Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction for the Widening of the M2 Norfolk Twin TunnelsBy A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? SummaryBy Chris Harnan
This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques
Jan 1, 2000
-
Design and Construction Logistics for the Underground Laboratory at Cern, SwitzerlandBy Keith Jones, Martin Knights, Timothy Watson
In 1996 a KBR (Brown and Root) led international JV was appointed to design and supervise an underground and surface package. The design of 6 km of tunnels, plus enlargements, deep shafts in glacial a
Jan 1, 2003
-
Design and Construction of a 1/40th Scale Longwall Mine Model for Physical Testing of Methane ExplosionsBy R. C. Gilmore, J. McMack, G. E. Bogin, J. F. Brune, C. DeRosa
"Researchers at the Colorado School of Mines are designing and building a 1:40 scaled physical model of a fully operational longwall coal mine. The purpose of the model is to minimize the occurrence o
Jan 1, 2019
-
Design And Construction Of A 5-Kt (5500-St) Facilities Module For Main Pass 299 Sulfur MineBy C. W. Nelson, A. G. Moody
This paper describes the design, equipment selection and onshore fabrication of the largest facilities module ever installed in a single lift in the Gulf of Mexico. Measuring 35.5 x 70.1 x 21.3 m (110
Jan 1, 1994
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching StopeBy J. F. Able, F. Djahanguiri
The US Bureau of Mines conducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would m
Jan 1, 1998
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching StopeBy F. Djahanguiri
The U.S. Bureau of Mines is conducting research on underground stope leaching of metalliferous ores to minimize the environmental impact of ore processing on the surface and to maximize minable reserv
Jan 1, 1995
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching StopeBy F. Djahanguiri
The US Bureau of Mines con¬ducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would
Jan 1, 1997
-
Design And Construction Of A Cut-Off Wall In Warm PermafrostBy Steven L. Anderson
A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5
Jan 1, 2010
-
Design and Construction of a Deep Underground Station in Urban Area - RETC2021By Verya Nasri
This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i
Jun 13, 2021
-
Design and Construction of a Deep, Dual-Cell, Slurry Wall Shaft in Soft GroundBy Edwin Itzig-Heine, Daniel Traylor, Bernard Tarralle, Michael McKenna
This paper discusses the challenges associated with the design and construction of a dual-cell, “figure eight” shaped shaft in saturated, soft ground for the Northeast Interceptor Sewer project in Los
Jan 1, 2003
-
Design And Construction Of A Micropile Wall To Stabilize A Railway Embankment.By Jim Bruce
This paper presents details of a slope stabilization scheme built in late 2003 at a 16m-high railway embankment in southern Ontario, Canada. The owner, faced with continuing maintenance and safety iss
Jan 1, 2004
-
Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel ProjectBy Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal
Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som
Jan 1, 2001
-
Design And Construction Of A New Mine - The Design Of Mimosa #2 Mine ? IntroductionBy Ulises Deveze T.
The coal company Minerales Monclova, S.A. (MIMOSA), the owner of the Mimosa R Line, is a subsidiary company of Altos Hornos de Mexico, S.A., the largest steel plant in Mexico with an annual capacity o
Jan 1, 1974
-
Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert
The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover
Dec 1, 2022
-
Design and construction of a surface air cooling and refrigeration installation at a South African mineImpala Platinum?s No.16 Shaft mine is currently under construction and is expected to reach full production of 256 500 tons per month by 2014. Mining will start at 1 260 m below surface with a maximum
Jan 1, 2009
-
Design and Construction of a Unique Shaft Bottom Structural System for a Potash MineBy E. Nolasco, J. Ouellet, T. Tikka
"Shaft bottom structural systems are used in underground mining to support transfer of personnel, equipment and ore to and from underground to the surface. This paper first summarizes the evolution of
Jan 1, 2019
-
Design and Construction of a Vehicular Underpass Under a Live HighwayBy Nai-piu Tong, Huaren Dou, Sui-shun Poon, Leslie H. Swann
This paper mainly presents geotechnical aspects of a vehicular underpass that was built across under one of the busiest highway in Hong Kong. The underpass, in a section comprising an upper arch and i
Jan 1, 2003
-
Design And Construction Of Access Shaft And Cross Adit Los Angeles Metro Rail Tunnel Contract A146By Wolfgang H. Roth, Stephen J. Navin, Samuel K. Louis, Anthony F. Stirbys
This paper presents a case history of the design and construction of the access shaft and cross adit utilized to gain access to the Los Angeles Metro Rail tunnel alignment, at the A146 Contract site.
Jan 1, 1989
-
Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) WallBy Allan Sylvester
Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel
Jan 1, 1997