Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Evaluation of Multiple-Seam Scenarios by Non-Traditional Methods
By S. E. Phillipson
The MSHA Technical Support, Roof Control Division's primary evaluation tool for coal pillar designs is the Analysis of Coal Pillar Stability (ACPS) program. However, ACPS is limited to evaluating inte
Jun 25, 2024
-
ICGCM China—History, Networking, and Education
By Syd Peng, W. B. Guo, F. Du, L. Yang, J. Yw. Cheng
The annual ICGCM China was initiated in 2014. Up to 2023, ICGCM China has been held 9 times. In the 9 conferences during the past 10 years, about 559 papers in 17 topical areas were presented and atte
Jun 25, 2024
-
Polyurethane Foam and Alternatives for Void Filling Applications
By Delbert Hamilton, Christopher Snyder
In the last three years there have been four uncontrolled heating events in mines that have been attributed to the use of polyurethane foam as a void fill product. These heating events are due to the
Jun 25, 2024
-
Numerical Study on Mining-Retention Ratio Optimization in Underground Solid Potassium Salt Mine
By Jin Zhao, Weijie Wei, Jinwang Zhang, Xiaohang Wan, Shengli Yang
Reasonable mining-retention ratio (ratio of room width to pillar width) is vital to recovery rate and stope stability in underground mining of solid potassium salt deposits. Based on the engineering b
Jun 25, 2024
-
Valley Bottom Upsidence above a Longwall Operation with Strong Overburden Strata
By Steve Hicks, Zach Agioutantis, Greg Hasenfus, Zach Wedding
Most prediction methods used to calculate mining-induced subsidence rely on empirical formulations, which typically assume flat topography and uniform properties in the overburden. It is also well kn
Jun 25, 2024
-
NIOSH Gas Well Stability Research: A Summary of Ground Control Engineering Considerations
By Peter Zhang, Daniel Su, Bo Kim, Berk Tulu
This paper summarizes significant findings from the ongoing NIOSH Gas Well Stability research over the past decade; in particular, the important ground control engineering considerations. Longwall-ind
Jun 25, 2024
-
Research on Microseismic Passive Velocity Tomography Based on Template Matching Technology
By Shawn Boltz, Erik Westman, Derrick Chambers, Xingdong Zhaoa, Qiankun Zhua
Microseismic passive velocity tomography is becoming an effective technology for large-scale mining-induced stress monitoring in underground mines, especially in the field of early warning of mining-
Jun 25, 2024
-
Analysis Of Regional Seismic Activity Recorded In Polish Coal Mines Of The Upper Silesian Coal Basin Against The Background Of Geological And Mining Conditions In 1995 - 2020 - RASIM 2022
By Grażyna Dzik, Adam Mirek, Krzysztof Król
The Upper Silesian Coal Basin is located in the area of the Upper Silesian Syncline and belongs to one of the most complex tectonic units in Europe. It occupies 5,650 km2. In 2020, there were 20 hard
Apr 26, 2022
-
Methodology to Simulate Triggered and Induced Seismic Activities on a Fault Plane - RASIM 2022
By Atsushi Sainoki
Induced seismicity is deeply related to various engineering projects entailing anthropogenic in-situ stress change in deep underground. Hence, there is a persistent demand for estimating and mitigatin
Apr 26, 2022
-
Monitoring of seismic repeater and aseismic movements in the Garpenberg ore mine, Sweden - RASIM 2022
By Klein E., Kinscher J., Lizeur A., De Santis F., Lhoumaud E.
Seismic repeaters are rarely observed phenomena in underground mines. However, recent studies in Garpenberg mine (Sweden) have demonstrated that seismic repeaters and multiplets may represent signific
Apr 26, 2022
-
Mitigating the Shakedown Hazard in the DOZ Mine Through Detail Ground Motion, Ground Support and Risk Management Strategies - RASIM 2022
By Jurgens PE Hamman, Faisal Putra, Hadnaltias Alpeki, Willem de Beer
The Deep Ore Zone mine is the third lift of caving at PT Freeport Indonesia’s East Ertsberg Skarn System. An increasing trend in seismicity along the northern boundary of the DOZ cave, as well as the
Apr 26, 2022
-
Epicenter accuracy for seismic events recorded on the LUMINEOS network in Legnica-Głogów Copper District, Poland - RASIM 2022
By KOKOWSKI J., RUDZIŃSKI Ł.
The LUMINEOS network was established in 2013 to monitor mining-induced seismicity in Legnica-Głogów Copper District (LGCD), located in south-western Poland. Since the starting time, the network was im
Apr 26, 2022
-
Predicting Mine-Wide Seismogenic Hazard with Confidence Using Calibrated Numerical Models - RASIM 2022
By Kathy Kalenchuk
To develop strategic and tactical strategies to manage seismic hazard in a safe and economic manner, it is necessary to understand the spatial and temporal distribution of mine wide seismogenic behavi
Apr 26, 2022
-
Moment Tensor Analysis of four ML≥2.0 seismic events that occurred at Kloof Gold Mine (South Africa) on 13 June 2017 and a statistical study of their fore- and aftershocks - RASIM 2022
By Musa D. Manzi, Raymond J. Durrheim, Richard T. Masethe
Large mining-induced seismic events and their aftershocks cause hazardous working conditions, damage infrastructure, delay production and pose a risk to miners in the deep-level gold mines of South Af
Apr 26, 2022
-
Rockburst in South African Deep Level Gold Mining: What Do We Know? - RASIM 2022
By Lourens Scheepers
Mining induced seismicity and rockbursts have been part of the deep level gold mining industry in South Africa for many years. One could be forgiven for thinking that we should know everything there i
Apr 26, 2022
-
Detecting Mining Induced Seismic Sources in Drill Core - RASIM 2022
By Rene Padilla, Siyanda B. Mngadi, Gerrie van Aswegen, Peter Stonestreet
While many mine tunnels are developed through ground that must be riddled with the sources of small (and larger) mining induced seismic events, recorded by the mine seismic monitoring systems, we do n
Apr 26, 2022
-
Maintaining a Stability Safety Case in Seismically Active Mines - RASIM 2022
By David Beck
In Australia, Safe Work legislation requires mines to have a documented ‘Safety Case’ explaining how a mine will safely manage all major hazards. A similar requirement is legislated or inferred by reg
Apr 26, 2022
-
Interval estimation of seismic hazard parameters for mining induced seismicity - RASIM 2022
By Stanisław Lasocki
We present an algorithm to integrate the uncertainties of mean activity rate and magnitude cumulative distribution function in the interval estimation of the primary seismic hazard parameters: the exc
Apr 26, 2022
-
Delineating Seismic Hazard Based on Incremental Stress-Strain Response in Seismogenic Volumes - RASIM 2022
By Evan Dressel, Mark S. Diederichs, Kathy Kalenchuk
As hard rock mining develops deeper over time, there is an increasing need to predict the spatial and temporal distribution of adverse seismogenic rockmass reaction to mining. Real-time monitoring and
Apr 26, 2022
-
Automatic processing of mining-related seismic data by machine learning tools - RASIM 2022
By Kazmierczak J. B., Klein E., Kinscher J., Lizeur A., De Santis F.
In this work, we propose to implement machine learning methods for the automatic classification of mining-related seismic data. The approach retained for the classification is based on a Convolutional
Apr 26, 2022