Estimation Of Diesel Particulate Concentrations In Underground MinesBy R. A. Haney
The Mine Safety and Health Administration has developed a model to estimate diesel particulate (dp) exposures in underground mines. The estimate uses either in-mine measured dp concentrations or engin
Jan 1, 1998
-
Estimation of diesel particulate concentrations in underground mines (Technical Paper)By G. P. Saseen, R. A. Haney
The US Mine Safety and Health Administration (MSHA) developed a model to estimate diesel particu¬late (dp) exposures in underground mines. The estimator uses in-mine measured dp concentrations or engi
Jan 1, 2000
-
Estimation Of Exploration Potential Of A Metallogenic Unit By Parametric Modeling Of The Distribution Of Mineral Occurrences When Exploration Is Incomplete. Case Study: Walker Lake Quadrangle Of Nevada And California.By Tetevi B. Wilson
Analysis of the distribution of ore-bodies in space can be useful generally in the estimation of mineral resources or the management of exploration. This study is di¬rected to analysis of the undiscov
Jan 1, 1992
-
Estimation of Fe grade at an ore deposit using extreme gradient boosting trees (XGBoost)By Firat Atalay
Estimating the spatial distribution of ore grade is one of the most critical steps to proceed with an investment decision on a deposit. Kriging is the most widely used method to estimate the ore grade
Dec 1, 2024
-
Estimation of Fines Generation in Blasting Using Dynamic Rock Properties and a Near-Field PPV Damage Model "Mining, Metallurgy & Exploration (2020)"By Kwangmin Kim, Junnhyeok Park
In the hard-rock mining industry, the generation of fines during blasting is an important issue because it has a significant effect on production processes. Although various approaches have been used
May 16, 2020
-
Estimation of Flyrock Travel Distances: A Probabilistic ApproachBy M F. L Gibson
The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f
Jan 1, 2001
-
Estimation of Foundation Design Loads for Liquefaction Induced Lateral Spreads Using Strain Wedge MethodBy Jogeshwar P. Singh, Mohamed Ashour
The Soil-Foundation-Structure-Interaction (SFSI) problem involves Kinematic Soil- Foundation Interaction occurring during large (cyclic and permanent) ground deformations as well as Inertial Foundatio
Jan 1, 2015
-
Estimation of Friction Properties of Rocks from Deformation MeasurementsBy W. R. Dearman, N. Turk
The theoretical relations between the strain and stress Mohr circles make it possible to establish a relation between the internal friction angle [ ] and the Poisson's ratio (v) of rocks. The in
Jan 1, 1986
-
Estimation of Future Ground Vibration Levels in Malmberget Town Due to Mining-Induced Seismic ActivityBy T. Wettainen
Malmberget town is located in northern Sweden, approximately 70 km north of the Arctic Circle. Parts of the town overlie more than 20 iron orebodies, consisting mainly of magnetite with smaller quanti
Jan 1, 2014
-
Estimation Of Gold Ore Reserves At Mt. Charlotte, Kalgoorle, Western AustraliaGold occurs at Mt. Charlotte associated with a stockwork of pyritised quartz veins in Unit 8 of the Golden Mile Dolerite. The ore- body is massive, 200m long and 40m wide and has been proved to over
Jan 1, 1979
-
Estimation of Grinding Time for Desired Particle Size Distribution and for Hematite Liberation Based on Ore Retention Time in the Mill Mining, Metallurgy and ExplorationBy Rameshwar Sah, Bharath Kumar Shanmugam, Govinda Raj Mandela, Marutiram Kaza, Harsha Vardhan, Harish Hanumanthappa
Iron ores obtained from different sources differ in their chemical and physical properties. These variations make the process of grinding a difficult task. The work carried out in this context focuses
-
Estimation of Grinding Time for Desired Particle Size Distribution and for Hematite Liberation Based on Ore Retention Time in the Mill Mining, Metallurgy and Exploration (ff4e1177-21df-44a1-9ca7-c600c2bd555d)By Rameshwar Sah, Bharath Kumar Shanmugam, Govinda Raj Mandela, Marutiram Kaza, Harsha Vardhan, Harish Hanumanthappa
Iron ores obtained from different sources differ in their chemical and physical properties. These variations make the process of grinding a difficult task. The work carried out in this context focuses
-
Estimation of High Grade Copper Slope Grades in QTS North, Cobar Mines, Cobar NSWBy Schofield N. A
The cross-sectional method of stope grade estimation at Cobar Mines has consistently had several shoneomings, me most imponant of which being mat stope grade is significantly overestimated in the high
Jan 1, 1993
-
Estimation of hoisting power requirements for friction and drum hoists for prefeasibility studies in CanadaBy D. J. Farmer
Mining hoists are major components of any underground mine, however, the detailed design work required to get the actual power required for a particular hoist is outside the scope of preliminary feasi
Jan 1, 1997
-
Estimation Of Horizontal Deformational Property Using A Pressuremeter Test For The Evaluation Of Lateral Bearing Capacity Of A PileBy Hyung-Min Kwon
There are a number of methods available that can be used to estimate the bearing capacity of piles that are subject to lateral load, such as the theory of subgrade reaction or the elastic continuum ap
Jan 1, 2008
-
Estimation of Hydraulic Conductivity of Underground Rock Cavern: A Case StudyBy Zhiye Zhao, Jianping Sun, Zhipeng Xu
"The subsea rock cavern project is an underground storage facility. For cost-effective and safe excavation, the risk caused by the groundwater seepage into the rock cavern must be addressed. As one of
Jan 1, 2015
-
Estimation of in-situ material strengthBy Danell. R. E.
A drill monitoring system has been developed which measures performance characteristics of a rotary drill and relates this to the material strength and rotary specific energy. The drill monitor is com
Jan 1, 1989
-
Estimation Of In-Situ Stress At Ikeshima Colliery Using AE And DRA MethodBy Hideki Shimada
A low cost methodology that allows the determination of in- situ stress using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stages
Jan 1, 2001
-
Estimation Of Inclusion Size In Stainless Steel Coil Based On Statistics Of Extreme ValuesBy Yu-ichi Kanbe
It becomes more important to control the composition of inclusions with increasing the demand for quality of products in terms of cleanliness. Along with the development of refining technology to make
Jan 1, 2006
-
Estimation Of Incremental Haulage Costs By Mining Historical Data And Their Influence In The Final Pit Limit DefinitionBy R. Benito
This paper describes the application of modern data-analysis tools, such as data mining, to determine a representative cost driver for haulage activity. This cost driver was subsequently used to trace
Jan 1, 2008