Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Geotechnical Design Of Large Openings At DepthBy Evert Hoek
Two types of failure have to be considered in designing large openings: (a) Structurally controlled failure caused by discontinuity intersections, (b) Stress induced instability which occurs whe
Jan 1, 1981
-
Geotechnical Design Of The Roby Pit, Lac Des Iles MineBy David Stone
North American Palladium is the owner/operator of the Lac des Iles mine located 115 km north of Thunder Bay, Ontario. The mine has produced an average of 65,000 ounces of palladium since 1994. Lac de
May 1, 2001
-
Geotechnical Engineering at Ok Tedi - A Multidisciplinary ApproachBy A P MACONOCHIE
The methods used and some of the results obtained from a major geotechnical study of the Ok Tedi mine area, Papua New Guinea, are described. The study was carried out at both regional and local scal
Jan 1, 1992
-
Geotechnical Evaluation For the Design and Construction of Mine ProjectsBy Trevor A. Moss
Installation of equipment and structures at mines often requires mine planners to evaluate unique loading and operating conditions. Consideration of these unusual features is required throughout desig
Jan 1, 1992
-
Geotechnical Evaluation For The Design And Construction Of Mine Projects (4bd0c866-12e8-4d49-923c-02cf84dcd6fb)By T. A. Moss
The installation of equipment and structures at mines often requires the evaluation of unique loading and operating conditions. Consideration of these unusual features is required throughout design an
Jan 1, 1992
-
Geotechnical Exploration for a Lake Mead IntakeBy Richard F. Coon
Six potential locations along the west shore of Lake Mead were evaluated to site anew water intake pumping station for the SNWA. The evaluations were based upon geotechnical exploration results and c
Jan 1, 1997
-
Geotechnical Exploration For The H-3 Highway Trans-Koolau TunnelBy Lee W. Abramson, William H. Hansmire
The H-3 Project is planning, design, and construction of a 10-mile (16 km)-long final segment of new highway that traverses the Koolau mountain range in Oahu. Interstate H-3 traverses North Halawa Val
Jan 1, 1989
-
Geotechnical Exploration For The Proposed Crosstown Transport Facility San Francisco, CaliforniaBy Timothy N. Dunne, Joseph M. Gonzalez
This paper presents the case history of a comprehensive geotechnical investigation for the Crosstown Transport Facility, a 10,880 m long, 3.2 m diameter pressure tunnel proposed for construction in Sa
Jan 1, 1983
-
Geotechnical Exploration Phase Drilled Shaft Load TestingBy Walter E. Vanderpool
Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and
Jan 1, 2011
-
Geotechnical Factors Affecting Coal Recovery in the Maramarua, Mokau, and Ohinewai DepositsBy B W. Riddol1s
The 1983 Energy Plan calls for an increase in North Island coal production from both underground and opencast sources from the 1982/1983 production of 843 000 tpa to approximately 3.4 Mtpa within the
Jan 1, 1984
-
Geotechnical Factors Affecting Rock Slope Stability in Eastern TennesseeBy William F. Kane, Eric C. Drumm
Rock slope failures in the Great Smoky Mountains of Tennessee are a continuing problem. A study of the geotechnical factors affecting such slopes was conducted in this geologically complex region.
Jan 1, 1986
-
Geotechnical Factors Affecting the Surface Placement of Process Tailings in Paste FormBy D J. A Van Zyl, J C. Cunning
Technological advances associated with the expanded application of paste technology in underground mine backfilling are now stimulating an interest in the disposal of process tailings as paste in the
Jan 1, 1998
-
Geotechnical Factors Contributing to Stockpile Slope StabilityBy Patridge A. C
Observations of coal stockpiles subject to unusual levels of instability showed that the particular coals exhibited 'gap grading', a relative lack of intermediate size particles. This led
Jan 1, 1995
-
Geotechnical Factors In Open Pit Mine DesignBy David Pentz, Paul Hodges
GENERAL INTRODUCTION The object of this paper is to discuss those aspects of open pit mine design which are affected by geotechnical factors. The temptation exists for some practitioners of geotechni
Jan 1, 1977
-
Geotechnical Factors in Undercut-Cave MiningBy Louis A. Panek
INTRODUCTION Block caving is distinguished from other types of mining in its requirements that the mineral body to be extracted must cave after a relatively large tabular open¬ing is created undernea
Jan 1, 1982
-
Geotechnical Factors Influencing A Time-Dependent Deformation Mechanism Around An Entry In A Dipping SeamBy M. K. Larson
The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms in strata around a longwall gate road system at two sites in an underground coal mine near Ham, WY.
Jan 1, 1996
-
Geotechnical Factors Influencing Violent Failure In U. S. MinesBy Brian White, Hamid Maleki
Sudden, violent failures of rock around mine openings influence access, ventilation, and safety in both hard-rock and coal mines. To develop predictive tools for assessing the potential for violent fa
-
Geotechnical Influences on Blast Induced Stress Wave Propagation, Copper Cliffs, OntarioBy Roger S. Jackson
"This study interprets vibrations produced by single underground shots, recorded on surface by 135 digital seismographs laid out in four linear arrays. Several vibration anomalies were observed and ar
Jan 1, 2010
-
Geotechnical Information Applied to Mine DesignBy I. W. Farmer
Case histories are introduced to illustrate how an understanding of the mechanics of deformation of mine structures associated with longwall layouts can be used to improve stability. Particular exampl
Jan 1, 1982
-
Geotechnical Input to the Porgera Gold Project, Enga Province Papua New GuineaBy Mules GJ
Geotechnical investigations have played a key role in influencing decisions for development of the Porgera Gold Project in the highlands of Papua New Guinea. Porgera is located 130 km west-northwest o
Jan 1, 1990