Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Keeping Geologists, Production Personnel and Contractors Happy - An Integrated Approach to Blasting at Boddington Gold Mine, WABy McBride N
Location The Boddington Gold Mine (BGM) is located approximately 120 km south east of Perth, Western Australia. (Figure 1). Located within the picturesque Darling Ranges, the land was previously us
Jan 1, 1995
-
Keeping It Focused: Conference Reflects On A Year Of Prudent GrowthDespite two large projects represented in the keynote docket, the mood of the 2011 SME Arizona Conference was summed up best by Ferol Baker, general manager of New Mexico Copper Corp. (a wholly owned
Jan 1, 2012
-
Keeping Projects on the RailsBy J Canterford
Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be
Aug 8, 2011
-
Keeping the Lights On! High Risk Blasting at Boddington Gold MineBy D Rubery, C Croker
The Boddington Gold Mine (BGM) is located 120 km south east of Perth, Western Australia. The operation is managed by Worsley Alumina Pty Ltd and mined by contractor Henry Walker Eltin (HWE). The mine
Jan 1, 2002
-
Keeping up with the Joneses – the value of industry surveys and benchmarkingBy T D. H McGrath, W P. Staunton
Benchmarking, comparing an operation or process with the industry standard, is known to be a useful method for identifying plant optimisation opportunities, and in many cases providing the pathway to
Aug 29, 2018
-
Kelex 100 - A New Reagent For Copper Solvent ExtractionBy James A. Hartlage
Work on the design of Kelex 100 was initiated several years ago at the Research Laboratories of Ashland Chemical Company. The effort was specifically directed toward the synthesis of an organic molecu
Jan 1, 1969
-
Kelian Case StudyBy Barlow S
The Kelian Gold mine project won two excellence awards from the Victorian Division of the Institution of Engineers, Australia. It was a challenging project, fast tracked in a remote and inhospitabl
Jan 1, 1997
-
Kell Hydrometallurgical Extraction of Precious and Base Metals from Flotation Concentrates – Piloting, Engineering, and Implementation AdvancesBy K. S. Liddell, L. A. Smith
"Kell is a hydrometallurgical treatment option for the recovery of platinum group metals (PGMs), gold, silver, and base metals from flotation concentrates to refined products on site. The process is c
Jun 1, 2019
-
Kell Hydrometallurgical Process For Extraction Of Platinum Group Metals And Base Metals From Flotation Concentrates ? SynopsisBy K. S. Liddell
The Kell Process has been developed for the extraction of platinum group metals (PGMs) and base metals from sulphide flotation concentrates. The process has been successfully tested on several differe
Jan 1, 2012
-
Kelley Mine of Anaconda Co.By A. R. Sims
Are from the Greater Butte Project is hoisted through the new Kelley shaft. In 1946 when plans were formulated for the Kelley mine, two test cave blocks were mined by using the facilities of the old S
Dec 1, 1956
-
Kelly Bar LoadingBy C F. Argo
In the past several years the "Kelly Bar", an innovative device, which incorporates borehole d-rifling and explosives loading into a single detail, has come under scrutiny and criticism. The practical
Jan 1, 1975
-
Kelsey Centrifugal Jig Implementation at Namakwa Sands for Zircon Recovery from Quartz RejectsBy P V. A van der Westhuyzen
Namakwa Sands is a heavy minerals mining and beneficiation business in the Exxaro Sands Division, and operates along the West Coast of South Africa (see Figure 1). The business encompasses mining, min
Oct 5, 2011
-
Kelsey Lake: First Diamond Mine In North AmericaBy Howard G. Coopersmith
Kelsey Lake kimberlites are a cluster of eight diamondiferous pipes that occur in the northern State Line kimber lite district of the Colorado-Wyo¬ming diamond province (Coopersmith 1991, 1993) (Fig.
Jan 1, 1997
-
Kemano Power TunnelBy Kenneth R. Dickson, I. Michael Gowring, Gary M. Davey
The Kemano Power Tunnel is currently being constructed by a joint venture of Atkinson, Kiewit, and Commonwealth. The 5.73 m diameter, 16.1 km long tunnel is part of the Kemano Completion Project in Br
Jan 1, 1991
-
Kemess NorthBy Carl Edmunds
Talk Outline Deposit?s Vital Statistics and Economic Environment Regional Geologic Setting Deposit Geology UBC Research Search Model and Current Exploration Plans Kemess Operations Kemess South
May 1, 2006
-
Kemess South Mine Closure and ReclamationBy Georgia J. Lysay
Kemess South Mine ended operations in March 2011. Final reclamation works began during operations in 2008 in anticipation of closure. The focus of reclamation during mine operations was on the inactiv
May 1, 2011
-
Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern AustraliaBy D Timms
The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T
Aug 22, 2011
-
Kennecott Adds Fourth Grinding Circuit at Copperton ConcentratorBy D. S. Bird
Kennecott Utah Copper began a modernization program in 1986 that was aimed at expanding and updating mining and ore process facilities at the company’s Bingham Canyon copper mine and concentrator near
Jan 1, 1995
-
Kennecott Celebrates Its CentennialOn June 4, Kennecott Utah Copper (KUC)marked the centennial of the founding of the original company. Bill Champion is president and chief executive officer of KUC. He said, “What has happened during
Jan 1, 2003
-
Kennecott Completes Four-Year Expansion At Utah Copper DivisionBy John V. Beall
Given: One large, but dated open-pit copper mine and processing plants, down about one third in production capacity in decade because of declining ore grade. Solve for: Restoration of former peak ca
Jan 6, 1967