Search Documents

Sort by

  • AUSIMM
    Installation of No 2 Gold Plant - Shotover River

    L&M have been involved on the Shotover since 1980 when we joined Jack and Barney Ryan, who had started in 1972 with gold at $45 per ounce after a successful career as roading and demolition contra

    Jan 1, 1985

  • SME
    Installation of Paste Backfill Technologies in a High Rock Temperature and Hard Rock Mine, Toyoha, Japan

    By Jiro Yamatomi, Susumu Takemura, Osam Sakai, Hiroshi Shimotori, Yoshio Otsuka

    The Toyoha Mine is operated under extremely high rock temperature. The geothermal heat is 10 to 20 times more active than the average of the Japanese Islands. The highest temperature ever observed in

    Jan 1, 2001

  • SAIMM
    Installation of Resin-Grouted Rockbolts in Hard Rock Mining:Challenges and Solutions for Improved Safety

    By T. G. Maepa

    "The creation of mine excavations alters the stress distribution in the surrounding rock mass. In modern mining, resin-grouted rockbolts are used as a means of support in order to redistribute stresse

    Jan 1, 2017

  • DFI
    Installation of Secant Pile Wall in Rock Adjacent to Fragile Building

    By Chu E. Ho, Alfredas Daugiala, Nicola Ebanks

    "The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr

    Jan 1, 2016

  • CIM
    Installation of Shaft Bottom Steel Prior to Shaft Sinking

    By D. M. Ziebarth

    "Normal sequence of operations to develop a new underground mine is: construct and outfit headframe for shaft sinking, sink shaft, construct and outfit shaft sump, develop shaft station and shaft bott

    Jan 1, 2019

  • SME
    Installation of the No. 4 Shaft and Hoist at the Star Mine`

    By W. E. Crandall

    The Star-Morning mine is a. 1000-ton-per-day lead-zinc producer located in the easterly part of the Coeur d'Alene Mining District of North Idaho. The property includes both the Star and Morning m

    Jan 1, 1971

  • DFI
    Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)

    By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann

    Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and

    Sep 1, 2022

  • DFI
    Installation Parameters, Pile Performance and Importance of Testing

    By Maurice Bottiau

    "Abstract When addressing the performance of deep foundations, many parameters play a role, from adequate soil investigation to performance monitoring and testing. The correct understanding of pile co

    Jan 1, 2014

  • NIOSH
    Installation Techniques - 6.1 The Basic Philosophy

    The investment involved in any communication system represents a considerable sum. Even though it is desirable that the system work properly each and every time it is called into use, some failures ar

    Jan 1, 1984

  • DFI
    Installation, Design, And Quality Control Of Augercast Piles ? Introduction

    By William J. Neely

    Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd

    Jan 1, 1990

  • SME
    Installation, Operation And Maintenance Problems With Large Vibrating Screens In Mineral Processing Applications

    By J. W. Scott

    The problems involved in installing, maintaining, and operating large vibrating screens have been summarized and discussed, based on a survey of current use of such screens in selected North American

    Jan 1, 1983

  • AUSIMM
    Installations of the Computer at Mount Isa

    Mount Isa Mines Limited first installed electronic data processing equipment in 1959. The decision to replace this equipment with a computer was motivated by the need for greater processing power and

    Jan 1, 1968

  • DFI
    Installing And Testing Multi-bar High Capacity Rock Tiedowns

    By Andrew Pontecorvo, Steven Lowe, David Sposito

    Buildings with large height-to-width ratios require foundations with significant uplift resistance. This paper presents a case study of the permanent rock tiedowns installed for One Manhattan West, a

  • SME
    Installing Cyclones on the Primary Grinding Circuit at Cyprus Sierrita

    By Leonard N. Hill

    Cyprus Sierrita Corp. has 16 parallel 5.03 m-diam x 5.8 m long (16.5 ft-diam x 19 ft) primary ball mills, each operating in closed circuit with a nest of cyclones. Before the upgrade to 840 mm (33 in.

    Jan 1, 1994

  • DFI
    Installing Deep Foundations for North America's Largest LNG Projects.

    By Richard Shea

    Morris-Shea, an Alabama-based deep foundation contractor, is installing foundation piles at the sites of North America's two largest liquefied natural gas (LNG) terminals currently under construction.

    Apr 1, 2023

  • AIME
    Installing New Rail Haulage System At San Manuel

    By C. G. Massey, L. C. Acton

    A first-class haulage level railroad was considered of prime importance during planning of San Manuel because successful operation of the mine would hinge heavily on the ability to move large tonnages

    Jan 3, 1962

  • SME
    Instant Tunnel Support In Soft Ground

    By W. Ter-Minassian

    Besides the question of the stability of the roof and walls, one of the main problems encountered with tunnelling and shaft-sinking through the soft ground of alluvial origin forming the sub-grade of

    Jan 1, 1997

  • SME
    Instantaneous Access To Maintenance Data

    By R. Gilges

    The implementation of effective techniques for meeting the maintenance requirements of the new Utah Copper Division smelter, one of the largest in the Western Hemisphere, is a goal of the smelter mana

    Jan 1, 1977

  • AIME
    Instantaneous Access to Maintenance Data in a Copper Smelter

    By G. Kinder, R. Gilges, W. Stoker, R. Davey

    The Bingham Canyon Mine, located 48 km (30 mi) southwest of Salt Lake City, Utah, is operated by Kennecott Copper Corporation's Utah Copper Division. This operation is the world's largest op

    Jan 8, 1978

  • AIME
    Instantaneous Access to Maintenance Data in a Copper Smelter (5c339263-c6a6-4780-b102-4872b9a5d773)

    By G. Kinder, R. Gilges, W. Stoker, R. Davey

    The Bingham Canyon Mine, located 48 km (30 mi) southwest of Salt Lake City, Utah, is operated by Kennecott Copper Corporation's Utah Copper Division. This operation is the world's largest op

    Jan 1, 1979