Search Documents

Sort by

  • DFI
    Load Tests on Large Diameter Bored Piles in Cemented Sands (e34a0a63-0fa5-40f6-8850-5a2442305f1f)

    By Nabil F. Ismael

    "Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait. T

    Jan 1, 2017

  • IMPC
    Load Torque Estimation for Monitoring Ball Mill Filling

    By Roberto Galéry, Braz J. C. Filho, Marcelo M. Stopa, Douglas B. Mazzinghy, Priscila M. Esteves

    "The purpose of the research is to monitor ball mill filling by means of signals usually measured in its electrical drive. The method is based on the mill torque estimated from rotor speed and inducti

    Jan 1, 2018

  • DFI
    Load Transfer And Capacity Of Drilled Shafts With Full-Depth Casing

    By Rolf Katzenbach

    Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we

    Jan 1, 2007

  • DFI
    Load Transfer Curve of Piles in Sands under Uplift Forces

    By Jogeshwar P. Singh, Aser I. Abbas, Mohamed Ashour

    The presented methodology predicts the pile head response (i.e. pile head load - displacement curve) and develops the load transfer (t-z) curve of piles in sandy soils under tension forces based on so

    Jan 1, 2018

  • SME-ICGCM
    Load Transfer Distance Calibration of a Coal Panel Scale Model: a Case Study

    By Mark K. Larson

    Calibration of LaModel for deep coal mines begins with adjustment of overburden stiffness for load transfer distance. This calibration determines whether mining induced stresses are concentrated in th

    Jan 1, 2012

  • SME-ICGCM
    Load Transfer Distance Measurements at Two Mines in the Western U.S.

    By Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson

    "Load transfer distance (LTD) is simple in concept and usually evident in underground coal mines. Many people in the mining industry recognize LTD as the distance from the panel to where the mine ribs

    Jan 1, 2015

  • SME-ICGCM
    Load Transfer Mechanics In Fully-Grouted Roof Bolts

    By Maynard O. Serbousek

    The mechanics of load transfer of fully-grouted roof bolts in coal mines has been investigated in laboratory and analytical studies. The purpose of this research is to increase the understanding and b

    Jan 1, 1984

  • AUSIMM
    Load Transfer Mechanisms in Reinforcing Tendons

    By Tarrant GC

    Cement and resin encapsulated tendons are widely used in the stabilisation of mine roadways. One of the main factors in controlling the efficiency of the reinforcement is the ability of the tendon

    Jan 1, 1992

  • SME-ICGCM
    Load Transfer Mechanisms In Reinforcing Tendons (59e0902f-c551-42cd-8764-b6dda6eee4b4)

    By M. W. Fabjanczyk

    Cement and resin encapsulated tendons are widely used in the stabilisation of mine roadways. One of the main factors in controlling the efficiency of the reinforcement is the ability of the tendon to

    Jan 1, 1992

  • ISEE
    Load Transfer of Polycarbonate Blast Resistant Glazing Systems

    By Joshua Calnan, Braden Lusk, Kyle Perry

    This paper presents detailed information and data regarding the load transfer characteristics of Blast Resistant Glazing Systems utilizing two different thicknesses of polycarbonate. A series of triax

    Jan 1, 2014

  • DFI
    Load-Deformation Based Design of Deep Mixing for Supporting MSE Walls at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li

    "Detailed design of an extensive deep mixing (DM) scheme using the Cutter Soil Mixing (CSM) technique was completed for foundation support of mechanically stabilized earth (MSE) walls for Kitimat Liqu

    Jan 1, 2015

  • AIME
    Load-Deformation Characteristics Of Model Mine Pillars Before And After Crushing

    By Bashir Ahmed, Fred D. Wright

    Numerous investigators have studied the various factors that influence the ultimate strength of model mine pillars, such as ratio of height-to-least width; restraint or friction on the top and bottom;

    Jan 1, 1972

  • SME
    Load-Haul-Dump

    By Robert M. Stevens, Arnoldo Acuña

    INTRODUCTION In the early 1950s, underground miners and tunnel¬ing contractors were experimenting with ways to supple¬ment or eliminate track-bound loading and hauling equipment. Diesel-powered crawl

    Jan 1, 1982

  • SME
    LoadCapacity and Stiffness Characteristics of Pumpable Standing Support System Used in Underground Coal Mines

    By Timothy J. Matthews, Ted Klemetti, Timothy J. Batchler, Daniel J. McElhinney

    Unplanned tailgate collapses and difficult mining conditions in U.S. longwalls have necessitated the use of innovative tailgate support systems. Severe ground movement induced by longwall loading has

    Jul 1, 2023

  • AUSIMM
    Loader Cut and Fill Stoping the Zinc Corporation, Limited and New Broken Hill Consolidated Limited, Broken Hill

    By Bailey DJ

    Loader cut and fill stoping was first used at New Broken Hill Consolidated Limited mine in 1966. The equipment used included single boom pneumatic jumbos for drilling up- holes, diesel loaders for

    Jan 1, 1982

  • AIME
    Loading

    By Thomas Fraser, David R. Mitchell

    THE primary purpose of the loading plant is to transfer the finished product from the preparation machines to the railroad car, truck, or barge in which it is to go to market. Secondary purposes of th

    Jan 1, 1943

  • AIME
    Loading (51ff4cba-d233-4257-827d-77e60c923215)

    By Thomas Fraser, David R. Mitchell

    THE primary purpose of the loading plant is to transfer the finished product from the preparation machines to the railroad car, truck, or barge in which it is to go to market. Secondary purposes of th

    Jan 1, 1950

  • AIME
    Loading (e55ead06-1892-4060-ae37-100ebc452351)

    By Thomas Fraser, David R. Mitchell

    THE primary purpose of the loading plant is to transfer the finished product from the preparation machines to the railroad car, truck, or barge in which it is to go to market. Secondary purposes of th

    Jan 1, 1943

  • CIM
    Loading and Blasting a Hot Pillar Remnant

    By Roland Hunt

    This paper deals with the practical problems as sociated with blasting a heated pillar remnant. This pillar remnant was the final stage in the blasting of a multi-stag e pillar blast. Production from

    Jan 1, 1977

  • AUSIMM
    Loading and Elution of Gold Thiosulfate from Anion Exchange Resins

    By S Brunt

    A new elution process has been developed for the recovery of gold thiosulfate from ion exchange resins. This is a synergistic system which utilises a base eluent, such as nitrate or trithionate, along

    Jan 1, 2007