Search Documents

Sort by

  • ISEE
    Design and Construction of an Electric Oven to Determine the Detonation Temperature of the Fulminant

    By Alexander S. Escalante, Luis R. Ramirez, Nelson A. Arostegui

    Research, analyze, discuss, design, and build an electric oven to perform one of the quality control tests the fanel or common fulminers to determine what temperatures they can detonate at. Give pract

    Feb 1, 2020

  • SME
    Design And Construction Of Bins

    By F. Forbes

    For many years, the Machinery Division of Dravo Corporation has been designing and constructing bins and hunkers as part of overall plant facilities. We have designed bins to handle a variety of mater

    Jan 1, 1968

  • DFI
    Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis

    By N. S. Yet

    This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C

    Jan 1, 2000

  • SME
    Design And Construction Of Bulkheads For Underground Backfill Systems

    By A. Afrouz, F. P. Hassani

    The types of bulkhead that contain backfill in stopes under various pressures and mining conditions are outlined. Conventionally adopted theoretical and empirical techniques were integrated in the des

    Jan 1, 1993

  • SME
    Design and Construction of Clay Liners for Gold Tailings Facilities and Heap Leach Pads

    By Bruce S. Brown, Jeremy P. Haile

    The construction of tailings facilities and heap leach pads for gold mining operations generally requires the installation of one or more impermeable liners beneath the structures to satisfy environme

    Jan 1, 1988

  • CIM
    Design and Construction of Deep Shaft Concrete Linings in the UK

    By F. A. Auld

    "During the period 1958-1980 seven deep shafts were sunk from the surface in the UK. From 1977 until 1989 sixteen deep shafts were sunk in the UK, all concrete lined. Subsequently from 1989 up to the

    Jan 1, 2019

  • DFI
    Design And Construction Of Drilled Shafts In Iraq

    By Frederick C. Rhyner

    The United States government sponsored the construction of a new vehicular bridge over the Diyala River in Bubriz, Iraq. This paper describes the geotechnical engineering for design and construction

    Jan 1, 2009

  • DFI
    Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro Clay

    By Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong

    "Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al

    Jan 1, 2017

  • SME
    Design and Construction of Dulles Airport Tunnels

    By Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field

    With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn

    Jan 1, 2007

  • SME
    Design And Construction Of Earth Bottom Thickeners

    By Edward S. Hsia

    Pluor Utah has been closely associated with the engineering and construction of earth bottom thickeners for porphyry copper operations, for the counter-current decantation circuit of a gold cyanide pl

    Jan 1, 1977

  • SME
    Design And Construction of Emergency Pedestrian Egress Tunnels, Essex Junction, Vermont

    By Bradford F. Townsend, Robin B. Dill, Richard M. Croswell

    Innovative geotechnical construction techniques were used to construct three pedestrian tunnels under a building slab-on-grade to allow utilization of basement space for manufacturing. Tunnels were co

    Jan 1, 1993

  • SME
    Design and Construction of EPB Tunnels Within an Artesian Groundwater Aquifer - Addressing Environmental Issues

    By Adrian Coombs

    The York Durham Sewage System (YDSS) Interceptor Tunnel Project is located in the Town of Richmond Hill, Ontario, Canada, just north of Toronto. Construction commenced in September 2006 and completion

    Jan 1, 2008

  • SME
    Design and Construction of Gold Hill Tailings Impoundments

    By Gordon I. McPhail, John D. Nelson

    Tailings management represents a major portion of the cost associated with extraction of gold. For each gram of gold extracted, 150 to 200 kg of waste material is produced. Because of environmental co

    Jan 1, 1987

  • DFI
    Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric Project

    By James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford

    "Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock

    Jan 1, 2017

  • CIM
    Design and Construction of Hydrostatic Mine Shaft Liners Using Cast Iron Tubbing Technology

    By J. Ouellet

    The design of hydrostatic liner for a deep potash mine shaft in Saskatchewan poses tremendous technological challenges. Technology has evolved to a point where one could consider a new innovative appr

    Aug 1, 2013

  • DFI
    Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury Bridge

    By Frederick C. Rhyner

    Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw

    Jan 1, 2004

  • SME
    Design And Construction Of Lake Mead Intake No. 3 Shafts And Tunnel

    By Jon Hurt

    INTRODUCTION The entire scope of new facilities for Lake Mead Intake No. 3 includes a sub-merged intake structure, a deep tunnel beneath Lake Mead, a tunnel access shaft, Intake Pumping Station No. 3

  • AUSIMM
    Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia

    By B Chapman, B Gaida, L Drowley

    The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw

    Sep 17, 2014

  • DFI
    Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich Bridge

    By Andrew Peterson

    The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi

    Jan 1, 1999

  • SME
    Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022

    By M. Trim, Y. Sun, D. Tepavac, A. Kumar

    Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse

    Dec 1, 2022