Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Analytical Behavior of a Tunnel with Rock Bolts and Shotcrete During an Extreme Fire Event - NAT2022
By Dean Newman, Michael Behrens, Mark Trim, Justin Arifin
Road tunnels in recent infrastructure projects in Sydney, Australia, are designed to have a fire resistance level of either a 4-hour cellulosic fire or a 2-hour hydrocarbon fire. Where permanent groun
Dec 1, 2022
-
Deep Rock Wastewater Tunnel in Delco - NAT2022
By Dafydd Chandler, Milissa Hirst, Charles Hurst, Gary Snyder, Leszek Glodkowski
The Delaware County Regional Water Quality Control Authority (DELCORA) will be adding tunnel infrastructure to its wastewater conveyance system. This program involves the construction of a conveyance/
Dec 1, 2022
-
The Next Generation of Mixed Ground Tunnel Boring Machines - NAT2022
By Brad Grothen
What is the most economical way of tunneling in mixed ground that may experience high pressures? Non-continuously pressurized, mixed ground Tunnel Boring Machines (TBMs) are being utilized to deal wit
Dec 1, 2022
-
Hybrid Shoring Design for the Courthouse Commons Tunnel in San Diego, California: Controlling and Predicting Ground Movements - NAT2022
By Maryam Motamed, Jeremy Stone, Leigh Anne Zhang
Controlling and predicting ground movements are essential to the design of shoring systems. The Courthouse Commons tunnel in San Diego, California, included a 56-foot-deep temporary shaft as a launchi
Dec 1, 2022
-
Unprecedented In-Tunnel Diameter Conversion of the Largest Hard Rock TBM in the U.S. - NAT2022
By Evan Brinkerhoff, Steve Chorley
The largest hard rock TBM ever to bore in the USA, an 11.6 m diameter Robbins Main Beam TBM, recently underwent a planned in-tunnel diameter change to a more compact 9.9 meters. The first-of-itskind c
Dec 1, 2022
-
Trenchless Utility Relocation Addresses Environmental Impact for Channel Crossing - NAT2022
By John D. Hanifin, C. Kevin Moon, Eric C. Wang
Value Engineering on Connecticut DOT’s Walk Bridge selected the trenchless option for utility relocation to address the channel crossing’s environmental concerns. The design and construction considera
Dec 1, 2022
-
Overcoming Challenges in Tunneling for Albany’s Beaver Creek Clean River Project, Albany, New York - NAT2022
By Jerry Wang, Greg Bold, Mahmood Khwaja, Rebecca Caldon, William Simcoe
Phase III and Phase IV of the Beaver Creek Clean River Project, Albany, NY, includes microtunnel construction of 2,320 feet of 48-inch/36-inch internal diameter (ID) conveyance pipe and a 525 foot lon
Dec 1, 2022
-
Design of Montreal Metro Blue Line Extension Tunnel - NAT2022
By Verya Nasri, Mehdi Bakhshi
The development of the Montreal metro extension Line 5 -Blue Line- toward the northeast are located between the existing Saint-Michel station and Anjou. It consists of 6-km long two-track tunnel, five
Dec 1, 2022
-
Freight Trains in Tunnels—Operational & Safety Aspects from the Tunnel Ventilation Perspective - NAT2022
By Bernd Hagenah, Hans-Peter Vetsch, Eric Jones, Sean Cassady, Danielle Johnson, Petr Pospisil
There are a number of issues associated with freight trains in non-electrified tunnels that are fundamental during the planning and operation of a rail tunnel. During uphill operation, increased air t
Dec 1, 2022
-
Design and Construction Challenges for the North Temple Tunnel - NAT2022
By Todd Kilduff, Michael Tinney
The North Temple Tunnel pedestrian underpass in Salt Lake City, UT was built using a pipe canopy method that met significant challenges in potentially running ground conditions. Kilduff Underground En
Dec 1, 2022
-
Soil Conditioning for Potomac Group Soils in Washington DC - NAT2022
By R. Aliberti, E. Comis, M. Wone
DC Water’s Clean Rivers (DCCR) program involves the construction of approximately 29 km (18 mi) of CSO tunnels in Potomac Group soils in the Washington DC area. Soils include an upper predominantly ov
Dec 1, 2022
-
Hard Rock Tunnel Boring in Challenging Conditions at the Jefferson Barracks Tunnel - NAT2022
By Doug Harding
The Metropolitan St. Louis Water District’s Project Clear is a 28-year program targeting wastewater capacity throughout St. Louis, MO. The extensive program includes the Jefferson Barracks Tunnel, run
Dec 1, 2022
-
Precision Drilling for the Pardee Chemical Feed Shaft Project - NAT2022
By Emily Sing, Ashim Gajurel, Thomas Pennington, William Brown
The Pardee Chemical Feed Shaft Project involves construction of two new chemical feed shafts to improve raw water treatment capabilities at the East Bay Municipal Utility District’s (EBMUD) Pardee Res
Dec 1, 2022
-
Environmentally Friendly Soil Conditioning for EPB TBM: The State of Environmental Considerations in North America and Around the World - NAT2022
By T. Murt, C. Oñate
In recent years, environmental considerations have played a prominent role in underground construction projects. The management and disposal of the muck produced by an EPB TBM is an important aspect o
Dec 1, 2022
-
Effect of Machine and Operational Parameters on Utilization Factor -NAT2022
By Omid Frough, Hossein Changani
Application of Tunnel Boring Machines (TBMs) is one of the main solutions to achieve a safe and high-performance method of construction in hard rock and soft ground tunneling. In order to adequately a
Dec 1, 2022
-
Built to Last? A UK Initiative to Manage Tunnel Infrastructure - NAT2022
By Martin Knights
The UK Industry is preparing a new guide on Tunnel Asset Management that reflects current industry advances, in developed technological innovation and evolving tunnel asset owner requirements. This wi
Dec 1, 2022
-
The Northeast Boundary Tunnel—A TBM Performance Review - NAT2022
By Elisa Comis, Jeffrey Peterson, Yama Ebrahimi
Construction of the Northeast Boundary Tunnel (NEBT), the last leg of the Anacostia River Tunnel System on DC Water’s Clean Rivers Project, started in September 2018 and was completed in April 2021. T
Dec 1, 2022
-
Slurry Wall Construction in Coarse-Grained Soils - NAT2022
By J. Andrew McGlenn, Greg Emslie, Murray Gant
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet a growing population’s lon
Dec 1, 2022
-
Analysis and Design of Tunnel Lining Through a Potentially Displaceable Fault - NAT2022
By Theodore Feldsher, Seung Han Kim, Mourad Attalla, John Roadifer, Chu-Chieh Jay Lin
Lifelines in seismic regions of the world seldom can escape crossing active faults. Cities in California have been mitigating this risk by constructing improved fault crossings. This paper discusses t
Dec 1, 2022
-
Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022
By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent
The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit
Dec 1, 2022