Search Documents

Sort by

  • AUSIMM
    Computerised Design of Underground Mines

    Having successfully applied computer techniques to open pit mining applications, many software developers are now using their skills to tackle the much harder areas of underground mine design, plannin

    Jan 1, 1992

  • AUSIMM
    Computerised Geological and Mining Ore Reserve Systems at Western Mining Kambalda Nickel Operations

    By Gee C. E

    Ore reserves at the Kambalda Nickel Operations of Western Mining Corporation are estimated using the polygonal method for calculating areas of influence of drillholes. All raw assay and survey data

    Jan 1, 1977

  • AUSIMM
    Computerised Geological Information for Mine Planning at Mt ISA Mine

    Copper grades of diamond drill hole and development samples are determined in the core shed logging area at Mount Isa Mine using a Bulk Mineral Analyser. All geological and grade data on the copper or

    Jan 1, 1985

  • AUSIMM
    Computerised in Project Management

    With the advent of the mini computer and the relational database project management has experienced a new lease of life. The project manager no longer has to wait days for his reports, and he doesn

    Jan 1, 1983

  • AUSIMM
    Computerised Maintenance Systems at WEIPA

    Comalco Aluminium Limited uses a computer system for cost, supply and maintenance reporting and control at its bauxite mine in Weipa, North Queensland. The system collects data on a daily basis at

    Jan 1, 1983

  • SME
    Computerised Mine Planning System At Rio Tinto Minera, S.A. (Spain)

    By C. J. Savage

    Rio Tinto Minera, S.A. operates in Southern Spain, at one of the most ancient mining sites in the world, using advanced computerised mine planning. This paper describes the development and application

    Jan 1, 1986

  • AUSIMM
    Computerised Mineral Data

    Three computerised sets of minerals information are being developed by New Zealand Geological Survey in co-operation with the Resource Management and Mining group of the Ministry of Energy: 1. Geolog

    Jan 1, 1986

  • AUSIMM
    Computerised Orebody Modelling and Mine Design for Chiria Iron Ore Deposit

    By Sen A. K

    The Chiria Iron Ore deposit falls within the well-known Horse-shoe-shaped Singhbhum-Bonai-Keonjhar belt in India, where most of the deposits supplying ore to various steel works of Steel Authority

    Jan 1, 1995

  • SME-ICGCM
    Computerised Subsidence And Displacement Prediction Using Influence Function Methods

    A computerised influence function approach to subsidence and horizontal displacement prediction is described, with particular emphasis being placed on the applicability of the method to irregular- sha

    Jan 1, 1988

  • AUSIMM
    Computerised Underground Diamond Drilling

    Diamond drilling is a relatively new commodity in terms of drilling. The first known diamond drilling activities were carried out in the Swiss Alps around 1863 when the Swiss engineer M Leschot des

    Jan 1, 1995

  • SME
    Computerization In Planning Of Mining Operations At Deep Mines - Development Of The Scientific Method

    By A. S. Astakhov

    Working out of the production calendar plans (schedules) at deep mines which provide for the interaction of all kinds of mining operations determining coal output growth and mining and technical indic

    Jan 1, 1979

  • SME
    Computerization Of Coal Preparation Plants ? 1. Introduction

    By G. C. Hambleton

    There is sufficient indication of the existence of a basic misconception in the Coal Mining industry (on a world-wide basis) as to what computer control really does, what it costs, how it works and ho

    Jan 1, 1981

  • SME
    Computerized Analytical Solutions To Well Problems Using Simple Numerical Techniques - Introduction

    By James M. King

    Analytical models for transient groundwater phenomena, such as those of Theis, Cooper, and Jacob, are important but often limited tools for aquifer evaluation and drawdown prediction. Most were develo

    Jan 1, 1984

  • SME
    Computerized approaches to coal blending

    By M. Gershon

    Four computerized approaches for coal blending are described and their strengths and weaknesses are explored. Spreadsheet analysis Other than word processing, spreadsheet software is the most c

    Jan 1, 1987

  • SME
    Computerized Axial Flow Fan Technology

    By R. Allan Wallis

    In the past mining engineers have tended to rely heavily on the advice of fan manufacturers in relation to fan equipment issues. A more adequate approach was advocated in a paper [ Wallis, 1965 ] subm

    Jan 1, 1989

  • AIME
    Computerized Control And Warning System For Uranium Mines

    By C. T. Sheeran, J. C. Franklin

    A commercially available microprocessor-based system capable of monitoring 512 channels has been interfaced with monitors for radon, working level, air velocity, and fan power. The basic system utiliz

    Jan 1, 1982

  • SME
    Computerized Control At The Deserado Mine

    By R. P. Upadhyay

    The Deserado Mine, located in northwest Colorado, is an underground coal mine designed to produce 1.225 million tons (1.35 million short tons) of clean coal per year for the Bonanza Plant located in n

    Jan 1, 1988

  • TMS
    Computerized Control for a Cooling Tower at Asarco's Amarillo Copper Refinery

    By B. Willit, J. Martin

    "Continued emphasis on water and energy conservation with less operator attention has created a need for more sophisticated cooling tower controls. A joint Betz/ASARCO project has produced a computeri

    Jan 1, 1989

  • SAIMM
    Computerized control in a large electric-arcfurnace shop

    By B. Strohmeier

    An account is given of the use of a computer to control the performance of three ultra-high-powered electric-arc furnaces in Iscor 5 steelmaking plant at Vanderbijlpark, South Africa. Several of the r

    Jan 1, 1985

  • CIM
    Computerized cost estimating for underground mines

    By J. B. Scott

    "A computerized cost estimating program developed with the use of the Lotus 1-2-3 spreadsheet program has produced dramatic savings in preparing estimates for operating costs, equipment fleet size and

    Jan 1, 1988