Search Documents

Sort by

  • SME
    Maximum Charge Weight Equation for Underground Blast Overpressures

    By B. Petri, N. Rouse

    "Air overpressure monitoring procedures and instrumentation guidelines which apply to production blasting in underground limestone mining are not readily available. The industry also lacks an applicab

    Jan 1, 2015

  • SME
    Maximum estimation error correlation between short and long-term production volumes

    By V. C. Koppe, J. F. C. L. Costa, D. M. Marques, A. Amaral

    Errors associated with estimating the grade of an attribute of interest in a deposit can compromise planning, sequencing, and mineral beneficiation decisions. Several factors are associated with estim

    Jun 25, 2023

  • SAIMM
    Maximum height estimation for mine waste dumps

    By S. Chai

    Waste dumps are widely used to discharge stripped mine wastes in open pit mining methods. As mining progresses, the height of the waste dumps will increase gradually, which may induce sliding failure

    Oct 1, 2022

  • AUSIMM
    Maximum Panel Width Determination for Sub-level Caving with Bottom Ore Drawing

    By Adranyl W. W

    Sub-level caving with bottom ore drawing has gained wide acceptance in rich, soft, low magnetic iron ores because it provides moderate ore dilution and ore losses. The main problem here is the high

    Jan 1, 1995

  • CIM
    Maximum Total Recovery Through Mining High-Grade and Low-Grade Ore Together is Economically Sound

    By Donald Carlisle

    "IntroductionTHE OPINION is held by many persons outside the mining industry, and by some within it, that mine •operators customarily find it advantageous to mine •only the richer parts of orebodies a

    Jan 1, 1953

  • SME
    Maximum Utilization Of ANFO Energy By Proper Initiation

    By Paul H. Rylund

    Substantial priming was a considered necessity for proper initiation of ammonium nitrate-fuel oil mixes as ANFO began to carve its niche in the mining industry in the latter fifties. Heavy priming acc

    Jan 1, 1972

  • AIME
    May 26, 1930; 2 P.M ; R. F. McElvenny Presiding

    R. F. MCELVENNY.- Over 20 years ago I went back East on a little tour of copper companies to see how copper was handled and fabricated, and I met a Mr. Bassett who took me through the Waterbury branch

    Jan 1, 1930

  • AIME
    May 27, 1930; 2 P.M.; R. F. McElvenny Presiding

    R. F. McELVENNY.- The next item is: "Center and other methods, vs. side charging." That was all discussed in the Carson case, and I do not know but what many of the plants are still using center charg

    Jan 1, 1930

  • AIME
    May 27, 1930; 9:15 A.M.; R. F. McElvenny Presiding

    R. F. McELVENNY.- Mr. Oldright has just given me a letter to read to you, which I think it may be of interest. It is headed, "Silver Meeting Dinner". The letter is as follows: "To Members of the A.

    Jan 1, 1930

  • AIME
    May the American Petroleum Industry Through Voluntary Action Meet Its Problem of Over-production

    By JAMES A. VEASEY

    SINCE the World War, excepting for a few brief periods of relief, the American petroleum industry has been obliged to meet its important economic responsibility to this nation hampered by the maladjus

    Jan 1, 1929

  • CIM
    Mayo District, Yukon

    By H. S. Bostock

    "The study of the geology of Mayo district began in 1900 with R. G. McConnell's exploration of Stewart river; and has been carried on intermittently for the Geological Survey of Canada by J. Keele; D.

    Jan 1, 1954

  • SME
    Maysville: Total Transportation

    By Keith P. Bingham

    A total transportation system providing for delivery of finished products to customers and raw materials to the plant is one of the key elements contributing to Dravo Lime Co.'s success. Dravo

    Jan 10, 1982

  • IIMP
    Mayta Cápac y la estadística minera aurífera

    By Jorge Olivari Ortega

    "Los incas desarrollaron un censo que les permitía planificar el desarrollo socio-económico de la región, como la actividad minera aurífera. En ese sentido, el gobierno del inca Mayta Cápac elaboró u

    May 1, 2016

  • SME
    MBTA Red Line Extension Northwest: The Influence Of Geology On Alignment And Grade

    By Harry Sutcliffe, Francis M. Keville

    The paper describes the, impact of the geotechnical exploration program on the line and grade of the tunnels and the shaft configuration on the Red Line Extension N.W. in Cambridge and Somerville, Mas

    Jan 1, 1983

  • SME
    MBTA Silver Line Phase III?Completes Boston?s Newest Transit Line

    By Gregory Yates

    INTRODUCTION Project Description The Silver Line is a Bus Rapid Transit (BRT) Line and is Boston?s newest transit service. Silver Line Phase I extends along Washington Street entirely on the surface

  • SME
    McAlpine Mill and Haileybury School of Mines: A Co-op That Works

    By Kevin Beirne

    Most people involved in the mining industry are familiar with student-industry co-op work-study programs. Many colleges and universities have used them for years. Northern College’s Haileybury Schoo

    Jan 1, 1999

  • AUSIMM
    McArthur River Mine Heavy Medium Plant – The Benefits of Applying Modern Coal Plant Design Principles to Base Metal Heavy Medium Separation

    By K Cameron, S Strohmayr, J Wallace

    In 2012, a single module heavy medium cyclone plant (HMP) was installed at the Glencore Zinc’s (then Xstrata Zinc) McArthur River lead zinc mine. The HMP formed the first part of the MRM Phase 3 Proje

    Sep 7, 2015

  • AUSIMM
    McArthur River Project

    Thank you chairman, good afternoon ladies and gentlemen. In my talk this afternoon I intend to cover a brief history, some of the recent experiences and an overview of the McArthur River project.If we

    Jan 1, 1993

  • CIM
    McArthur River Project - the future of Key Lake

    By J. Spross

    "The Key Lake mill has operated since the fall of 1983. The ore from both Key Lake open pits will be depleted by 1997. It is planned to use this mill, located about 60 km southwest of McArthur, to pro

    Jan 1, 1994

  • CIM
    Mcclean Lake Mill 55 Kt Debottlenecking Study

    By T. S. Grewal, S. C. Gupta, H. Natarajan, T. W. McQuade, N. Nejibulloev-Mamedov

    Cigar Lake is one of the world’s largest high-grade uranium mines. The ore mined at Cigar Lake is milled at Orano Canada Inc’s (Orano) McClean Lake mill. The average Cigar Lake ore uranium grade since

    Jan 1, 2020