Construction of the NATM Tunnel at San Diego State UniversityBy Justin Brown, Michael Kobler, Dave Ragland, Bob Shufflebotham
PROJECT OVERVIEW As the sun-bronzed San Diego students strolled casually to class, mining crews from Atkinson Construction were working only 9 meters below the surface. The330 meter long, 11.3 met
Jan 1, 2003
-
Construction Of The New Plant Of Continuous Sludge Disposal System At Hot Rolled Annealing And Pickling LineBy Makoto Suzuki
After hot rolling, stainless steel strip is processed by the Hot Rolled Annealing and Pickling line (HAP) , where H2SO4 or mixed acid of HNO3 and HF is normally used. In the pickling bath, metal oxide
Jan 1, 1996
-
Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi
The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op
Jun 13, 2021
-
Construction Of The North Dorchester BAY Cso Storage Tunnel In BostonBy J. Davies
This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long
-
Construction of the NuMI Underground Laboratory FacilitiesBy Christopher Laughton, Michael P. Bruen
At Fermilab, a 4000-ft long underground complex has recently been constructed for a high-energy physics experiment. The complex is sited up to 350 ft, below grade principally in bedrock. The rock exca
Jan 1, 2003
-
Construction Of The Pacheco Pumping Chamber And ShaftsBy Russell Clough
The Pacheco Pumping Plant is situated on the west end of San Luis Reservoir in western Merced County, California. It is designed to draw water from the reservoir and pump it into a 3,500,000 gallon re
Jan 1, 1985
-
Construction of the Pergau Hydroelectric Power Project, MalaysiaBy Patrick J. Doig
In mid-1991, the design/build contractor set to work on the Pergau HEP in a remote corner of Malaysia, armed with only a slim volume of conceptual drawings. The next five years saw roads, power lines,
Jan 1, 2001
-
Construction of the Plymouth Tunnel by SEM Based on a Permanent Shotcrete Liner for The Purple Line Project in Maryland: A Case Study - RETC2021By Nicholas Tabor, Norbert Fuegenschuh, Richard Taylor, Jean-Marc Wehrli
The Plymouth Tunnel forms part of the 16-mile long route of the Purple Line Light Rail Project promoted by the Maryland Transit Administration. The tunnel is approximately 1,220 feet in length with a
Jun 13, 2021
-
Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in AustriaBy Helmut Westermayr, Michael Tergl
DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t
Jan 1, 2007
-
Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, CaliforniaBy Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan
Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E
Jan 1, 2007
-
Construction of the Seven Thousand Tonne per Day – Big Gossan Production ShaftBy N Herault
PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro
Mar 21, 2011
-
Construction of the South Bay Ocean OutfallBy Michael Jatczak, Brett Robinson
The South Bay Ocean Outfall tunnel is located at the U.S./Mexico Border and is one link in a system designed to treat and dispose of raw sewage entering the Tijuana River Valley from Mexico. The 11 fi
Jan 1, 1999
-
Construction Of The South Interceptor Montreal, Quebec, CanadaBy Jacques Mongrain, Serge Barbeau, Gary Brierley
The Communaute Urbaine de Montreal is currently involved in construction of the South Interceptor which consists of 53 kilometers (33 miles) of 1,800 mm (6.0 ft) to 5,400 mm (18.0 ft) diameter tunnels
Jan 1, 1987
-
Construction of the SR-99 recovery shaftBy Lance Rasband, Richard Hanke, John Starcevich
"Mining on Seattle’s SR99 tunnel began in July of 2013. Initial mining progressed slowly through a 4.5 m (14.9-ft) thick fiber-reinforced concrete headwall before immediately entering the first of thr
Jun 1, 2016
-
Construction of the SR-99 TBM Recovery ShaftBy Lance Rasband, Richard Hanke, John Starcevich
"The world’s largest tunnel boring machine (TBM), at the time of her launch in 2012, the TBM locally referred to as “Bertha,” is incapacitated due to mechanical failure. Bertha’s stoppage places her 2
Jan 1, 2016
-
Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley MineBy Terry Eldridge, Keith MacKay, David Siddle, Luke Moger
On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water
Jan 1, 2016
-
Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMsBy P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo
The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.
Jan 1, 2005
-
Construction of the West Area CSO Tunnels and Pumping StationBy Ray Hutton, Darrell Liebno, Taro Nonaka
Background Population growth and increasingly stringent regulatory controls on water quality across North America have resulted in municipal governments investing heavily in infrastructure to cont
Jan 1, 2007
-
Construction of the Wolf Creek Upper Narrows Tunnel Waterproof Membrane—A Comparison of Tunnel Projects Utilizing the Application of Spray-on Waterproof MembraneBy L. L. Lacerda, A. J. Blair
The Wolf Creek Upper Narrows Tunnel (Upper Narrows Tunnel) is one of the first major highway tunnel in the United States implementing the use of spray-on membrane for purposes of constructing a double
Jan 1, 2005
-
Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam InjectionBy P. Marcheselli, Jean-Yves Peron
A twin tube tunnel of 2 000 meters long and an internal diameter of 6.90 m has been excavated through alluvial ground, with low overburden, using a 8.0 m diameter Earth Pressure Balanced tunneling mac
Jan 1, 1995