Search Documents

Sort by

  • DFI
    Construction of 10’ Diameter Shafts for the Olmsted Approach Walls Project

    By Thomas G. Tavernaro, Jeffrey A. Schaefer

    "The $106 million Olmsted Approach Walls Project, completed in the spring of 2004 by Massman Construction Co., Kansas City, MO, is one phase of a new $1.4 billion Corps of Engineers locks and dam faci

    Jan 1, 2006

  • DFI
    Construction Of A Bicycle And Pedestrian Path West Of The Henry Hudson PWY

    By David Coleman

    This paper presents a case history involving the installation of drilled in piles with rock sockets for the Bicycle and Pedestrian Path project located west of the Henry Hudson Parkway within the Rive

  • SAIMM
    Construction Of A Concrete Plug In South Deep?s Main Shaft To Seal Off A Major Water Intersection

    By M. F. Wells

    The method used to salvage South Deep?s Main Shaft after it was flooded by an inrush of water at about 450 m below collar on 1 May1996 is described. The individual techniques employed in the salvage w

    Jan 1, 1999

  • DFI
    Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details

    By Gordon King

    The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b

    Jan 1, 2003

  • DFI
    Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • DFI
    Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee Program

    By Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas

    The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re

    Sep 8, 2021

  • DFI
    Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.

    By P. M. Wiltcher

    The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high

    Jan 1, 2006

  • DFI
    Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BC

    By Keith MacKay, John Carter, David Siddle, Fernando Faminia

    "The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands

    Jan 1, 2016

  • CIM
    Construction of a Geometallurgical Model, How it should Interact with the Plant Model and the Importance of Final Reconciliation

    By Orlando Rojas, Javier Pizarro, Romke Kuyvenhoven, Francisco Soto

    "The concept of geometallurgy has been extensively mentioned and used in the mining industry in the past years. However, each mining firm has a different understanding of what geometallurgy means, and

    Jan 1, 2016

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017

  • AUSIMM
    Construction of a Large Scale Highway Tunnel by Jacking Methods

    By Nelson G

    The construction and placement of tunnels by means of jacking is continually advancing. This paper presents an outline of the construction of a major highway tunnel placed by a combination of mining a

    Jan 1, 1993

  • SME
    Construction of a Large-Scale Tunnel in Sedimentary Soft Rock Near a Residential Area— Onmawashi-Koen Regulating Reservoir

    By Hiroshi Himura, Shoichi Tsushima, Hiromi Goshima

    This paper reports the construction of an environmentally-friendly tunnel in sedimentary soft rock near a residential area. The main tunnel, which will be used as the Onmawashi-Koen (Park) Regulat

    Jan 1, 2001

  • SME
    Construction of a Long Coal Mine Decline in Southwest Virginia

    By Alwyn Protheroe, Steve Smith, Herbert Jr. Gibson

    In September of 2000, Cowin and Company, Inc., contracted with Paramont Coal Corporation to construct a large decline approximately 820 m (2,700 feet) in overall length at a grade of 8 degrees to the

    Jan 1, 2003

  • SME
    Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector Facility

    By Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen

    At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo

    Jan 1, 2001

  • SME
    Construction of a Mixed Face Reach Through Granitic Rocks and Conglomerate

    By John J. Murray, Michael T. McRae, Michael A. Krulc, Kathy L. Schuler

    The San Vicente Pipeline Tunnel Project involves the construction of an 8.5-foot-diameter water pipeline in an 11 mile tunnel in San Diego, California. The tunnel is located in extremely variable geol

    Jan 1, 2007

  • AIME
    Construction Of A Modern Mineral Processing Plant

    By G. M. Ellis

    When developing a mineral processing facility, the mining company management and engineering staff should have some knowledge of the construction industry in order to work with the contractors involve

    Jan 1, 1978

  • AUSIMM
    Construction of a Monolithic Silica Reverberatory Furnace Bottom

    A poured slag bottom is universally considered to be the best type bottom for copper reverberatory furnaces. It is impervious to molten matte and ready for immediate use.When molten slag is not availa

    Jan 1, 1939

  • DFI
    Construction Of A New Quay Wall For A Sea Tank Terminal In The Port Of Antwerp

    By Stefan Mewes

    Europe’s second-largest seaport has installed a new combi wall consisting of pipe piles, sheet piles and inclined shaft grouted piles to support it. The new Liebherr piling rig with swinging leader wa

    Sep 1, 2022

  • DFI
    Construction Of A Pre-Founded Anchored Wall, Monitoring Of Execution Based On The Eurocode 7 Observation Method, And Taking Account Of The Transmission Of Seismic Forces In The Retaining Structures Towards The Buildings Structure

    By Denis Huber

    The technical assessment of the final works on the "Stéphany Palace" project at Menton in France's Alpes-Maritimes region shows the importance of daily project monitoring based on the observation

    Jan 1, 2002

  • AUSIMM
    Construction of A Sewer Pipeline of 1 200 MM Internal Diameter by A Pipe Jacking Method Using A Small Tunnel Boring Machine

    This is a brief introduction of a sewer pipeline constructed with a pipe jacking method in combination with a 1 200 mm finished inner diameter tunnel boring machine developed for the first time in

    Jan 1, 1987