Search Documents

Sort by

  • CIM
    Development Problems and Techniques in the Fort St. John Natural Gas Area

    By F. G. Vetsch, F. A. Ronaghan

    "Introduction1N THE FALL of 1951, Peace River Allied Fort St. John No. 1 well was drilled in Lsd. 1, Section 9 Township 83, Range 18, West of the 6th Meridian, on the flats of the north side of Peace

    Jan 1, 1954

  • SME-ICGCM
    Development Process for a Greater Capacity Propsetter® System

    By Christopher J. Brown

    "Proper ground stability in gate roads has been a critical aspect of success in longwall mining. In particular, the tailgate has proven to be one of the more active mine areas that needs to be managed

    Jan 1, 2017

  • AIME
    Development Program in a Part of the Ventura Avenue Oil Field

    By Joseph Jensen

    MANY fields have been zoned by nature with shales and intermediate waters between oil zones. Limitations thus imposed have been the basis on which the field was developed. In contrast thereto, in the

    Jan 1, 1930

  • AUSIMM
    Development Rates Using Conventional Continuous Miner Technology in Deep Underground Mines in Australia

    By Misra A

    The development of roadways in underground mines in Autralia is by conventional continuous miner technology. The rate of development achieved using this technology is improved by modifications to this

    Jan 1, 1991

  • SAIMM
    Development status of coal industries in the world’s major coal-producing countries

    By G. Song, X. Liu

    The global coal industry has changed significantly in recent years. In this paper we analyse the coal production and consumption, imports and exports, and coal prices in China and other major coal-pro

    Aug 8, 2024

  • SAIMM
    Development status of coal mining in China

    By Y. Yang, L. Li, X. Liu

    Coal mining in China is facing the transition from output to quality. Based on the total mining capacity and average production, the current situation of coal mining at mine, city, and province levels

    Jan 26, 2023

  • CIM
    Development Status of Thin, Spray-on Liners for Mining and Civil Engineering Applications

    By James F. Archibald

    Research has been conducted for the Workplace Safety and Insurance Board of Ontario (WSIB) to characterize thin, spray-on lining materials (TSLs), as well as combinations of TSLs and conventional spra

    May 1, 2006

  • AUSIMM
    Development Strategy of the Trident Underground Gold Mine

    Avoca Resources LimitedÆs Higginsville Gold Project has a resource base of over 1 300 000 oz of gold. The Trident underground mine, which forms the basis of the project development, has a resource bas

    Jan 1, 2008

  • AIME
    Development System for Blockcaving Under Severe Conditions

    By Peter F. Weiss

    INTRODUCTION Austro-American Magnesite Co. of Radenthein, Carinthia, Austria, is a wholly owned subsidiary of General Refractories Company, Bala Cynwyd, USA, and has been incorporated since 1908.

    Jan 1, 1981

  • ABM
    Development Tapered Plate On Gerdau Plate Mill

    By Antônio Augusto Gorni, Fabio Adriano da Silva, Emanuelle Garcia Reis, Afrânio Márcio Costa

    Gerdau Ouro Branco´s plate mill started the operation in 2016 with high level technology. Stands out the capacity to produce different thicknesses in a same plate, therefore allowing special service f

    Oct 1, 2019

  • CIM
    Development Through Paste and Rock Fill

    By Robert White

    ?Introduction of BMS?Paste fill generalities?Development through paste?Development through rock fill?Conclusion ?Brunswick mine is operated by Xstrata. The mine has been in operation since 1964 and p

    Feb 1, 2008

  • CIM
    Development Trend of Underground Rock Support

    By C. C. Li

    Traditionally, strong and stiff devices, such as fully encapsulated rebar bolts and concrete lining and arches, are preferred for underground rock support. The attention is paid to the strength of the

    Jan 1, 2015

  • AIME
    Development Trends And Application Of Geophysical Research In Mines Of The Ostrava - Karvina Coal Field

    By B. Stas, L. Siska, L. Dlouhy, A. Skrabis

    The basic research program of the Scientific Coal Research Institute at Ostrava - Radvanice into the problem of geophysics has been influenced by the specific nature of present urgent geo- physical pr

    Jan 1, 1971

  • AUSIMM
    Development Wash/Screen Process to Beneficiate Christmas Island B-Grade Phosphates

    Christmas Island contains large deposits of phosphate minerals varying from high-grade calcium-phosphate (apatite) to lower grade iron and'aluminium phosphate (crandallite/millisite). The surfa

    Jan 1, 1971

  • SME
    Development work continues for open-pit mining at Red Dog

    By S. Hodgson

    Introduction The Red Dog zinc/lead deposit in northwest Alaska is the second largest zinc deposit ever discovered. Being developed by Cominco Alaska, with startup scheduled for early 1990, it will ul

    Jan 12, 1988

  • AIME
    Development Work With Trackless Equipment

    By Elmer A. Jones

    Development work in mines of St. Joseph Lead Co., Southeast Missouri, using trackless loading equipment shows definite advantages: Speed of cleaning, ability to work on steep grades and sharp crosscut

    Jan 1, 1950

  • AIME
    Development Work with Trackless Equiprnent

    By Elmer A. Jones

    Development work in mines of St. Joseph Lead Co., Southeast Missouri, using trackless loading equipment shows definite advantages: Speed of cleaning, ability to work on steep grades and sharp crosscut

    Jan 6, 1950

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • AUSIMM
    Development, Application and Potential of a Real - Time Return Gas Monitoring System

    By Williams RJ

    This paper presents an overview of the design and development , application to date and potential of a real-time return gas monitoring system.Initially developed as an ACARP/Industry funded project, w

    Jan 1, 1998

  • ISEE
    Development, Application and Review of Ontario's Quarry Blasting Vibration Guidelines

    By Lance McAnnuff

    Whatever system is devised to control noise and ground vibration from blasting operations must present an effective compromise between the rights of the individual to be undisturbed by the actions of

    Jan 1, 2004