Search Documents

Sort by

  • DFI
    Estimating N Value from Data in Press-In Piling

    By Yukihiro Ishihara, Nanase Ogawa, Ming Lei

    "Abstract In the Press-in Method, a static jacking force is used to install a prefabricated pile, while a reaction force is gained from previously installed piles. This piling technique has solved pro

    Jan 1, 2014

  • AUSIMM
    Estimating Particle Size Fraction Proportions - A Multiscale Approach Using Multiple Kernel Learning

    Estimating Particle Size Fraction Proportions - A Multiscale Approach Using Multiple Kernel Learning

    Sep 13, 2010

  • SME
    Estimating Post-Mining Pit Lake Geochemistry Utilizing Geochemical And Numerical Modeling

    By D. A. Bird

    Geochemical models using published thermo-dynamic data and laboratory derived kinetic rate laws allow prediction of post-closure pit lake geochemistry at open pit mining sites. A combination of "forwa

    Jan 1, 1994

  • SME
    Estimating Process Design Gold Extraction, Leach Residence Time and Cyanide Consumption for High Cyanide-Consuming Gold Ore

    By G. Plenge, M. Brittan

    "Plant design parameters for gold extraction, leach residence time and cyanide consumption are generally determined from standard bench-scale bottle roll or agitation leach tests. The application of l

    Jan 1, 2015

  • SME
    Estimating Production and Costs for Electric Mine Shovels

    By Frank J. Hirner

    Economic open-pit and surface mining often call for ever increasing volumes of lower grade materials. So it is important, often critical, to develop precise expense and production estimates for the la

    Feb 1, 1981

  • SME
    Estimating Recoverable Reserves: Developments In Geostatistical Ore Reserve Estimation

    In addition to capital and operating costs, the accurate estimation of ore reserves is a key component to the successful outcome of any feasibility study. In recent years, there have been many project

    Jan 1, 1998

  • SME
    Estimating Recoverable Reserves: Developments In Geostatistical Ore Reserve Estimation (6233c2f1-d6b2-4041-9d9a-0a3cb963948b)

    The accurate estimation of ore reserves along with capital and operating costs are two key components to the successful outcome of any feasibility study. In recent years, there have been many project

    Jan 1, 1994

  • AUSIMM
    Estimating Reserves Of Stone And Sand For Use By The Construction Industry

    It is no longer possible to establish a quarry on the most convenient hill then abandon the site, leaving a scar if the stone or sand in the deposit is found to be unsatisfactory. Before approval i

    Jan 1, 1979

  • AIME
    Estimating Revenues

    By Dr. O’Neil Thomas J., Donald W. Gentry

    Who steals our gold and silver, and copper, zinc and lead? Who takes the joy all out of life and strikes our high hopes dead? Who never wrote a schedule that to anyone else was clear? The sulphur-

    Jan 1, 1984

  • SME
    Estimating Rippability by Rock Mass Classification

    By Hardy J. Smith

    The rock mass parameters which need be evaluated to estimate the rippability of rock are briefly outlined and their significance is discussed. Several methods used for estimating rippability are compa

    Jan 1, 1986

  • CIM
    Estimating Rock Mass Properties and Seismic Response Using Higher Order, Discontinuous, Finite Element Models

    By D. A. Beck

    The load-deformation response of discontinuous rock under static and dynamic loading conditions has been simulated using Explicit Finite Element models. The intent of the analysis was to investigate t

    May 1, 2009

  • SME-ICGCM
    Estimating Rock Mechanics Parameters through Shear Wave Analysis with Well Cad

    By William R. Kohl, Craig B. Clemmens

    "Since 2010, North Central Resources, Bridgeport, WV, has been using the sonic log to estimate the rockmechanics properties of the coal and adjacent strata in their exploration drilling program. In 68

    Jan 1, 2015

  • SME-ICGCM
    Estimating Rock Strengths Using Drilling Parameters During Roof Bolting Operations - Progress Report

    By Yi Luo

    Accurate mechanical and geological information of the roof strata is vital for roof bolting design in underground mines. In order to obtain such information in a timely manner, a research has been und

    Jan 1, 2002

  • SME
    Estimating Rock Tunnel Water Inflow

    By Ronald E. Heuer

    It is not possible to accurately predict water flow into rock tunnels during construction, because all of the relevant factors cannot be accurately determined ahead of time. But an estimate is needed,

    Jan 1, 1995

  • SME
    Estimating Rock Tunnel Water Inflow—II

    By Ronald E. Heuer

    A 1995 RETC paper of similar title presented a method for estimating rock tunnel water inflow based on semi-empirical correlations with borehole water pressure tests. Since that time the author has fo

    Jan 1, 2005

  • AUSIMM
    Estimating Sampling and Analytical Errors of Multiple Source Mine Output Blended into a Shipping Product

    Most internationally traded iron ore resources are derived from multiple mine sites, transported to a port facility where they are blended and possibly further processed prior to shipping. Provided th

    Mar 1, 2010

  • SME
    Estimating Secondary Mining Potential Of Inactive And Abandoned Appalachian Highwalls

    By D. E. Hinkle

    Past surface-mining operations in Appalachia primarily followed mountain con-tours. It is estimated that about 18,000 mi. of highwalls are exposed throughout Appalachia. An evaluation procedure for de

    Jan 1, 1989

  • SME
    Estimating Site Closure Costs A Critical Tool For Reclamation Planning

    By T. Hawthorne, H. Barnes

    Homestake Mining Company has developed an estimating model, based on other closed projects, to audit and prepare new estimating plans. The results of recent closure audits reveal that the original bu

    Jan 1, 2000

  • SME
    Estimating Strain and Stress in Oriented Rock Cores Using a Diametral Deviation Method

    A practical core-based method for estimating in situ stress was tested using 360° measurements of rock core diameter in a laboratory setting. In several mining districts across West Virginia, rock cor

    Jan 7, 2020

  • AIME
    Estimating Support Requirements From Simulation Of Key Blocks

    By Lap-yan Chan

    Chan and Goodman (1983) presented a procedure for simulating joint traces and identifying key blocks on an excavation. This paper defines six measures of support requirements that characterize the num

    Jan 1, 1984