Search Documents

Sort by

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    Geotechnical Considerations for Longwall Top Coal Caving at Austar Coal Mine

    By Adrian L. Moodie

    Austar Coal Mine (formerly Southlands and Ellalong Collieries) has had a long association with difficult strata control conditions associated with mining depth and a highly jointed/cleated coal seam.

    Jan 1, 2011

  • SME
    Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO Project

    By Jean Habimana

    The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather

    Jan 1, 2008

  • CIM
    Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, Yukon

    By Nick D. Rose

    The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,

    May 1, 2002

  • SME
    Geotechnical Considerations In Coal Mine Planning And Design ? Introduction

    By Madan M. Singh

    Increasingly, geotechnical data are being collected for various types of coal development projects. In many cases, a specific design concern is addressed. However, many data collection programs are no

    Jan 1, 1985

  • SME-ICGCM
    Geotechnical Considerations in Highwall Mining Applications in Indonesia

    By Takashi Sasaoka, Hiroshi Takamoto, Kikuo Matsui, Hideki Shimada

    "Indonesia is the second largest coal exporter to Japan. Almost all the coal is produced from open cut mines. However, a great deal of coal is left in the highwalls of the mined-out pits. The use of h

    Jan 1, 2010

  • SME
    Geotechnical Considerations In Nuclear Power Plant Construction And Licensing ? Introduction

    By James W. Mitchell

    On December 2, 1942, a scientific team lead by Nobel Prize winner Enrico Fermi first initiated and controlled a self-sustaining nuclear chain reaction. This historic event occurring beneath the stands

    Jan 1, 1974

  • SAIMM
    Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No. 3 Shaft

    Konkola No 3 shaft experienced severe mining-induced stress and time-related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow

    Jan 1, 2005

  • SAIMM
    Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No.3 Shaft.

    By M Lipalile, A B. Tunono, A W. Naismith

    Konkola No 3 shaft experienced severe mining induced stress and time related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow

    Jan 1, 2005

  • SME
    Geotechnical Considerations In Underground Coal Gasification

    By J. M. Avasthi

    Gulf Research & Development Company conducted the nation's first underground coal gasification test in steeply dipping beds near Rawlins, Wyoming. The geotechnical considerations played a major r

    Jan 1, 1981

  • AIME
    Geotechnical Considerations in Underground Coal Gasification (b0daa032-49f3-4f12-ab84-34160644e033)

    By J. M. Avasthi

    The DOE-funded (Contract No. DE-ACO3-77ET13108) Gulf Research & Development Co. (GR&DC) field tests of underground coal gasification in steeply dipping beds (UCG/SDB) were conducted in the North Knobs

    Jan 1, 1984

  • SME
    Geotechnical Considerations No. 7 Subway Line Extension Project in New York City

    By P. K. Das, S. K. Singh, C. C. Chang, E. C. Wang, R. B. Roberts

    As part of the New York City’s redevelopment of the far west side of mid-town Manhattan, this project will add 1.5 miles of twin bored tunnel to No. 7 Subway Line. The proposed alignment extending fro

    Jan 1, 2005

  • SME-ICGCM
    Geotechnical Constraints On A 6 M Single Pass Longwall

    By Ross W. Seedsman

    The feasibility of 6 m high single pass longwalling has been studied using Newlands Mine as a case study An intensive geological investigation identified a range of hazards but a mine layout was possi

    Jan 1, 1992

  • SAIMM
    Geotechnical Data Analysis to Select a Feasible Method for Development of a Long Axis, Large Diameter Vertical Ventilation Shaft

    By E. J. Walls, W. C. Joughin

    "In selecting a suitable method to sink a vertical shaft for underground access, a number of constraints influence the ultimate decision of where and how to develop the shaft, not least among these be

    Apr 1, 2019

  • SME
    Geotechnical data collection and application to the Leeville underground mine - SME Transactions 2010

    By Changshou Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 3,175 t (3,500 st) of ore per day with an average gold grade of 12.6 g/t (0.4 opst). The mine has a large horizont

    Jan 1, 2010

  • SME
    Geotechnical Data Collections And Applications At The Leeville Underground Mine

    By C. Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 3,300 tons of ore per day with an average gold grade of 0.4 opt. The mine has a large horizontal extent of 2,500 f

    Jan 1, 2010

  • DFI
    Geotechnical Design and Performance of Road and Railway Viaducts Supported on DSM Columns - A Summary of Practice

    By Michal Topolnicki

    "Discussed is the use of wet Deep Soil Mixing, generally executed with single mixing tools 0.8 to 1.6m in diameter, employed in the foundation of viaduct supports. The applications involve economical

    Jan 1, 2015

  • SAIMM
    Geotechnical Design Considerations For The Proposed Oyu Tolgoi Open Pits, Southern Mongolia

    By Peter Voulgaris, Allan Haines, Diane Walker, Ian de Bruyn

    The Oyu Tolgoi porphyry gold and copper project is located in the south Gobi region of Mongolia. The Ivanhoe Mines project has the potential to become a long-life copper and gold producer that could

    Jan 1, 2006

  • SAIMM
    Geotechnical Design For Open Pits At Tanjianshan, China

    By Huang Zhiwei, Paul Skayman, Kevin Holley

    In 1989 The First Brigade for Geology and Mineral Exploration of Qinghai Province discovered gold at Jinlonggou and Qinlongtan, Tanjianshan. Between 1992 and 2002 small scale mining was carried out a

    Jan 1, 2006

  • SME
    Geotechnical Design of Devil’s Slide Tunnel

    By Y. Nien Wang, Moe Amini, Heiner Sander, Max John

    INTRODUCTION As the population increased along the coast route (California Route 1), and the people’s need to have guaranteed access increased, the landslides and related road closures began to ha

    Jan 1, 2005