Search Documents

Sort by

  • CIM
    Fast PB Process: Plating Lead at 10,000 A/M2

    By M. Maccagni, J. Nielsen

    "The recovery of lead from battery paste has been investigated for a long time and with the use of many different electrolytes. A number of processes have been presented, but none of them reached even

    Jan 1, 2016

  • SME
    Fast Rock Segmentation Using Artificial Intelligence

    By S. Tafazoli, D. Cooper, I. Bell, S. Nouranian, B. Sameti, M. Ramezani

    "Image-based rock fragmentation sensing in mines and quarries includes an important rock boundary delineation step, commonly referred to as rock segmentation. This paper presents an artificial intelli

    Jan 1, 2018

  • SME
    Fast track construction at Asamera’s Cannon gold mine - a case study

    By Donald C. Moore

    Introduction Asamera Minerals (US) Inc. and its joint venture partner, Breakwater Resources Ltd., discovered ore grade gold mineralization on their 20 km2 (5000 acre) Wenatchee, WA land position in F

    Jan 2, 1989

  • SME
    Fast Track Construction Project -A Case Study

    By D. C. Moore

    The decision to proceed on a "fast track" construction project is not" without risks as well as rewards. An understanding of some of the risks prior to start of the project will maximize the rewards.

    Jan 1, 1988

  • CIM
    Fast Track Reactivation -Jacobina Mine

    Mine Evaluation Engineering , Operational and Social evaluation. Focus is on what opportunities are available. Social ??History ??Past Management Practices ??Community / Available labor force Mi

    May 1, 2006

  • SME
    Fast Tunneling With Drill & Blast Tunnel and Shaft Construction at the Sixth Water Aqueduct

    By Bruce McKinstry

    INTRODUCTION In June of 1992, the Bureau of Reclamation, United States Department of the Interior, awarded the contract for construction of the Sixth Water Aqueduct to the Fedrick-Redpath Joint Ventu

    Jan 1, 1995

  • AUSIMM
    Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support

    By V Louchnikov

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th

    Mar 21, 2011

  • SAIMM
    Fast, Safe, And Fully Mechanized Installation Of High-Tensile Chain-Link Mesh For Underground Support ? Synopsis

    By B. Schoevaerts

    The ever-increasing depth of mineral extraction presents a challenging environment for hard-rock underground mines. High in situ stresses and associated seismicity with potential rockburst hazards are

    Jan 1, 2012

  • AIME
    Fast-Analysis Computer System Monitors Kidd Creek Yield On-Line

    At the Kidd Creek mine operated by Ecstall Mining, Ltd. near Timmins, Ontario, Honeywell has installed a sophisticated new quick- thinking computer system that keeps tabs on conditions along three sep

    Jan 8, 1968

  • SME
    Fast-Track Construction At Mount Polley

    By Malcolm J. A. Swallow

    In June 1997, Mount Polley Mining Corp., a division of Imperial Metals Corp., completed an 18-kt/d (20,000 stpd) gold-copper mine in central British Columbia. Fast-track construction and extensive off

    Jan 1, 1998

  • CIM
    Faster Analysis: Recent Advances in GEOSCAN on-Belt Analysis Techniques Allowing for Rapid Real-Time Measurement of Minerals

    "Real-time, on belt analysis of minerals is becoming increasingly important and critical in modern operations, especially in the mine-to-mill. Prompt gamma neutron activation analysis has long been ut

    Jan 1, 2017

  • AIME
    Faster Calculation of Plane Triangulation Systems

    By Richard Hamburger

    Calculating machines permit the use of the more rapid cotangent and semigraphic solutions of plane triangulation. The results of these methods are as accurate as those of other methods. Simple adjustm

    Jan 1, 1950

  • AIME
    Faster Calculation of Plane Triangulation Systems by Calculating Machine and Semigraphical Methods

    By Richard Hamburger

    Calculating machines permit the use of the more rapid cotangent and semigraphic solutions of plane triangulation. The results of these methods are as accurate as those of other methods. Simple adjustm

    Jan 2, 1950

  • NIOSH
    Faster Roof Bolt Hole Drilling - Objective

    Minimize drilling time in roof bolting. Approach The Bureau of Mines conducted a survey of 34 roof bolting machines used in underground coal mines. Results of the survey indicated that drillin

    Jan 1, 1986

  • SME
    Faster Underground Mine Development: Getting To First Ore Quicker Using A Novel, Non-circular Tunnelling Machine - SME Annual Meeting 2022

    By D. Ofiara, M. Lewis

    Tunnel Boring Machines (TBMs) have been used in mining in decades past, but their use has been limited and sporadic. This has changed in recent years, with TBMs being used at Stillwater Mine, Grosveno

    Mar 2, 2022

  • SME
    Fatal Accident Analysis and Hazard Identification in Turkish Coal‑Extracting Industry Using Analytic Hierarchy Process - Mining, Metallurgy & Exploration (2024)

    By Arif Emre Dursun

    The aim of this study is to present hazard classifications of location, type, and causes of accidents in Turkish coal-extracting industries using Analytic Hierarchy Process (AHP). In this study, fatal

    Dec 30, 2023

  • SME
    Fatal accident analysis and hazards identification in Turkish coal-extracting industry using analytic hierarchy process

    By Arif Emre Dursun

    The aim of this study is to present hazard classifications of location, type and causes of accidents in the Turkish coal-extracting industry using the analytic hierarchy process (AHP). In this study,

    May 1, 2024

  • NIOSH
    Fatal Accidents Due To Flyrock And Lack Of Blast Area Security And Working Practices In Mining

    By Suresh K. Bhatt, Gary L. Mowrey, Timothy R. Rehak, David K. Ingram

    Coal and nonmetal mining used about 4.3 billion pounds of explosives and blasting agents during 2001 in the United States. A major part of this consumption was related to surface mining. Mine Safety

  • NIOSH
    Fatal And Nonfatal Injuries: MSHA Data

    This chapter presents an overview of fatal and nonfatal injuries reported to MSHA during 1986-1995. Reportable injuries follow the criteria for reporting specified in 30 CFR 50. These criteria are lis

    Jan 5, 2000

  • AUSIMM
    Fatal Flaws in Technical Due Diligences

    By A J. H Newell

    The background and the basis for conducting a Technical Due Diligence are discussed as well as the source information, typical studies and potential limitations. Typical short comings including ‘show-

    Sep 7, 2015