Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Hydrologic Assessment Of Waste Rock Stockpiles: A Case Study From Ajo Mine, Arizona

    By A. L. Williamson, G. Savci

    Hydrologic assessments of existing and proposed waste rock stockpiles (WRS) are typically required for application of operating and closure permits at mine sites. The results of these assessments can

    Jan 1, 2002

  • SME
    Hydrologic Considerations In Mine Closings

    By Allan M. Johnson

    Dewatering is a major operational cost at sane mines. Under certain conditions, costs associated with water disposal may continue beyond the productive life of the mine. For mines with mineralized wat

    Jan 1, 1983

  • SME
    Hydrologic Considerations In Mine-Site Evaluation

    By Lawrence R. Molsather

    Certain hydrologic parameters are affected by development of a mine. These include the area, yield, and storage in a watershed. Alteration of these parameters results in variations in lake levels and

    Jan 1, 1980

  • SME
    Hydrologic Considerations of Underground In Situ Copper Leaching

    By Robert D. Schmidt

    The Cyprus Casa Grande Corporation has provided Bureau of Mines researchers with an opportunity to investigate the hydrology of leaching an in place copper ore deposit. Hydrologic investigations of un

    Jan 1, 1990

  • SME
    Hydrologic Design And Application Problems Associated With Lignite Mining - 1.0 Introduction

    By D. Suarez

    The work of engineers responsible for the design and performance of mine facilities is often challenged by economic and practical constraints in the field. Problems have developed in implementing desi

    Jan 1, 1986

  • SME
    Hydrologic evaluation and environmental behavior of GeoWaste and waste rock in field experimental piles

    By MOHAMMAD R. H. GORAKHKI, CHRISTOPHER BAREITHER, MANUEL APARICIO, IV JOSEPH SCALIA

    Comingling filtered tailings and waste rock in a tailingsdominated mixture is a mine waste management strategy that has the potential to create geotechnically and geochemically stable landforms. Poten

  • SME
    Hydrologic evaluation of post-closure flooding and dewatering of the Homestake Mine

    By Guosheng Zhan

    The Homestake Mine included the open cut and underground workings up to 2,484 m (8,150 ft) deep. The mine ceased mining activities in December 2001 after 125 years of operation. Pumping from the under

    Jan 4, 2010

  • SME
    Hydrologic Impacts Of Phosphate Gypsum Disposal Areas In Central Florida

    By T. M. Gurr

    Large quantities of phosphate rock are mined and processed in Central Florida (Figure 1). The phosphate rock from the mines is further processed in "chemical plants" to produce phosphoric acid (Figure

    Jan 1, 1990

  • SME
    Hydrologic Investigation, Design And Construction Of Flood Control Structures, Copperhill, Tennessee

    By Ulrich Kappus

    The purpose of the project is to divert flood flows of North Potato Creek. The project is located in the southeast corner of Tennessee near Copperhill, approximately 160 kilometers north of Atlanta, G

    Jan 1, 1978

  • SME
    Hydrologic Investigations At Newmont's Gold Quarry Mine, Carlin, Nevada

    By P. M. Pettit

    Hydrologic investigations at Gold Quarry began in 1989 and continued through 1991. Hydro-stratigraphic units include Tertiary sedimentary rocks, Paleozoic siltstones and carbonates. These units displa

    Jan 1, 1992

  • SME
    Hydrologic Issues At The Gilt Edge Superfund Site In The Black Hills Of South Dakota

    By A. D. Davis, C. J. Webb

    Brohm Mining Co.'s Gilt Edge Mine in the northern Black Hills was a surface heap-leach operation that was active from the 1980s until 1999. Financing problems and acid drainage concerns at the mi

    Jan 1, 2003

  • SME
    Hydrologic Issues At The Gilt Edge Superfund Site In The Black Hills Of South Dakota (b3ee2b00-36b5-4e06-bc63-7de2cad4404a)

    By A. D. Davis, C. J. Webb

    Brohm Mining Company's Gilt Edge Mine in the northern Black Hills was a surface heap-leach operation that was active from the 1980s until 1999. Financing problems and acid drainage concerns at th

    Jan 1, 2002

  • SME
    Hydrologic Variations Due to Longwall Mining

    By R. J. Matetic

    The impact of longwall mining on the local hydrological regime has become an important environmental focal point. Unfortunately, only a few studies have addressed the timing and range of well fluid le

    Jan 1, 1986

  • SME
    Hydrologic, Geologic And Geotechnical Aspects Of Long-Term Stability ? 1. Introduction

    By John D. Nelson

    Unprotected uranium mill tailings impoundments can pose a significant risk to nearby inhabitants and the surrounding environment in the event of a prolonged or catastrophic release of contaminants con

    Jan 1, 1984

  • SME
    Hydrological Characterisation And Pollutant Transport Modelling Of Rehabilitated Coal Mine Waste Dumps

    During 1997-2001, an EC funded project investigated the environmental consequences of the use of industrial waste and sewage sludge based artificial top soils (ATS) in rehabilitating large coalmine wa

    Jan 1, 2003

  • SME
    Hydrological Characterization of a Sulphide Waste Rock Dump

    By Greg T. Saretzky, Wilson G. Ward

    A comprehensive hydrologic study was completed far the waste rock dump at Equity Silver Mine, BC. Characterization of the hydrologic system included geologic structure. topography, surface hydrology a

    Jan 1, 2000

  • SME
    Hydrological Consideration Of Groundwater For Planning Of Mine Sealing At Japanese Mine

    By Makoto Terada

    The most important consideration in planning the plugging and sealing of a mine for mine water control is to predict the water flow from the mine. For this purpose, a method of numerical analysis on t

    Jan 1, 1982

  • SME
    Hydrology And Mining In The Tucson Area ? Introduction

    By John W. Harshbarger

    The Upper Santa Cruz Groundwater Basin lies in the drainage area of the Santa Cruz River in Arizona, and extends upstream from the community of Rillito to the international boundary, see Figure 1. The

    Jan 1, 1979

  • SME
    Hydrology Of Dump Leaching And In-Situ Solution Mining

    By D. L. Whiting

    Dump leaching and ,in-situ solution mining have received considerable attention during the past few years due to their apparent economic viability and minimal environmental impact. Solution mining act

    Jan 1, 1977

  • SME
    Hydrology Of Taconite Production On The Mesabi Range

    By Douglas W. Barr

    Water is a necessary part of our environment. It is a biological necessity, but more than that, it is a necessary part of our life style. Those of us who live in the north woods expect water to be par

    Jan 1, 1980