Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Management of Mine Water Integrated to Mining SystemsBy Owen D
A central part of mine planning is to ensure the protection of the beneficial uses of water. Integrated mining software does not generally provide tools to help the mining engineer to achieve this o
Jan 1, 1995
-
Management of Mineral ResourcesBy Juan P. Camus
Mining is one of the oldest industrial activities. Its products are essential to modern civilization. Paradoxically, and despite a deep-rooted belief to the contrary, mining is not a lucrative indust
Jan 1, 2002
-
Management Of Mines In The FutureBy M. Javier
Management is a major part of sustainability research. Many different aspects of sustainability have already received significant research attention, but the management processes in mining from the pe
Jan 1, 2010
-
Management of Mining Wastes in European Union and Developments in TurkeyManagement of Mining Wastes in European Union and Developments in Turkey
Sep 13, 2010
-
Management of Minor Elements in the Production of Base MetalsBy C Chen, W J. Bruckard, F R. A Jorge
The base metal industry mines and processes hundreds of million tonnes of ore per annum to produce saleable products and large tonnages of waste by-products such as tailings. These ores usually contai
Jan 1, 2006
-
Management of Nitrogen Compounds in Mine Wastewater: Comparing Selective Adsorption and Electro-Oxidation to other Treatment MethodsBy C. Xiao, F. Mohamm, A. Borsoi
"Nitrogen compounds produced by cyanide destruction and/or blasting are often a cause of concern for environmental compliance and at times, for water re-use in metallurgical circuits. Natural attenuat
Jan 1, 2017
-
Management of Obstructions and Adverse Ground Conditions: SCL Tunnel Works on Crossrail C300/410By Olivia Perkins, Shawn Sismondi, Adrian St. John, Vicky Potts
"INTRODUCTION An inherent aspect of any tunnelling project is ground risk: how it is identified, quantified and managed throughout the various stages of a project. Early identification of these risks,
Jan 1, 2016
-
Management of Potentially Acid Forming Overburden at Kaltim Prima Coal, IndonesiaBy Dan Michaelsen, Warwick Stewart
"PT Kaltim Prima Coal (KPC) is a large-scale truck and shovel operation mining thermal-coal in East Kalimantan, Indonesia. The operation produces 15 million tonnes of coal and mines over 120 million b
Jan 1, 1999
-
Management of Radioactive Wastes from Rare Earth Element ProductionBy L. M. Lowe, D. B. Chambers, D. G. Feasby
"The presence of the naturally occurring radioactive elements uranium and thorium in rare earth (RE) resources can present challenges in achieving regulatory and social acceptance. The discovery and a
Jan 1, 2016
-
Management of Ranger Uranium Mine Waters, Kakadu Region, Northern Territory, AustraliaBy Bastias J
The Ranger uranium mine has operated in the Kakadu region of the Northern Territory since 1979. The mine's water management system was designed to cater for the wet-dry monsoonal climate and to
Jan 1, 1988
-
Management Of Risk Associated To The Design Of Block Caving Mine: A Case Study On Chuquicamata Underground Mining ProjectBy R. R. Guzman
In this study, the "Mine Project Risk Management" methodology, MPRM (Botin et al. 2011), has been applied to characterize the sources of uncertainty and to quantify risk in the mining engineering sta
Feb 23, 2014
-
Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mineBy S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi
Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine
Aug 2, 2023
-
Management Of Sample DataINTRODUCTION The mineral sample is the fundamental unit upon which the mineral appraisal is built. Values derived from the sample are the most important quantitative measurements made in the total
Jan 1, 1980
-
Management of Seam Gas Emission and Spontaneous Combustion in a Highly Gassy, Thick and Multi Seam Coal Mine ù A Learning ExperienceThis paper describes operational experience with seam gas and spontaneous combustion management, gained during ten years of production history (1993 to 2003) in the Wynn seam at Dartbrook Coal mine. I
Jan 1, 2005
-
Management of seismic and swelling groundBy P. N. Erasmus
This paper considers the fundamental concepts of support design for underground openings in highly stressed ground. It concludes that the conventional deformed reinforcing bar, woven mesh and cable la
Jan 1, 2009
-
Management of Seismicity at the Beaconsfield Gold Mine, TasmaniaBy A R. Penney
Since mining-induced seismicity first became apparent at the Beaconsfield Gold Mine in 2002, there has been an ongoing program of geotechnical investigations to understand the phenomenon and allow for
Jan 1, 2008
-
Management of Smelter Projects in a Developing CountryBy M. D. Strachan
Technical & Procurement Services Limited (TECHPRO) in Ashford, Kent, UK, have been appointed as Project Managers for the major rehabilitation of the Copper Smelting complex of Nkana Division, Zambia C
Jan 1, 1991
-
Management of Socio-Economic Impact Analysis for Resource DevelopmentBy William E. Stanley
The paper examines the problems that arise in undertaking socio-economic impact studies to meet the requirements of environmental-impact legislation governing new mine development or expansion. An app
Jan 1, 1979
-
Management of Squeezing Ground Conditions at Laronde MineBy P. Turcotte, E. Karampinos
"Construction of underground excavations in squeezing ground conditions faces several technical challenges that can result in delays in production and high costs due to rehabilitation. A review of the
Jan 1, 2015
-
Management Of Subsidence Associated With The Mining Of The Roof Of The Sishen Cave. An Application Of The Slope Stability RadarBy Glen Mc Gavigan
The roof of the Sishen cave is being mined in order to exploit 6.8Mt of high grade ore. The cavity is filled with quartzite backfill in order to support the roof in the event of collapse. The cave d
Jan 1, 2006