 54-in. Gyratory Crusher on March 30, 1968, one of India's largest and most modern iron ore processing complexes began operations. The

    Jan 11, 1968

  • SME
    Nodal Seismic Deployments at Open-Pit Mines: A Case Study at the Bingham Canyon Mine - RASIM 2022

    By Derrick Chambers, George Kevin Chapin, M. Shawn Boltz

    Seismic monitoring is one of the few noninvasive technologies with the potential to provide sub-surface geomechanical information to operators of large open-pit mines. Although passive seismic data ha

    Apr 26, 2022

  • SME
    Node-Based Network Analysis And Its Application To Mine Ventilation

    By B. D. Nichols, R. Idzorek, W. S. Gregory

    A numerical procedure to model flow networks using a node-based approach is discussed, and the analysis encompasses both steady-state and transient solutions. A family of computer codes has been devel

    Jan 1, 1987

  • CIM
    Nodular organic matter in granites: implications for the origin of "kerogen" in the Witwatersrand Basin, South Africa

    By D. W. Davis, P. Landais, L. J. Robb

    Abstract -Nodules of carbonaceous matter have been observed in several Archaean peraluminous granites adjoining the gold- and uranium-bearing Witwatersrand Basin. These nodules, which resemble solid b

    Jan 1, 1994

  • CIM
    Nodular organic matter in granites: implications for the origin of "kerogen" in the Witwatersrand Basin, South Africa (8a3224f3-e78f-48d9-9be8-f62408e7ff43)

    By D. W. Davis, P. Landais, L. J. Robb

    Nodules of carbonaceous matter have been observed in several Archaean peraluminous granites adjoining the gold- and uranium-bearing Witwatersrand Basin. These nodules, which resemble solid bitumen, us

    Jan 1, 1994

  • IMMS
    Nodule Abundance Estimation - The Search for "Good Enough"

    By Laurie Meyer

    The need for improved, high confidence estimates of nodule abundance to support mine permitting, detailed mine planning and mining and processing equipment design is evident. To date, physical samples

    Sep 14, 2011