    Improved Copper Electrowinning Operations Using Wrought Pb-Ca-Sn Anodes

    By R. D. Prengaman

    Wrought lead-calcium-tin anodes developed by RSR Corporation have improved the performance compared with the other lead alloy anodes. These anodes have been in continuous service at various locations

    Jan 1, 1999

  • AUSIMM
    Improved Copper Flash Smelting at Olympic Dam

    By W Taylor, S Chen, R Haywood, M White, R West, J Ranasinghe

    In March 2012 a combined BHP Billiton and Hatch team embarked on a program to improve the concentrate burner efficiency of BHP Billiton’s Olympic Dam copper flash smelting furnace. A multi-faceted app

    Sep 7, 2015

  • TMS
    Improved Copper Smelter and Converter Productivity Through the Use of a Novel High-Grade Feed

    By Eugene Jak

    Copper sulphide processing technologies face increasing pressures associated with decreasing concentrate grade leading to increasing thermal inefficiency and lower productivity. Impurity concentration

  • SAIMM
    Improved Copper/Iron Selectivity in Solvent Extraction

    By J. J. Taute, G. Chisakuta, P. Bwando, G. Mitshabu

    "BASF Mining Solutions have developed a new generation of copper solvent-extraction reagents that offer significant benefits over the existing reagents available to the industry today. Initial laborat

    Jan 1, 2015

  • IOM3
    Improved crushing chamber of a cone crusher

    By A. L. Grabovski

    The potential of eccentric cone crushers for fine crushing has been improved by increasing the swing frequency of the moving cone, balancing the crusher, ensuring uniform feed via a rotating funnel wi

    Jun 21, 1905

  • TMS
    Improved CX Process for Spent Lead Acid Batteries Treatment

    By Tullio Corsini

    Scrap battery recovery process, developed by Engitec Impianti S.p.A., is improved transforming batches operations in continuous. Benefits expected: constant and better quality of the products; easie

    Jan 1, 1993

  • AUSIMM
    Improved Decopperising of Lead Bullion at Port Pirie

    By Miller M. J, Bauer J. C

    The continuous copper drossing process operated at Port Pine since 1962 has had limited copper removal capacity as determined by a maximum tolerable Cu/S ratio in feed and the level of sulphur in b

    Jan 1, 1989

  • CIM
    Improved Defect Control and Mechanical Property Variation in High Pressure Die Casting (HPDC) of A380 Alloy by High Shear Melt Conditioning

    By J. L. Nebreda, Z. Fan, J. B. Patel

    "A380 alloy has been widely employed to produce thin-wall components via high pressure die casting (HPDC). During HPDC processing, there is a significant problem of property variation even with the ve

    Jan 1, 2018

  • SME-ICGCM
    Improved Design Of Coal Pillars For U.S. Mining Conditions

    By Z. T. Bieniawski

    This paper presents the results of a survey of room and pillar dimensions and design practice in U.S. coal mines aimed at improving the design procedures in room and pillar mining. A review is given o

    Jan 1, 1981

  • AIME
    Improved Design of Room-And-Pillar Coal Mines for U.S. Conditions

    By Z. T. Bieniawski

    The efficient and safe design of room-and-pillar coal mines still remains as one of the pressing problems facing the mining industry in the United States. Present day design is a trial-and-error appro

    Jan 1, 1983

  • SME
    Improved dewatering characteristics of uranium-industry leach pulp using flocculants and surfactants

    By D. K. Sengupta, T. K. Rout, A. R. Prasad, B. P. Singh

    The filter cake from the vacuum drum filters of a uranium ore processing plant still contains some leach solution. If the filter cake is not efficiently washed the associated leach solution is lost. T

    Jan 1, 2002

  • SME
    Improved Dewatering Of Coal By Steam Filtration - Part I

    By C. E. Silverblatt

    The advent of larger quantities of -1/4 inch coal in the raw feed to the preparation plant and the necessity of recovering this material has made the problem of meeting product moisture specifications

    Jan 1, 1964

  • CIM
    Improved Dewatering of Kaolinite Clay Mineral Dispersions

    By P. Mpofu

    In this work, the modification of interfacial chemistry of colloidally stable kaolinite clay dispersion has been carried out to improve its flocculation performance and dewatering behaviour. Synergist

    Jan 1, 2004

  • DFI
    Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case Study

    By Carl-Oscar Nilsson, Åke B. Nilsson

    "The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the

    Jan 1, 2016

  • SME
    Improved Drill and Blast Designs Free $3.6m of Ore for Surface Copper Mine - SME Annual Meeting 2025

    By Liz Diaz, Tacio Ferreira

    Capstone Copper’s Pinto Valley Mine faced challenges in recovering rock and ore on final walls because of geotechnical constraints that require restrictions on methods for loading blastholes adjacent

    Feb 1, 2025

  • ISEE
    Improved Drill and Blast Designs Free $3.6M of Ore for Surface Copper Mine Tacio Ferreira, Dyno Nobel

    By Tacio Ferreira

    A surface copper mine in the Western United States faced challenges in recovering rock and ore from final walls because of geotechnical constraints that require restrictions on methods for loading bla

    Jan 21, 2025

  • AIME
    Improved Drill Shop Equipment at Morenci Branch of Phelps Dodge Corporation

    By AIME AIME

    AT the Morenci branch of the Phelps Dodge Corporation, of which Frank Ayer is manager, several new types of machines that have been developed by Charles Mitchell, shop foreman in the drill steel shop,

    Jan 1, 1930

  • SME
    Improved drill shroud capture of respirable dust utilizing air nozzles underneath the drill deck - SME Transactions 2009

    By W. R. Reed, J. D. Potts

    This study tests the ability of a new air nozzle system, located under the drill deck shroud, to improve the dust capture of the drill deck shroud. The system consists of three air nozzles supplied wi

    Jan 1, 2009

  • SME
    Improved drill-and-blast designs free $3.6 million of ore for surface copper mine - ME Feature Article

    By Tácio Ferreira, Liz Diaz

    Capstone Copper’s Pinto Valley Mine faced challenges in recovering rock and ore on final walls because of geotechnical constraints that require restrictions on methods for loading blastholes adjacent

    Aug 1, 2025

  • ISEE
    Improved Drilling Accuracy Results in Reduced Ore Dilution at Evolution, Cracow

    By Phil Jones, Ben Johnson

    During a period of six months in FY2018, a series of trials were conducted to compare drilling accuracy using two different methodologies and the subsequent impact this had on ore dilution. Testing wa

    Jan 1, 2019