Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design And Commissioning Of The Macraes Pressure Oxidation CircuitBy MD Cadzow, TW Quaife, DJ Lunt, TS Giraudo
The Macraes Gold Project, operated by Gold and Resource Developments NL, engaged Minproc Limited to assist with the evaluation of a pressure oxidation circuit, this being the key component of a recove
Jan 1, 2000
-
Design and Commissioning of the Ridgeway ConcentratorBy B Clemen, D Gordon, F Cesnik, P Griffin
In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm
Jan 1, 2003
-
Design and Commissioning of the Sepon Copper Pressure Oxidation CircuitBy A G. Pavlides, B L. Weekes
The Sepon Copper Project is located in the Savannakhet Province of Laos PDR and is operated by Lane Xang Minerals Ltd (LXML). An Ausenco - Bateman Engineering joint venture, the Khanong Development Gr
Jan 1, 2005
-
Design And Construction Aspects Of A Deep Basement In Dublin - SynopsisBy Philip J. Daynes
As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase
Jan 1, 2003
-
Design and Construction Aspects of CSO Tunnel and Pump Station SystemsBy Verya Nasri, James Sullivan, Alex Varas
"INTRODUCTION Many major cities in the United States have a combined storm water and sanitary sewer network. Regular rainfall overwhelms the system capacity and results in millions of cubic meters of
Jan 1, 2016
-
Design and Construction Aspects of Pneumatically Applied Concrete Final Tunnel Linings - Recent Experience at the East Side Access (ESA) Project in New YorkBy Alfredo Valdivia, Jesus Schabib, Vojtech Gall, William Cao, Curt Cicileo, Andrew J. Thompson
"The East Side Access Project (ESA) involves the construction of geometrically complex underground structures including a large number of caverns and bifurcations. Initially conceived as dual lined st
Jan 1, 2016
-
Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble DepositsBy Marco Fellin, Van E. Komurka
Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.
Jan 1, 2019
-
Design And Construction Challenges At The Gualcamayo MineBy N. Ward
The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Fig. 1). A property of Yamana Gold Inc., it declared commercial production in July 2009 and has a total mineral rese
Jan 1, 2011
-
Design And Construction Challenges At The Gualcamayo Mine ? IntroductionBy N. Ward
The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Figure 1). A property of Yamana Gold Inc, it declared commercial production in July 2009 and has a total mineral re
Jan 1, 2011
-
Design and Construction Challenges at the Piney Branch CSO 049 Storage Tunnel in Washington, DC - NAT2024By Ritika Kundu, Moussa Wone, Amanda M. Morgan, Tatiana K. Proctor
The Piney Branch CSO 049 Storage Tunnel (PBST) will be the last major project for the DC Clean Rivers Program. The project includes construction of a 2,200-foot-long, 18-foot-internal-diameter storage
Jun 23, 2024
-
Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray
The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und
Jun 13, 2021
-
Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022By Christopher Nelsen, Daniel Dobbels, R. Zachary Hollenbeck
Recent major floods have inundated Historic Ellicott City, Maryland, resulting in loss of life and property damage. Howard County, Maryland, has developed the Ellicott City Safe and Sound Plan to miti
Dec 1, 2022
-
Design and Construction Challenges for the North Temple Tunnel - NAT2022By Todd Kilduff, Michael Tinney
The North Temple Tunnel pedestrian underpass in Salt Lake City, UT was built using a pipe canopy method that met significant challenges in potentially running ground conditions. Kilduff Underground En
Dec 1, 2022
-
Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base TunnelBy Michael Rehbock-Sander
The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked
Jan 1, 2012
-
Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White
The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame
Jun 13, 2021
-
Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall
The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana
Jun 13, 2023
-
Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver FormationBy Ken Andromalos
Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili
Jan 1, 2007
-
Design And Construction Constraints Imposed By Unique Geologic Conditions In New York City - SynopsisBy George J. Tamaro
The design and construction of foundations in the New York City area are usually dictated by the widely varying geologic conditions encountered in the five boroughs, particularly along the spine of Ma
Jan 1, 2000
-
Design and Construction Contract C916 Beauty World Station and Tunnels, SingaporeBy R McDonough
DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal
Sep 17, 2014
-
Design and Construction Evolution of the Kemess Mine Tailings DamBy Georgia J. Lysay
The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat
May 1, 2007