Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Improved Leaching Performance Of Chalcopyrite By Microbial Cultures Subjected To Mutation

    By J. Kang

    To obtain microbial cultures with the ability to efficiently leach copper ion from chalcopyrite, microbial samples from acid mine drainage sites were mixed and then subjected to mutation using sodium

    Jan 1, 2008

  • SME
    California High Speed Rail: Driving the Next Level in Dynamic Tunnel Design - Project Description

    By Carrie Pourvahidi

    The California High Speed Rail Authority (Authority) was created by the State of California through legislation in 1996. The purpose of the Authority is to plan, construct, finance and operate a state

    Jan 1, 2008

  • SME
    Failure Risk Assessment For The Romanian Uranium Mining Waste Dumps

    By St. E. Deák

    Mining activities involve excavation from underground to the surface of large quantities of ore (e.g. uranium and its disintegration products) (Dumitrescu, 2002, 2007). Material with limited content

    Jan 1, 2008

  • SME
    Caldecott Improvement Project

    By William W. Edgerton

    The California Department of Transportation (Caltrans), the Contra Costa Transportation Authority (CCTA), and the Alameda County Congestion Management Agency (Alameda CMA) are involved in a unique par

    Jan 1, 2008

  • SME
    Shaft Sinking at the Seymour?Capilano Filtration Plant

    By Andreas Prucker

    The Greater Vancouver Water District (GVWD) is currently constructing the largest water treatment plant in Canada. As part of this treatment scheme twin water transfer tunnels are being constructed. W

    Jan 1, 2008

  • SME
    Small Diameter Tunneling?Pipe Jacking Under Leipzig Main Train Station

    By Klaus Rieker

    The main train station of Leipzig in Germany is currently being upgraded from a head station to a partially thru station. In order to achieve this, significant ground improvements are necessary. Soil

    Jan 1, 2008

  • SME
    Final Tunnel Liner At The Mill Creek 3 Project

    By M. Schafer

    The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a

    Jan 1, 2008

  • SME
    A Discussion on Design Methods to Improve Long-Term Performance of Tunnel Projects

    By Lei Fu

    In the wake of the collapse of the ceiling panels in the I-90 section of the Central Artery/Tunnel (CA/T) Project in 2006, the long term performance of tunnels became the focus of the tunneling indust

    Jan 1, 2008

  • SME
    Allegheny River Tunnel Crossing Project

    By Paul A. Roy

    The North Shore Connector Project for the Port Authority of Allegheny County constructs twin Tunnel Boring Machine (TBM) tunnels through cohesive soils and rock beneath the Allegheny River and a narro

    Jan 1, 2008

  • SME
    Alternative Contracting Methods?An Update

    By John Reilly

    The author?s paper at RETC 2007, ?Alternative Contracting Methods? addressed strengths and weaknesses of DBB+DB and introduced Construction Manager/General Contractor (Portland model) and Alliancing (

    Jan 1, 2008

  • SME
    Dulles Corridor Metrorail Extension Project - Tunneling Options for Tysons Corner

    By John Rudolf

    Metropolitan Washington Airport Authority is currently undertaking the first Phase of Metro?s Extension to Northern Virginia. A wide range of tunnel options was considered for the Tysons Corner segmen

    Jan 1, 2008

  • SME
    The Current State of Disc Cutter Design and Development Directions

    By Joe Roby

    Rolling disc cutters are the business end of hard rock and mixed face tunnel boring machines (TBMs). Since their first successful employment on a TBM over fifty years ago, disc cutter technology has c

    Jan 1, 2008

  • SME
    Devil?s Slide Tunnels - Unique Challenges

    By Y. Nien Wang

    The Devil?s Slide portion of Highway 1 between Pacifica and Montara is often closed due to the instability of the adjacent slopes. Following many years of public input and careful evaluation of altern

    Jan 1, 2008

  • SME
    The Fallacy of Tunnel Formwork Removal

    By Wern-ping (Nick) Chen

    In concrete lined tunnels, formwork removal timing may be controversial. Contractors seek to strip the form as soon as possible, and designers seek to keep the formwork in place as long as practical t

    Jan 1, 2008

  • SME
    Renewables: An Inconvenient Energy Reality

    By L. Alan Weakly

    Global warming is a political reality in the United States today. The actual impact of the continued utilization of fossil fuels is not known and is open to debate. However, the growing concern abou

    Jan 1, 2008

  • SME
    Integrating Hydro-Fracturing Technology And Geophysics Into 3d Mapping And Extraction Of Metals In Heap Leaching; Hydro-Jex And High Resolution Resistivity ?.

    By Seal. Thom

    Large heap leach operations around the world contain significant under-leached metal values that present recovery challenges to operators. The first challenge is to find the location of the highest

    Jan 1, 2008

  • SME
    Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor

    By Samuel J. Gambino

    Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using p

    Jan 1, 2008

  • SME
    Overview of NFPA 502 Standard for Road Tunnels, Bridges and Other Limited Access Highways, 2008 Edition

    By William Connell

    NFPA 502, Standard for Road Tunnels, Bridges and Other Limited Access Highways establishes minimum fire protection and fire life safety requirements for road tunnels, bridges and other roadways where

    Jan 1, 2008

  • SME
    Mine Development

    By Mike Tracy

    This section of the Handbook deals with general principles to be evaluated in the development of a mining operation. It addresses the major issues that must be examined to fully evaluate a mining vent

    Jan 1, 2008

  • SME
    Jet Grout Ground Modifications for the Brightwater Conveyance System

    By Richard Hanke

    Tunnel construction on the Brightwater Conveyance System?s East and Central contracts required ground modifications of the existing site soils, comprised of sandy alluvium to very dense glacial till,

    Jan 1, 2008