Search Documents

Sort by

  • SME
    Design, Operation, And Control Of A Teeter-Bed Hydroseparator For Classification

    Teeter-bed (i.e., hindered-bed) separators are used throughout the mineral processing industry for both classification and density separation. The high capacity and sizing characteristics of these uni

    Jan 1, 2010

  • IMPC
    Design, Optimization and Transfer of a Process for Biodissolution of Precious Metals from Used Electronic Equipment

    By C. Stollberg

    The recovery of valuable materials from electronic waste is of growing importance for the re-source management not only in the industrialized nations. Being a significant step in an innovative automat

    Jan 1, 2014

  • DFI
    Design, Prediction And Performance Of Tied Back Shotcrete Walls Supporting Masonry Hospital Structures

    By Frank Borda

    Two recent projects were completed in Ontario, Canada for major hospital additions that involved excavation support of heritage masonry structures. Conventional continuous caisson wall schemes were re

    Jan 1, 2004

  • IMPC
    Design, Simulation and Operation Column Flotation

    By J. B. Rubinstein

    "The paper gives an overview of the history of flotation machine development. The laws of their evolution are stated and the place and role of column flotation are demonstrated.The major parameters of

    Jan 1, 2003

  • IMPC
    Design, Simulation and Operation Column Flotation (ABSTRACT PAGE)

    By J. B. Rubinstein

    "The paper gives an overview of the history of flotation machine development. The laws of their evolution are stated and the place and role of column flotation are demonstrated.The major parameters of

    Jan 1, 2003

  • AUSIMM
    Design, Simulation and Operation of a New Generation of Column Flotation Machines

    By Gerasimenko MP

    The authors consider the features and advantages of a new promising trend in mineral processing - column flotation. Design aerohydrodynamic and process characteristics of pilot-scale columns are stu

    Jan 1, 1993

  • DFI
    Design, Specification And Installation Of Square Shaft Helical Piers In Expansive Soils

    By John S. Pack

    The application of square shaft helical piers in expansive soils is a standard of practice in many areas of the United States. Over 20 years of performance monitoring show exceptional performance and

    Jan 1, 2007

  • TMS
    Design, Start-Up And Operation Of The Cyprus Miami Copper Refinery

    By J. Garvey

    The new Cyprus Miami electrolytic copper refinery was commissioned in October 1994. The refinery has been operating at its design capacity of 190,000 short tons per year, and in recent months to 110%

    Jan 1, 1999

  • CIM
    Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding Technology

    By Lyne Côté, Jose Adante

    "The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n

    Jan 1, 2009

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • CIM
    Design, testing and performance of the world’s first fuel cell mine vehicle—a production locomotive

    By A. R. Miller, G. Desrivières, T. MacKinnon, H. Bursey, M. C. Bétournay, B. Replogle, D. L. Barnes, P. Laliberté

    "A mine production locomotive, the world’s first applied industrial fuel cell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Pr

    Jan 1, 2004

  • SME
    Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow Tunnel

    By K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith

    Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East

    Jan 1, 2007

  • SME
    Design-Bid-Build Contracting: Climbing Out of a Paradigm Sinkhole

    By Randall J. Essex

    Public and private owners of infrastructure projects face a number of real and perceived constraints when considering design-bid-build (DBB) procurement for underground projects. Thus, they may not be

    Jan 1, 2003

  • SME
    Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft

    By Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker

    The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P

    Jan 1, 2007

  • SME
    Design-Build of the New Mississippi Outfall Tunnel at I-25 for Denver’s T-Rex Project

    By Jon Y. Kaneshiro, John S. Griffith, Anthony F. Stirbys, Mauricio Andrade

    This paper presents an overview of the New Mississippi Tunnel Outfall for the Transportation Expansion Project (T-REX). The Outfall conveys highway and other urban drainage to the South Platte River a

    Jan 1, 2003

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • SME
    Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

    By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline

    Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump

    Jun 13, 2023

  • DFI
    Design-Build Support Of Excavation For Block 76, Salt Lake City, Utah

    By Rick Deschamps

    The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake

    Jan 1, 2009

  • DFI
    Design-Build Synergy To Deliver Pile Foundations

    By David P. Sauls

    Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa

  • SME
    Design-Build: Elevating Partnering to a Higher Level

    By Curtis A. Pledger, H. Lee Wimmer, I. Michael Gowring

    The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value

    Jan 1, 2003