    High Selectivity for Cobalt/Magnesium Separation by Solvent Extraction in a Pilot Plant

    By M. E. Moraes Castanho de Almeida, A. Ribeiro Cotri

    Recovery of cobalt to produce high grade cobalt sulfate from cobalt concentrate by leaching and solvent extraction was investigated. The PLS typically contains Co 10g/l, Mg 2g/l, Fe < 10ppm, Mn < 200p

    Jan 1, 2014

  • CIM
    High Self-Heating Rate of a Pyrrhotite-Rich Material: H2S as a Fuel?

    By James A. Finch, Stéphanie Somot

    "The self-heating facility developed at the Noranda Technology Centre [Rosenblum and coworkers, 2001; 1995] has now been established in the Department of Mining, Metals and Materials Engineering at Mc

    Jan 1, 2006

  • AUSIMM
    High shear rotor trials in the Mount Isa Mines Copper Concentrator

    By H Law, M Muller

    Mount Isa Mines (MIM) Copper Concentrator currently utilises Agitair 120 banks for its roughing flotation circuit. Apart from a rotor change, the only other significant work completed to the Agitair b

    Aug 29, 2018

  • CIM
    High SO2 Feed Gas Sulfuric Acid Plant Design Option

    By D. J. McLaws

    "Recent innovations in metal smelting technology utilize continuous oxygen-enriched smelting and converting processes which are capable of producing off-gases containing up to 60% SO2 or more. Other S

    Jan 1, 2014

  • AIME
    High Speed Classification and Desliming With the Liquid-Solid Cyclone

    By D. A. Dahlstrom

    Application of the cyclone to separation of undesirable -200-mesh clay, silt, and high-ash fractions from coal slurries was found to possess many economic and process advantages. Up to 93.3 pct remova

    Jan 2, 1951

  • SME
    High Speed Communications In Harsh Environments

    Extending an organization?s knowledge base throughout the entire enterprise can improve operations. Until recently, though, field operations were often left out of the information loop, as extending

    Jan 1, 2009

  • AUSIMM
    High Speed Development Work at Emperor Mine, Vatukoula, Fiji

    With the exhaustion of orebodies close to the main haulage shaft of the Emperor mine, an increased rate of development, aimed at earlier investigation of values disclosed by exploration drill holes ha

    Jan 1, 1966

  • SME
    High Speed Excavation By Drill & Blast With Mechanized Mucking System?Mitholz Railway Tunnels, Switzerland

    By Stig Eriksson

    In Switzerland two major railway systems as shown below in Figure 1 has recently been completed or is under construction: ¦Lötschberg, south of Bern which was commissioned in 2007 ¦Gotthard, south

  • AIME
    High Speed Loading and Unloading of Bulk Ores

    By Richard D. Snouffer

    Prime topics of conversation these days are the new concepts of rail haulage for bulk items such as iron ore, potash and coal. We have heard such ideas as the "integral train" and the "unit train" dis

    Jan 7, 1963

  • ISEE
    High Speed Photography of Stope Blasting in South African Gold Mines

    By P A. Gibson, J R. Brinkmann

    The South African gold mining industry fires approximately 800 000 sloping blastholes daily. A programme aimed at characterizing the stope blasting process is underway in order to identify areas for i

    Jan 1, 1985

  • AIME
    High Speed Photography Used to Redesign Conveyor Transfer Point

    By D. J. Reed

    Concord coal mine near Bessemer, Ala., built, owned, and operated by Tennessee Coal & Iron Div., U. S. Steel Corp., produces only a metallurgical grade for use as coke in blast furnaces of the divisio

    Nov 1, 1956

  • SME
    High Speed Rail Tunnels in California

    By Lee W. Abramson, James E. Crawley

    Caltrans is studying alignments for a 160-kilometer-long high speed ground transportation system from Los Angeles to Bakersfield across the Tehachapi Mountains. This link is needed to connect southern

    Jan 1, 1995

  • SME
    High Speed Shaft Mucking System For Lake Mead Intake Tunnel #3 Access Shaft

    By T. Eggenberg

    Mechanization and automation of logistic equipment has become one of the main key factors in raising productivity and competitiveness especially for complex and larger mining or tunneling projects.

    Jan 1, 2010

  • SME
    High Speed Shaft Sinking Techniques In South Africa

    By David M. MacGillivray

    1. INTRODUCTION The economic importance of bringing a new mine to production in the shortest possible time, is well known. In recent years the rate of escalation of mining costs has accelerated mor

    Jan 1, 1979

  • SME
    High Speed Sheet Stacking

    By Fred J. Fleischauer

    Industry requires higher speed sheet stacking. High speed sheet stacking requires equipment and techniques to solve several inherent difficult problems, such as the tendency for sheets to sail, and th

    Jan 1, 1973

  • SME
    High Speed Shotcrete Tunneling in Chalk for the Channel Tunnel Rail Link in the United Kingdom (North Downs Tunnel)

    By Christian Neumann, Josef Arnold, Albin Reinhart

    The Channel Tunnel Rail Link (CTRL) is the most significant railway infrastructure development project in the United Kingdom since the construction of the Channel Tunnel between France and England. Th

    Jan 1, 2001

  • SME
    High Speed Tunneling Beneath The Streets Of Manhattan

    By Edward S. Plotkin, Thames F. Peyton, Gary A. Almeraris

    This paper describes high speed tunneling by drilling and blasting in a heavily populated urban area. The project consists primarily of mining 2500 m (8237 ft.) of tunnel through mica schist, excav

    Jan 1, 1985

  • AUSIMM
    High Speed, Water Filtration ù The Potential for Novel Polypropylene Fibred, Fabric Media Filters

    The unique chemical and physical properties that can be displayed by polypropylene and its copolymer derivatives are enabling its development as a truly versatile material for water filtration. Well k

    Jan 1, 2004

  • DFI
    High Strain Testing Of Augered Cast Piles At Miami Fort Power Station

    By C. Michael Morgano

    Static tests are costly and time consuming, so they are not always the best answer [ ]

    Jan 1, 2005

  • DFI
    High Strain Testing Of Large Diameter, High Capacity Unlined Bored Piles ? Introduction

    By Dhanvin B. Mehta

    Pile testing is generally understood as static load test. It is our common experience that for high capacity, large diameter bored piles, static testing is expensive and time consuming. It is practica

    Jan 1, 1996