Design and Geotechnical Aspects of Microtunnel Crossings Below Active Rail Alignments
By Andy J. Robinson, Mark D. Claassen
Railroad companies and transit authorities have been slow to acknowledge that for many—utility crossings, a direct pipe installation below live rail can be just as effective as a more intrusive tradit
Jan 1, 2003
-
Design and Implementation of a Fully Integrated Mine Information Management System
By Thomas S. Kovach
In today's competitive energy market, every effort must be made to assure the lowest possible production cost. 'rhi s. paper describes the cooperative effort between the coal producer and th
Jan 1, 1989
-
Design and implementation of a polycarbonate safe haven wall in an underground coal mine - SME Transactions 2013
By R. A. Meyr, K. A. Perry
Following three major mining accidents in 2006, the MINER Act of 2006 was enacted by the U.S.Congress. The U.S. Mining Safety and Health Administration subsequently released the Final Rule on Refuge A
Jan 1, 2013
-
Design And Implementation Of An Environmental Audit Program
By Jerry W. Danni, John E. Hardaway
Corporations today must comply with an ever growing number of complex and increasingly stringent environmental laws and regulations. An environmental audit program is an effective means in which to un
Jan 1, 1992
-
Design And Implementation Of An Onoune Optimising Control System For Processing The Sadiola Hill Oxidised Gold Ore
By O. Guyot, T. Mulpeter
Sadiola Hill mine is located in the sub-Saharan part of Mali. In its first two years of operations, Sadiola Hill mine had already exceeded expectations with respect to profitability, plant capacity, m
Jan 1, 2000
-
Design And Installation Of A 1818 Tonnes, 273 Meter Lift, Vertical Conveying System At White County Coal Pattiki 2 Mine, Carmi Illinois
By S. Crewdson
Vertical hoisting of materials using hoists and skips is common in the Mining Industry. These systems have a number of drawbacks, one being limited hoisting capacity at medium depths. FKC-Lake S
Jan 1, 2003
-
Design And Installation Of Large Diameter Sub-Sea Connecting Shafts For The Seabrook Station Cooling Water System
By Jean-Pierre Nossereau, Allen J. Hulshizer
The main thrust of this paper covers the design, installation techniques and experience associated with the installation of eleven 1.5 m (4'-11") and three 2.87 m (9'-5") diameter shafts in
Jan 1, 1981
-
Design And Manufacture of Conveyor Pulley Assemblies for Drummond Coal Shoal Creek Slope Belt
By Rick Sarkisian, Albert D. Bonneau, David Keech
The Drummond Co. Inc.'s Shoal Creek Coal Mine Slope Belt Conveyor transports 5000 mtph (5500 tph) of material over a length of 1400 m (4600 ft.) and a lift of 3609 m (1180 ft.). Four 1500 kW (200
Jan 1, 1996
-
Design And Operating Characteristics For Large Flotation Cells ? Historical
By Nathaniel Arbiter
The development of flotation machines since the first industrial use of the process can be divided into three stages. The first, up to about 1930, was marked by diversity in the means for contacting f
Jan 1, 1979
-
Design and Operating Considerations for the Application of a Dry Grinding and Roasting Circuit for Refractory Gold Ore
By P. G. Semple, K. W. Major, P. Eng.
The recent increase in development of refractory gold deposits has resulted in changes to the traditional treatment processes. The selection of the preferred refractory treatment process is dependent
Jan 1, 1990
-
Design And Operating Experiences With Flotation Columns In China
By Guoming Liu, Weibai Hu
The designing aspects of column profile, cross-section and height, types of aerator or air sparger, and feeding and discharging devices have been designed and tested. In operating aspects, the flotati
Jan 1, 1988
-
Design and Operating Results of the Nitrox Process ®
By Ken J. Fair, Vicken H. Aprahamian, Gus Van Weert
A consortium of Canadian mining companies, engineering firms and the Ontario Government has supported Hydrochem's efforts in the last year to design and cost a 10 tpd NITROX PROCESS® demonstrati
Jan 1, 1988
-
Design And Operation Of A Microwave Pilot Plant For Calcining Refractory Gold Ores And Concentrates
By P. Brooks, W. LaRochelle, J. M. Tranquilla
EMR's recently commissioned Pilot Plant in Fredericton, N.B. Canada, the latest and largest in the company's sequence of prototype and demonstration systems, is being used as a process development fac
Jan 1, 1998
-
Design And Operation Of The Circulating Fluid Bed Roaster System For The Syama Gold Deposit Project
By S. A. Bunk, W. P. Wood
In the early 1980's BHP identified several potential gold deposits in West Africa. One of these deposits was located in Mali, near the village of Syama. As a result of extensive exploration activitie
Jan 1, 1996
-
Design And Operation Of The Hydrochem Flotation Column
By J. C. Schneider, G. Van Weert
Hydrochem Developments Ltd. has developed and put into full scale operation a novel type of vertical flotation column incorporating a multiplicity of mechanically agitated stages. Characteristics of t
Jan 1, 1988
-
Design And Operation Of Two Stage Rod-Pebble And Autogenous-Pebble Grinding Circuits At Boliden?s Aitik Plant ? 1. General
By Per H. Fahlstrom
The story of the Aitik mine begins in the early thirties. At that time blocks of low grade chalcopyrite impregnations were found in Swedish Lapland not far from the present mine, some 40 miles north o
Jan 1, 1974
-
Design And Operation On Sintering Plants Incorporating Cooling Of The Sinter On The Strand ? Introduction
By J. Astier
The idea of using only one strand for both sintering and cooling of the sinter is not new. In 1952, in the U.S.A. a sintering plant was built at Benson Mine (Star Lake, N.Y.), including : - 68 m2 o
Jan 1, 1974
-
Design and Optimization of Mineral Processing Using Simulation Technology in Brazil
By M. A. S. Martins, J. C. Guillaneau
Steady-state simulation has been proving its usefulness and efficiency in process design and optimization for many years. Steady-state simulation is a very effective approach for plant design since
Jan 1, 1998
-
Design And Performance Of Curved Sag Mill Pulp Lifters
By D. Royston, D. Denlay
Pulp lifters are used to discharge ground pulp from non-overflow grinding mills. In straight-radial channel pulp lifters, discharge is often incomplete and back-flow down the pulp lifter can occur. Le
Jan 1, 1999
-
Design And Performance Of The National Steel Pellet Plant High Temperature Heat Recuperation System
By E. F. Draskovich
In 1984 a high temperature heat recuperation system was installed in the pellet plant of the National Steel Pellet Company located in Keewatin, Minnesota. The system is similar to those of Cleveland C
Jan 1, 1986