Search Documents

Sort by

  • AIME
    In Situ Leaching Of Copper-An Economic Simulation Approach (14de6bcc-3edf-421e-a489-acdc2e3fbb74)

    By Donald H. Yardley, A. Aly Selim

    An economic simulation model was developed to predict the amount of copper recovered from copper oxide deposits, and the cost of producing it as a function of the deposit parameters. The economic simu

    Jan 1, 1979

  • SME
    In situ leaching of disseminated gold deposits - geological factors

    By J. G. Wargo

    In situ leaching of disseminate gold deposits has been studied from a theoretical perspective to outline the operating environment for the process. Rock permeability and the relationship of permeabili

    Jan 1, 1987

  • SME
    In situ leaching of disseminated gold deposits - geological factors - by J.G. Wargo Technical Papers, MINING ENGINEERING, Vol. 40, No. 10 October 1988, pp. 973-975

    By J. D. Megeath

    In the October 1988 issue of MINING ENGINEERING, J.G. Wargo's paper discusses the problem of measuring and analyzing permeability, porosity, and fracturing in its relation to in situ leaching of

    Jan 1, 1990

  • SME
    In Situ Leaching Of Disseminated Gold Deposits --Geologic Factors

    By J. G. Wargo

    Disseminated gold deposits are the object of major search and development efforts by many mining companies throughout the world. The invention of more advanced equipment for open pit mining and and us

    Jan 1, 1988

  • SME
    In Situ Leaching Of Uranium ? Summary

    By John A. Sievert

    Sedimentary deposits contain an appreciable portion of the world's supply of uranium. Predictions of nuclear fuel usage in the United States indicate that these reserves will have to be tapped if

    Jan 1, 1970

  • SME
    In Situ Leaching Of Uranium: History, Technology And Economics

    By T. C. Pool

    Physical and chemical conditions permitting, in-situ leaching (ISL) of uranium offers a variety of advantages over conventional production methods including less surface disturbance and less solid was

    Jan 1, 2000

  • SME
    In Situ Leaching of Western Australian Palaeochannel Gold

    By D. C. McDonald, P. R. Whincup, H. Duke

    Due to grade, overburden depth and stability and the presence of groundwater it was considered impractical to recover gold contained in unconsolidated palaeochannel sediments by conventional mining, d

    Jan 1, 1989

  • SME
    In Situ Leaching Wellfield Design At San Manuel

    By M. J. Rex, K. L. Wiley, D. S. Ramey

    In situ leaching, initiated in 1986 at the San Manuel Mine, was economically developed in 1989. The primary reason for this lag time between startup and viable production was the time required for tec

    Jan 1, 1995

  • AIME
    In Situ Leaching: A New Blasting Challenge

    By D. D. Porter, H. G. Carlevato

    Blasting to prepare orebodies for in situ leaching usually involves extraordinary conditions which sometimes require special and innovative techniques. To date several unusually large blasts have been

    Jan 1, 1974

  • NIOSH
    In Situ Measurement Of Rock Mass Properties With Hydraulic Borehole Pressure Cells - Objective

    Develop a simple and practical technique to measure in situ rock mass properties for realistic design and stability evaluation of underground structures. Background The Bureau of Mines has devel

    Jan 1, 1990

  • NIOSH
    In Situ Measurement Of Rock Stress With Hydraulic Borehole Pressure Cells ? Objective

    Develop a new technique of in situ rock stress measurement which can be used when and where the conventional methods, such as the overcoring stress relief methods and the hydrofracturing method, canno

    Jan 1, 1988

  • SME
    In Situ Measurement Of The Heat Conductivity And Thermal Diffusivity At The Waldo Mine

    By P. Mousset-Jones, G. Danko

    Rock thermophysical properties, i.e. heat conductivity and thermal diffusivity, were obtained for reference values at the Waldo Test Mine for mine fire simulation purposes. An in situ measurement meth

    Jan 1, 1989

  • SAIMM
    In Situ Measurement Of The Oxygen Activity Of Low Carbon Steel Ladle Slags

    By J. Janssens, B. Coletti, S. Smets, J. Plessers

    The oxygen activity of the ladle slag determines the reactivity towards the steel during ladle treatment. Therefore, the in situ measurement of the oxygen activity of slags can be an important tool. T

    Jan 1, 2004

  • CIM
    In Situ Measurements and Monitoring for Waste Rock Piles

    By Lee Barbour

    Waste-rock piles from metal mining operations are comprised of large surface deposits of unsaturated, coarse-grained soil and rock. The unsaturated condition and heterogeneous, coarsegrained nature of

    Nov 1, 2002

  • CIM
    In Situ Measurements for Geomechanical Design of Cemented Paste Backfill Systems

    By M. W. Grabinsky

    Better in situ performance data is required in order to advance the rational geomechanical design of cemented paste backfill systems. A few in situ test programs have been conducted, but these have su

    May 1, 2007

  • AIME
    In Situ Measurements of High Frequency Electrical Conductivity and Permittivity of Oil Shale

    By R. J. Lytle, E. F. Laine

    The in situ high frequency electrical conductivity and permittivity of Colorado oil shale were recently measured. The measurements were made at 45 MHz (45 million cps) by transmitting from one borehol

    Jan 1, 1983

  • SAIMM
    In situ measurements of Merensky pillar behaviour at Impala Platinum - Synopsis

    By B. P. Watson

    The Bushveld platinum group metal deposits in South Africa are the largest in the world. These deposits occur as two distinct stratiform tabular ore bodies and strike for many hundreds of kilometres.

    Jan 1, 2009

  • AIME
    In Situ Measurements Of Stress Change Induced By Thermal Load: A Case History In Granitic Rock

    By Philip H. Nelson, Richard Lingle

    Vibrating wire stressmeters (VWS's) and borehole deformation gages (BDG) were deployed in two in-situ heater experiments at Stripa, Sweden to determine the thermally induced stress changes in the

    Jan 1, 1982

  • TMS
    In Situ Micro Raman Study of the NO3 − Electrochemical Behavior in Molten NaNO3–KNO3 Mixtures

    By Zhuo Sheng

    We have designed a high-temperature Raman micro-furnace and cell that is suited for the electrochemical process study of the NO3 − in molten NaNO3– KNO3 (fraction of NaNO3 50 wt%) salt. During the cyc

  • SME
    In Situ Mine Roof Trusses Combining Rock Compression With Steel Tension Members

    By C. C. White

    Although many notable scientific investigations relating to roof control have been made, roof control still must be considered one of the more baffling problems confronting the miner. Each year contri

    Jan 1, 1968