Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022
By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert
The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover
Dec 1, 2022
-
Emerging Safety and Productivity Technologies for North American Tunneling - NAT2022
By David Maust, Rob Albinger, Mike Walling, Michael Rispin
The safeguarding of health and life is the number one priority for underground infrastructure projects. While culture and approach are critically important, the industry has also seen the development
Dec 1, 2022
-
Newly Adopted Structure Criteria for BART Underground Facilities—Industry Update - NAT2022
By Samer Sadek, Phoebe Cheng, Changmo Kwon, Myat Ohn
BART Facilities Standards (BFS) Structural Criteria is a living document that governs planning, design, and construction of all BART projects. Since its development, the document undergoes incremental
Dec 1, 2022
-
Seattle’s Ship Canal Water Quality Project—Curved Microtunnel Drive - NAT2022
By Chris D. Breeds
Northwest Boring, Inc. (NWB) deployed a skinned up AVN 2000AB Microtunnel Boring Machine (MTBM) to install 7.5-foot long, 118-inch outer diameter reinforced concrete pipe (RCP) sections along an align
Dec 1, 2022
-
Implementation of Vibration Monitoring to Improve Blast Design for the Mitchell Point Crossing - NAT2022
By Nathaniel White, Todd Kilduff, Justin Laviolette, Dan Laviolette, Randy Zeigler, Sean Sundermann
The Mitchell Point tunnel is a part of several ongoing efforts to connect the 12-mile-long Historic Columbia River trail between Mitchell Point Outlook to Mitchell Point Drive. The tunnel lies inside
Dec 1, 2022
-
Courthouse Commons Tunnel: A Case Study of Modern SEM Tunneling - NAT2022
By Yiming Sun, John Stolz, Jakob Walter, Drew Mason
The Courthouse Commons SEM Tunnel was excavated within 6 feet of cover beneath two buildings in downtown San Diego utilizing high-precision geotechnical instrumentation. The excavated dimensions are a
Dec 1, 2022
-
Planning for Emerging Technology Underground Connection Between Rancho Cucamonga Metrolink Station and Ontario International Airport
By Mike Wongkaew, Brandon Kluzniak, Per Vilhelmsson
Rail access to Ontario International Airport (ONT) has long been a goal of San Bernardino County Transportation Authority (SBCTA) to increase public transit options to ONT and provide incoming ONT pas
Dec 1, 2022
-
Horizon Lateral: Reliability to Meet Community Needs Today and Tomorrow - NAT2022
By Ray Brainard, Adriana Ventimiglia, Amanda Kerr
Preliminary design is underway for a new Southern Nevada Water Authority (SNWA) project that will ensure one of America’s most reliable water systems by providing continued, reliable water service to
Dec 1, 2022
-
Applications of Artificial Intelligence in Tunnel Design and Construction - NAT2022
By Gunjan R. Bhattarai, Kumar Bhattarai
Recently, there has been an enormous increase of interest in artificial intelligence (AI), machine learning (ML), and their applications by researchers, government agencies, and the underground constr
Dec 1, 2022
-
Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022
By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis
Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin
Dec 1, 2022
-
Characterizing Gassy Ground and Its Importance - NAT2022
By Barry R. Doyle, Emma C. Ross
This paper presents a 20-year global account of tunneling in gassy ground demonstrating high probability of schedule delays, cost overruns, worker injuries and fatalities. Causes of these failures are
Dec 1, 2022
-
Connecting Three Pump Stations, with Tunnels, on an Island, in Charleston, SC - NAT2022
By Justin Kolster, Donald Benjamin, Kyle White
Expansion of the Plum Island Wastewater Treatment Plant requires interconnection of three operating pump stations using only two existing 10-ft diameter shafts for access. These two existing shafts re
Dec 1, 2022
-
Breaking Conway’s Law: Getting the Benefits from Integrated Design Automation - NAT2022
By David Wright, Jerome Chamfray, Anthony Harding, Brian Boye
Conway’s Law states that unless we intentionally design automation tools around what we need, we will simply replicate our existing processes. While we may achieve some savings this way, there is an o
Dec 1, 2022
-
Micro Seismic Monitoring and Analysis for Rock Burst Prone Tunnels Utilizing TBMs
By G. A. Rosario, G. Peach
Twin 8.5 m diameter, 10 km long headrace tunnels under overburdens of up to 1870 m were excavated for the neelum jhelum hydroelectric project in north-eastern pakistan using two main beam gripper tunn
Dec 1, 2022
-
Benefits and Challenges of Progressive Design-Build Procurement— Atlanta Plane Train Project - NAT2022
By John Murray, Daniel Ebin, Robert Gould
The Atlanta Plane Train project at Hartsfield-Jackson Atlanta International Airport employed the progressive design-build approach. This provided opportunities for collaboration between the design-bui
Dec 1, 2022
-
Slurry Treatment Plants in Mechanized Tunneling Operations— Safety, Performance and Cost Factor for Jobsites - NAT2022
By Gino Vogt
In mechanized tunnelling operations, performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operation
Dec 1, 2022
-
Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022
By Todd Kilduff, James Grillo, Shrey Arora
In efforts to improve ingress/egress from the existing subway platforms in PATH’s Exchange Place Station, a new 18-foot horseshoe cross-passage tunnel was constructed by Walsh Construction who retaine
Dec 1, 2022
-
Construction Challenges of the Anderson Dam Tunnel Project - NAT2022
By Ron Drake
The Anderson Dam Tunnel Project is a high-priority, urgent project under construction by the Santa Clara Valley Water District in California. The project will provide a new low-level outlet for the An
Dec 1, 2022
-
Development of the ITA “BIM in Tunneling—Guideline for Bored Tunnels” - NAT2022
By Jurij Karlovšek, Wolfgang Angerer, Vojtech Ernst Gall, Jacob Grasmick
The International Tunneling Association (ITA) Working Group (WG) 22 “Information Modelling in Tunneling” has developed a guideline for the implementation of Building Information Modeling (BIM) concept
Dec 1, 2022
-
Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022
By Irwan Halim, Seung Han Kim
This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c
Dec 1, 2022