Search Documents

Sort by

  • CIM
    Equipment problems and their resolutions

    By W. D. Watson

    "Early in mine development at Quintette Coal Limited major problems were encountered with the fleets of primary equipment which seriously hampered production. These major fleets (cable shovels, hydrau

    Jan 1, 1988

  • SME
    Equipment Reliability Improved At Barrick Goldstrike

    By Dirk Bleazard

    Barrick Goldstrike Mines is improving the reliability of mining and processing equipment through the use of failure analysis and condition monitoring activities. Program results include an increase in

    Jan 1, 1998

  • SME
    Equipment Reliability: An Indicator For Sustainable Development In Mining

    By N. Vayenas

    Modern mines possess a wide variety of capital intensive equipment. Equipment failures and the associated down time contribute significantly to the overall maintenance, operating and production costs

    Jan 1, 2007

  • AIME
    Equipment Scheduling - Including Utilization And Availability

    By J. J. Sense

    10.2-1. Equipment Scheduling. In any earth-moving operation, more profit may be earned or lost by equipment scheduling than by any other single facet of the project. Many now-defunct earth movers woul

    Jan 1, 1968

  • AUSIMM
    Equipment Selection - What is the Issue? What About the Application of Simulation Packages?

    The selection of the mining fleet can have as much of an effect on the efficiency and effectiveness of an operation as the mining method. This is not to say that inefficiencies are only attributable t

    Dec 6, 2010

  • SME
    Equipment Selection and Utilization

    By Jean-Michel Rendu

    Equipment capital operating costs represent a significant portion of the total cost of most mining operations, and a variety of computerized methods have been developed to assist in the selection and

    Jan 1, 1989

  • SAIMM
    Equipment selection based on the AHP and Yager’s method

    By M. Yavuz

    One of the challenging problems for optimization in mining operations is to choose the best equipment among the alternatives. Equipment selection is an important task for mine management due to its op

    Jan 1, 2015

  • SME
    Equipment Selection For Burden Removal Associated With Deep Seated, Thick Seam Coals

    By Max B. Holfeltz

    [Many factors impact the selection of one mining method over another for deep seated, thick seam coat deposits. Generally if an operating mine is recovering coal at high volumes from thick seams then

    Jan 1, 1983

  • TMS
    Equipment Selection for Chloride Circuits

    By G. R. Waters

    NMR360 is developing a suite of chloride-based metals extraction processes, with the first commercial operation scheduled for commissioning late in 2018. It is critical, therefore, that with the intro

  • SAIMM
    Equipment Selection For High Selective Excavation Surface Coal Mining

    By H. Aykul

    The choice of which mining method to use at many large surface coal mines is often dicated by what machinery is available or what experience the mine management can offer. One of the most significant

    Jan 1, 2007

  • AUSIMM
    Equipment Selection for Narrow Vein Operations

    By Hare G

    The emphasis in Australia, until recently, has been on large scale mining methods with drive sizes in excess of 4.5 metres square and the acceptance of high dilution ratios, even when working in relat

    Jan 1, 1993

  • AUSIMM
    Equipment Selection for Reclamation and Parting Removal

    By Wright G. N

    Curragh Queensland Mining Limited, a co-venture of Australian and overseas interests, operates an open cut coal mine 13 km north of the township of Blackwater in Central Queensland, refer attached loc

    Jan 1, 1992

  • SME
    Equipment Selection Using Simulation Of Dragline Stripping Methods - Introduction

    By Matthew J. Hrebar

    Dragline stripping operations account for over one-half of the U.S. bituminous coal production mined by surface coal mining methods. The dragline is a popular stripping tool because of its flexibility

    Jan 1, 1979

  • AUSIMM
    Equipment Set-Up of Kumera Steam Dryer Plants in Non-Ferrous Metal Smelters

    By I KylmSkorpi, H Mansikkaviita

    The traditional direct-heated drying process has been replaced by the steam drying process in non-ferrous metal smelters, where steam is available from waste heat boilers. Many recent projects have se

    Jan 1, 2008

  • SME
    Equipment Task Simulator Used In Evaluation Of Operator Performance

    By M. Lotfi

    The criteria for evaluating equipment operator performance were identified as the changes in reaction time, the changes in physiological responses, and the changes in subjective reporting of stress. D

    Jan 1, 1989

  • AIME
    Equipment, Automation, Rock Mechanics Principles And Safety Interfaces In The Control Of Roof And Ribs Of Mines

    By James J. Scott

    INTRODUCTION This paper presents the basic principles which must be followed to create a truly inherently safe mining system. The need to relate the support mechanism to be employed to the ground

    Jan 1, 1982

  • SME
    Equipment, Ground Control, And Safety Considerations For Thick-Seam Underground Coal Mining

    By Christopher J. Bise

    The potential of the coal reserves in the western United States for meeting future energy needs has been recognized for quite some time. However, two of the major constraints which have tended to limi

    Jan 1, 1981

  • AIME
    Equipment, Ground Control, and Safety Considerations for Thick-Seam Underground Coal Mining (c9f780a1-ca6d-49a3-ae12-ca4a0e7b5ae2)

    By R. V. Ramani, C. J. Bise

    The potential of deep-mineable coal reserves in the western United States for meeting future energy needs has been recognized for quite some time. However, two of the major constraints tending to limi

    Jan 1, 1984

  • AIME
    Equipment, Methods and Materials - Hydraulic Fracturing – Fracture Flow Capacity vs Well Productivity

    By John M. Tinsley, Calvin D. Saunders, H. K. van Poollen

    In the past few years much con-sideration has been given to the evaluation of the effect of hydraulic fracturing on the productivity of wells. Generally, these studies included the evaluation of fract

  • IIMP
    Equipo moderno para la minería moderna de cielo abierto

    By Ismael Marquez

    El presente texto describe la tecnología realizada en los equipos utilizados (pala, draga, camión, perforadora) en la minería peruana de cielo abierto. Respecto al diseño de perforadoras se debe consi

    May 1, 1980