Search Documents

Sort by

  • SME
    Managing The Air Quality Impacts Of A Global Diversified Mining Company

    By F. Turatti

    Rio Tinto is one of the world's largest mining companies, involved in every stage of metal and mineral production, producing aluminium, copper, diamonds, coal, iron ore, uranium, gold and industr

    Feb 27, 2013

  • AUSIMM
    Managing the Closure and Reopening of the South Ramp at Telfer Gold Mine During Sublevel Cave Breakthrough into the Open Pit

    The Newcrest Mining Limited Telfer Gold Mine consists of an underground sublevel cave (SLC) operation located 734 m directly below active open pit operations. Open pit and underground current producti

    Nov 25, 2010

  • AUSIMM
    Managing the Cumulative Groundwater Impacts of Multiple Iron Ore Projects at Cape Preston (or à One Plus One Plus One Plus One Does Not Equal Four)

    By J Hall, A Gallardo, M Strizek

    Mineralogy and coproponents Sino Iron, International Minerals and Austeel are in the process of developing four world class magnetite iron ore mines with multiple open pits along a 25 km strike length

    Jan 1, 2009

  • SME
    Managing The Development Of Innovative Practices

    By B. W. Cavender

    Innovative mining and metallurgical operating techniques and processes can be identified and developed by analyzing changes as they occurs within the mine, plant, technology or industry. Sources of ch

    Jan 1, 1996

  • SME
    Managing The Development Of Innovative Practices (12df6746-d877-4a4e-95ef-c16fc48d763e)

    By B. W. Cavender

    Innovative mining and metallurgical operating techniques or processes can be identified and developed by systematically analyzing change as it occurs within the mine, plant, technology, or industry. S

    Jan 1, 1994

  • SME
    Managing the development of secondary drawpoints in high stress areas at Goldex Mine RaSiM10 (Rockburst): 2022 Proceedings

    By Véronique Falmagne, Chantale Doucet, Thomas Côté

    Production began in the Deep 1 zone of Goldex mine in 2017 at a depth of 1,200 m. Stope dimensions are 50 m high by 22 m wide (along strike) and the panel thickness varies between 22 to 35 m. The Deep

    Apr 26, 2022

  • AUSIMM
    Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground Mine

    By L Sandery, S Light

    Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w

    Mar 24, 2014

  • SME
    Managing The Drill And Blast Process

    By L. W. Berry

    Drill and blast planning is critical to successful mine production, both in timing and in results. However, typical planning, reporting, and information exchange usually involves large quantities of d

    Jan 1, 2011

  • AUSIMM
    Managing the flotation response of pyrrhotite from Cu-Ni-PGM ores using process water of a degrading quality

    By M S. Manono, K C. Corin

    The optimisation and process developments surrounding the beneficiation of Cu-Ni-PGM ores is of fundamental importance when considering the continued rise in global demand for these precious metals. T

    Aug 24, 2022

  • SAIMM
    Managing The Geotechnical And Mining Issues Surrounding The Extraction Of Small Pillars At Shallow Depths At Xstrata Coal South Africa ? Synopsis

    By S. Z. Pethö

    Pillar extraction at shallow depths with small pillars that were not originally intended for secondary extraction can provide a huge benefit to the coal mining industry in those areas where a signific

    Jan 1, 2012

  • SAIMM
    Managing The Geotechnical Risk Associated With High And Low Walls At Anglo Coal?s Open Pit Mines. - Synopsis

    By Gift Makusha, Dave Minney

    Anglo Coal South Africa mines coal for both the domestic and export market using open cast and strip mining methods. To establish a mine, a process is set in place to gather ever increasing amounts

    Jan 1, 2006

  • AUSIMM
    Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam Deposit

    By M K. Kapo, S C. Nzama

    The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte

    Aug 18, 2014

  • SME
    Managing the Groundwater Impacts of Tunnel Construction

    By Thomas H. Hibner, Daniel Tempelis, John E. Shamma

    Environmental protection of nearby resources is an issue that can not be ignored in tunnel construction. The Inland Feeder Arrowhead Tunnels Project is no exception. With keen interest from various st

    Jan 1, 2003

  • SAIMM
    Managing the hazard of wind blast/air blast in caving operations in underground mines

    By P. Sharma, J. C. W. Fowler

    This paper discusses the wind blast / air blast phenomenon, how it is managed in coal mines and how it might best be managed in other underground mines. L'article qui suit a pour objets de dé

    Jan 1, 2003

  • AUSIMM
    Managing the Impact of Environmental Law on Major Resource Development Projects

    Ensuring the success of a major resource development project, whether in the Gippsland Basin or elsewhere, is typically both a complex and costly process. It is therefore imperative from the point o

    Jan 1, 1992

  • AUSIMM
    Managing the Margin at Norseman, Western Australia – A Case Study

    By B P. Micke

    Central Norseman Gold Corporation was established in 1935 and has been mining on the Norseman field in Western Australia since then. It is Australia’s longest continuously operating gold mining operat

    Mar 24, 2014

  • SME
    Managing the Medium Term Mine Scheduling Challenges at Bingham Canyon Mine After the Slide

    By A. Moharana

    A massive slide at Bingham Canyon wiped out a side of the pit and covered the main haul road in and out of the pit. All pre-slide mine designs and schedules were no longer valid. New designs and sche

    Feb 23, 2014

  • AUSIMM
    Managing the Mining Industry: World-Class Management for World-Class Performance

    Thank you and good morning. I am delighted to be here and to see so many of my colleagues and competitors. The general topic of this week's conference - World's Best Practice in Mining and

    Jan 1, 1995

  • AUSIMM
    Managing the Ranger Uranium Mine in the Alligator Rivers Region-There is much more to this Business Enterprise than just Procuction

    This paper addresses the unique environ- mental programmes which prevail at Ranger and their importance in the future profitability, of Ranger Uranium Mines Pty Ltd. (RUM) Industrial relations, gene

    Jan 1, 1984

  • CIM
    Managing the replacement and the stocking of equipment engines

    By J. L. Collins

    "This paper deals with the quantitative analysis of mine maintenance records. Based on a case study of dozer engine records, the author suggests an easy method of deriving useful information for manag

    Jan 1, 1987