Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • ISEE
    Controlling Backbreak with Proper Borehole Timing

    By Calvin J. Konya

    Backbreak behind the last row of boreholes can be a significant problem for blasting operations. Backbreak will interfere with the proper drilling and execution of the subsequent shot and can produce

    Jan 1, 1987

  • ISEE
    Controlling Blast Vibration Effects with On-Site Analysis of Single Hole Signatures: "A New Approach"

    By Randall M. Wheeler

    Computer analyses of single hole signatures are often used to help blasting operators predict the type of ground vibration effects that may be produced from production blasts incorporating various del

    Jan 1, 1989

  • ISEE
    Controlling Fragmentation and Ground Vibrations at Owensville Quarry

    By Rachel Bauer, Jacob Henderson, Dr. Catherine Johnson

    Capital Quarries in Owensville, Missouri faces several challenges when designing a blast that allows for ease of movement while maintaining controlled throw and compliant air over pressure. The primar

    Feb 6, 2023

  • ISEE
    Controlling high risk blasting in an urban environment The Airport Link Story

    By Rob Domotor

    This paper tells the story of using controlled surface and underground blasting methods to excavate hard rock in three areas on Australia’s largest road infrastructure project; the Airportlink Project

    Jan 1, 2012

  • ISEE
    Controlling Overbreak Through Vibration Monitoring

    By Kaushik Dey

    Bord and pillar is the most predominant method of wining of coal in Indian underground coal mines. Development heading in coal mines often encounters roof stability problem and results in roof overbre

    Jan 1, 2008

  • ISEE
    Controlling Vibrations Caused by Underground Blasts in LKAB Malmberget Mine

    By Z X. Zhang

    Ground vibrations from the blasts of the LKAB mine at the Malmberget town had reached 18-19 mm/s from year 2000 to 2002. From 2004 to 2010 the maximum vibrations had been reduced to 9 mm/s and most vi

    Jan 1, 2012

  • ISEE
    Controur Control blasting in Soft Rock Excavation

    By W. Jiao, Y. Yongqi, R. Shan

    Soft rock mines are distributed through out P.R.C. And drilling and blasting is still the main method of driving a tunnel in these mines. Traditional smooth blasting has been widely and deeply studied

    Jan 1, 2000

  • ISEE
    Conversion from Two-Pass Overburden Removal to Cast Blasting at Simplot Phosphates

    By Dale Preece, Steven Case, Cassidy McAllister

    Simplot Phosphates produces high quality phosphate fertilizer through open pit mining. The operation near Vernal, UT began as a three-pass mining process carried out with drill and blast followed by t

    Jan 1, 2012

  • ISEE
    Cooperation in Regulations

    By John Petty, John Loviza

    Single sentence describing content-- "The best ally an Explosives Engineer can have in a court of law is a regulations enforcer stating all codes and standards were met on a jobsite".

    Jan 1, 1996

  • ISEE
    Cooperation in Regulations ( International Society of Explosives Engineers 1996G - Cooperation in Regulations - P 34)

    By John Petty, John Loviza

    As a blaster, have you ever had that uneasy feeing in the pit of your stomach as a codes enforcement official drives onto your jobsite? Have you ever needed an ally in a court of law against an unjust

    Jan 1, 1996

  • ISEE
    Correlating Multi-Phenomenology Measurements with Blast Design in a Cooper Mine

    By Brian Stump, Chris Hayward

    Blasting operations at one copper mine are studied in detail to examine the relation between blast design parameters and near-shot, in-mine, and regional seismic and acoustic observations. Five observ

    Jan 1, 2002

  • ISEE
    Correlating Near-Source Damage from Single-Hole Explosions to Seismic Waves

    By Randy Martin, Jessie Bonner, Peter Boyd, Mark Leidig, Timothy Rath

    We conducted the Vermont Damage Experiment in central Vermont during July 2008. Five single-hole explosions with yields ranging from 60.8 kg (134 lbs) to 122.5 kg (270 lbs) were detonated in homogeneo

    Jan 1, 2010

  • ISEE
    Correlation Between Ground Vibration and Performances of Explosive (Ground Vibration by Underwater Explosion)

    By Minoru Kawamura, Koichi Kurokawa, Yukio Kato, Kenji Hashimoto

    It is well known that ground vibration by blasting is mainly related to a distance and charge weight. However, it is not known the correlation between ground vibration and performances of explosives;

    Jan 1, 1991

  • ISEE
    Correlation of Measurement-While-Drilling Parameters to Fragmentation

    By Kain Petterson, P D. Katsabanis

    Blast fragmentation, determined using image analysis was correlated to drill monitoring parameters in an open pit operation. Average fragment size and 80% passing size showed strong correlation with s

    Jan 1, 2013

  • ISEE
    Correlation of Shot Design Parameters to Fragmentation

    By Mark S. Stagg, Norman S. Smith, Rolfe E. Otterness, Stephen Rholl

    Blast design parameters were studied in an attempt to quantify their relationship to rock fragmentation. The Bureau of Mines conducted a series of 29 reduced-scale shots at the University of Missouri-

    Jan 1, 1991

  • ISEE
    Cosmar and Blasting

    By Lee W. Saperstien

    Section 709 of Public Law 95-87, "Surface Mining Control and Reclamation Act of 1977," requests the National Academy of Sciences to determine if the standards of the act are applicable to minerals oth

    Jan 1, 1979

  • ISEE
    Cost - Benefit Analysis of Using Electronic Detonators in a Large Carboniferous Limestone Quarry in the North of England

    By Bill Birch, Toby White, Ian Brown

    costs/benefits of electronic detonators and measure their effects on primary crusher productivity. 9 blasts (3 shock tube blasts, 6 electronic blasts). Measured electricity consumption & primary crus

    Feb 1, 2020

  • ISEE
    Cost Determination

    By Gary B. Hemphill

    Estimators will agree that estimating for excavation is the most difficult costing task. Equipment costs and production rates are the toughest to determine. The following illustration is a method that

    Jan 1, 1976

  • ISEE
    Cost Effective Loading of Large Diameter Pre-Split Holes

    By LaRay Collyer

    San Juan Mine began pre-splitting the highwall prior to cast blasting in August 1986. The first pre-split shot used six inch PVC (polyvinylcloride) pipe inside a 10 5/8 inch hole, drilled at a 74 degr

    Jan 1, 1990

  • ISEE
    Cost Optimization for Controlled Blasting, Transportation and Crushing

    By Taner Sumer, H Altay Guvenir

    Fragmentation in rock quarries is tried to be achieved by changing the specific charge, drill pattern and bore hole diameters by different experts. This paper is a brief summary consisting of the util

    Jan 1, 1993