Search Documents

Sort by

  • SME
    Drill and Blast Operations and Water Control Measures atLake Mead Intake No. 2

    By Richard W. Kimball, Richard F. Coon

    This paper describes drill and blast excavation and groundwater control measures at the Lake Mead Intake No. 2 project. The construction includes a deep access shaft, intake shaft, surge chamber, fore

    Jan 1, 1999

  • ISEE
    Drill and Blast Optimization at the Sparkhule Limestone Quarry

    By Paul L. Matrin

    This paper will discuss the recent and on-going drill and blast optimization measures at the Sparkhule Limestone Quarry, which have resulted in a 44% reduction of drill and blast unit costs per ton of

    Jan 1, 2004

  • ISEE
    Drill and Blast Trial Planning During Drill-Mill Optimization Project

    By Tristan Worsey, John Henchion, Nathan Rouse, Yannick Lauras

    "This paper presents an approach used to plan and evaluate drill and blast trials for a mine that currently mechanically excavates in-situ rock. The document presents the approach used to plan the tri

    Jan 1, 2017

  • AUSIMM
    Drill Blast Optimisation

    Scientific drilling and blasting techniques are currently being presented to the mining industry as an aid in the overall optimisation process. The degree of success in the development of these techn

    Jan 1, 1990

  • AUSIMM
    Drill Blast Versus Reverse Circulation Grade Control Sampling ù A Case Study From the Mt Muro Gold Silver Mine, Central Kalimantan, Indonesia

    Mt Muro was a gold and silver mine in Central Kalimantan on the Island of Borneo, Indonesia. Aurora Gold through its Indonesian subsidiary Indo Muro Kencana owned the project. Processing commenced in

    Jan 1, 2003

  • AIME
    Drill Core Scanner Proved In Field

    By W. W. Vaughn, R. H. Barnett, E. E. Wilson

    Soon after the search for uranium ores on the Colorado Plateau began in earnest, thousands of feet of drill core ranging from 1 1/8 to 2 1/8 in. diam became available for study. Although significant

    Jan 6, 1959

  • AUSIMM
    Drill Hole Logs Provide the Third Dimension for Minespoil Reclamation

    The establishment of vegetation onto open cut mine spoil is dependant on the nature of the soil and rock strata of the overburden. Experience has shown that in the Bowen Basin of Central Queenslan

    Jan 1, 1987

  • AUSIMM
    Drill hole spacing analysis for classification and cost optimisation – a critical review of techniques

    By J Levett, O Rondon, I Glacken

    Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl

    May 24, 2023

  • CIM
    Drill Maintenance Process Improvements: Brunswick Mine

    By Steven Doyle

    Presentation Outline ?Introduction to Brunswick Mine ?Mining Needs and Drilling Trends ?Maintenance Program ?Back to Basics ?Results ?Additional benefits Introduction Xstrata Zinc Brunswick

    Nov 1, 2011

  • ISEE
    Drill Monitoring & Navigation Systmes at BHP Billiton's Navajo Mine

    By John Vynne

    BHP’s Navajo coal mine installed drill monitoring and high precision navigation systems on their three overburden drills during 2002 and 2003. Details of the DrillNav system hardware and reporting sys

    Jan 1, 2007

  • ISEE
    Drill Monitoring and GPS Developments and their Impact on the Drill to Mill Process

    By John Vynne

    Too often, a mine’s operations, including drilling, blasting, loading, hauling, crushing, processing, etc., are considered independent steps, rather then a continuous process. In fact, these are inter

    Jan 1, 2001

  • ISEE
    Drill Monitoring and GPS Developments and their Impact on the Drill to Mill Process

    By John Vynne

    Too often, a mine’s operations, including drilling, blasting, loading, hauling, crushing, processing, etc., are considered independent steps, rather then a continuous process. In fact, these are inter

    Jan 1, 2000

  • SAIMM
    Drill monitoring at Venetia Mine

    By R. Hummel

    In the quest to reduce overall costs and improve operating efficiency, the application of GPS based technology in open pit mining has evolved significantly in recent times. Venetia Mine has been leadi

    Sep 1, 2001

  • CIM
    Drill monitoring for geological mine planning in the Viscaria copper mine, Sweden

    By Håkan Schunnesson, Kirsten Holme

    "When mining high grade, narrow ore bodies, the mining method often implies a very detailed knowledge of the ore contacts to avoid unacceptable ore loss and waste rock dilution. During the past decade

    Jan 1, 1997

  • AUSIMM
    Drill Monitoring Investigation in a Western Canadian Surface Coal Mine

    By Peck J. P, Kennedy D

    Drill performance monitoring studies were recently completed at the Fording River mine, British Columbia. Microprocessor-based instrumen- tation and data analysis techniques were developed with the o

    Jan 1, 1989

  • ISEE
    Drill Monitoring Systems and the Integration with Drill and Blast Software

    By John Vynne, John Hutchings

    There have been a number of recent technological advances in instrumentation for blasthole drills, and more specifically in drill monitoring and HPGPS guidance systems. Likewise, great strides have be

    Jan 1, 2011

  • IOM3
    Drill productivity evaluation by monitoring

    A production drill rig at a site in Sweden was equipped with a monitoring system to estimate production statistics. Drill running times, drill hole depths, penetration rate, rotation speed, thrust, ai

    Jun 19, 1905

  • CIM
    Drill Rig Navigation and Drill Plan Creation using IREDES

    By André van Wageningen

    Since the beginning of this century Boliden Mineral and Atlas Copco have worked together in stages on improving the accuracy and quality of drilling. Navigation of the drill rigs with IREDES has been

    Oct 1, 2009

  • AIME
    Drill Sampling and Interpretation of Sampling Results in the Copper Fields of Northern Rhodesia

    By H. T. Matson

    IN the Northern Rhodesia copper fields the size of the orebodies and the exceptionally consistent values over great distances made it possible to outline the ore with drill holes spaced at 1000-ft. in

    Jan 1, 1930

  • AUSIMM
    Drill Steel Sharpening Practice at Lake View and Star Gold Mine

    The drill steel' sharpening shop, which stands adjacent to the Chaffers shaft, is built to the dimensions of 110 ft. 9 in. by 58 ft. wide, and is air conditioned in order to maintain reasonable w

    Jan 1, 1941