Search Documents

Sort by

  • CIM
    Mine Planning

    By G. Scott Zimmer

    Mine planning at Cassiar consists of an annual cycle of projection, control, evaluation and revision following completion of annual diamond drilling during the summer months . The inherent difficulty

    Jan 1, 1978

  • SAIMM
    Mine Planning (d3a3d1a4-3eb5-42a0-a100-700eebbf2b48)

    "Chairman: Professor J. Elbrond Rapporteur: Miss V. E. MartingPapers.Aids to planning production in coal mines by F. H. Deist and M. P. RobertsCapacity calculations, investment allocation and long-ran

    Jan 1, 2014

  • ISEE
    Mine Planning - Its Effect on Drilling and Blasting

    By Alan R. Gadberry

    Good mine planning is critical to the success of a safe, cost effective mine. Many factors contribute to the overall success of an open pit mining operation: proper pit location and development, good

    Jan 1, 1981

  • AUSIMM
    Mine Planning - Rate: A Key Criteria

    The mining industry has a well deserved reputation earned over the years for innovation, engineering, management and the quick application to mining of emerging technology. The cumulative result i

    Jan 1, 1989

  • CIM
    Mine planning and design integration

    By Earl Gebhardt

    The planning and design of mining panels in the Potash Corporation of Saskatchewan Inc., Lanigan Division mine Block B involved a number of investigative techniques. The techniques utilized to gain in

    Feb 1, 1993

  • CIM
    Mine planning and design integration (8b994481-1a73-40ce-ac2d-755d2a73f2cd)

    By Earl Gebhardt

    "The planning and design of mining panels in the Potash Corporation of Saskatchewan Inc., Lanigan Division mine Block B involved a number of investigative techniques. The techniques utilized to gain i

    Jan 1, 1993

  • SME
    Mine Planning And Emission Control Strategies Using Geostatistics ? Introduction

    By Francis Martino

    There are numerous techniques and predictive models used by geologists and mining engineers to define coal reserves and plan mines. The traditional reserve estimation methods commonly used include the

    Jan 1, 1983

  • SME
    Mine Planning And Evaluation With A Dedicated Computer Graphics System - Introduction

    By Edward L. Mooney

    The past 15 years has .seen a dramatic increase in the use of computers in the mining industry. Sanford (1) has provided a comprehensive listing of available programs by application within the mining

    Jan 1, 1979

  • AUSIMM
    Mine Planning and Geotechnical Considerations in the Development of the Western Baters of Yallourn Open Cut Mine

    By Tilley H. L

    The 90 m deep Yallourn Open Cut brown coal mine in the Latrobe Valley, Victoria is developing into an area close to a reverse fault. A major batter stabilisation program, matched to ongoing operatio

    Jan 1, 1989

  • AUSIMM
    Mine Planning and Grade Control - Goldsworthy

    By Newman H. A

    Goldsworthy Mining Limited is currently mining iron ore at an annual rate of 7 million tons from several small orebodies, each of which exhibit wide variations in iron, phosphorus, silica and alumi

    Jan 1, 1973

  • IIMP
    Mine planning and ore control data integration

    By Pabel Alvarado

    Mineral deposits with large data uses different block dimensions in Long term planning (LTP), short term planning (STP), and ore control (OC). Using applications can Re-block, Krige, Compute variable,

    Sep 1, 2017

  • AUSIMM
    Mine Planning and Risk Management Associated with the Breakthrough of the Telfer Sublevel Cave into the Active Telfer Open Pit

    The Telfer main dome open pit is operated by Newcrest Mining Limited at a current production rate of 50 Mt/a from a pit dimension compromising 2 km strike length, 1 km width and 250 m depth. As part o

    May 1, 2010

  • AUSIMM
    Mine Planning and Scheduling at Ranger Uranium Mine-Environmental Requirements and Economics

    Ranger Uranium Mines (RUM) operates an open cut located in the Top End of the North- ern Territory. Strict environmental controls govern all operations and the water management requirements have th

    Jan 1, 1984

  • AUSIMM
    Mine Planning at Murrin-Murrin ù Modelling to Determine the Optimum Path

    The process of mine planning at AnacondaÆs nickel and cobalt laterite operation located at Murrin-Murrin in the Northern Goldfields of Western Australia is carried out in a number of stages in an ende

    Jan 1, 2003

  • SME
    Mine Planning At Newmont Gold

    By S. P. Winkelmann

    The expansion in gold production in the Carlin 'Trend over the last few years has been one of staggering proportion. To increase gold production while minimizing capital requirements and providin

    Jan 1, 1990

  • SME
    Mine Planning at Newmont’s Nevada Operations

    By Steven Hoerger

    Newmont Mining has a large, integrated gold-mining operation in northern Nevada with several mines, stockpiles and processing facilities. There are more than 90 defined metallurgical ore types and mo

    Jan 1, 1999

  • SME
    Mine Planning At Round Mountain Gold Corporation

    By Stephen J. Brower

    Located in Central Nevada, The Round Mountain Gold deposit has been continuously mined since 1977. Present proven and probable reserves are 226 Mt (250 million short tons) at 1.1 g/t (.032 oz per shor

    Jan 1, 1989

  • AUSIMM
    Mine Planning at the Mae Moh Lignite Mine Thailand

    The Electricity Generating Authority of Thailand own and operate an opencut mine supplying coal to on-site power stations at Mae Moh, 600 km North of Bangkok. The mine is being expanded from an an

    Jan 1, 1986

  • SME
    Mine Planning At The McKinley Mine

    By M. G. Premo

    The McKinley Mine is located in the northwest New Mexico, in McKinley County, approximately 25 miles from Gallup. The mine is operated by The Pittsburg & Midway Coal Mining Co. (P&M), a wholly owned s

    Jan 1, 1992

  • AUSIMM
    Mine Planning by Quarters

    By B Ascott, J Kennedy, A White

    At mines with low tonnes per vertical metre, like the Jundee Mine in Western Australia, operated by Newmont Asia Pacific, high development rates across multiple mining areas are critical to achieving

    Jan 1, 2008